S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size) | 7 | 3110.8 | 21775.6 |
2 | Providing hard drown steel for R.C.C. work upto floor two level. | 122 | 51.7 | 6307.4 |
3 | Centering and shuttering for arch roof including all lead and lift. (for low cost House) | 102 | 128.6 | 13117.2 |
4 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 273.5 | 117.02 | 32004.97 |
5 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 49.84 | 230 | 11463.2 |
6 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum | 40 | 75.3 | 3012 |
7 | Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting. | 152 | 410 | 62320 |