S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Providing, lowering in trenches to correct gradient and alignment, jointing with tyton rubber joint and cutting of reinforced cement concrete spigot and socketed pipes and specials with rubber ring ISI marekd as per IS code IS 458-2003 into trenches for all depths and laying out the same to correct alignment, gradients, levels etc. cutting of concrete beds and joints holes, supporting the pipes and specials in correct position in a suitable rigid manner while the same are being jointed and until the surrounding benchings, haunches and envelopes are completed. The pipes shall rest on the beds at all joints through their lengths and fixing of rubber ring, facing, testing the pipes for leakage and making good the same leakage and all defects to the entire satisfaction of the Engineer-in-charge including all cartage etc.(II) RCC Pipes s/s class-NP2. (g) 450 mm i/d pipes. | 19.5 | 1001.81538461538 | 19535.4 |
2 | Earth work excavation in tank/digging work (Tank, Bandh, Pond/New Nalah, New Water Channel and construction of Retaining structure work).(1.1)Earth work excavation in Pond (Dugout, Pond, Mini Percolation Tank, compost Pit etc.) Ring Bandh (percolation Embankment, Earthen Gully plug, Water Harvesting Structure, Silt Distention Dam etc.)/pond/New Nalha/New Channal etc. Retuning wall-( wet or dry soil), laying 15 cm. layer-breaking of clods and emoving of Kankar and grass roots, dressing
of earth work including compaction {with durmut) complete in all respect. (a) Ordinary Soil (i) 1.5 meter vertical lift and 15 meter horizontal lead | 424.5 | 150.821813898704 | 64023.86 |