Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 12:11:20 AM 
Back  
State: MADHYA PRADESH District: MANDSAUR Block: BHANPURA Panchayat: PARONYA
Work Code: 1716001028/DW/9993656126 (Nirmal Neer Kup Nirman Gram Paroniya)
Work Category: Drinking Water
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2015 Work start date : 28/11/2015
Present status : Not Exist Proposed Status : DUGWELLS
Tech Sanction Details
Technical Sanction No. : 349/1028/15-16/AE Sanction Date : 28/11/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
282000 270000 0 0 0 0 0 270000 0 552000
Financial Sanction Details
Financial\Administrative Sanction No: 18/1028/15 Financial\Administrative Sanction Date 28/11/2015
Fin. Sanc. Amt. (in Rs) NREGA:552000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
552000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard110001000
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil11.03777.28572.516
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil11.03813.28969.596
4Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum11.03795.28771.056
5Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)11.03605.26675.356
6Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting11.03759.28373.976
7Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring chiselling (where blasting is prohibited)11.03831.29168.136
8Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Loose or soft soil9.81849.28330.652
9Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Dense or hard soil9.81867.28507.232
10Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Hard moorum9.81895.28781.912
11Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil8.86903.28002.352
12Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil8.86901.27984.632
13Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m23.3539910.65
14Filling foundation and around masonry work with moorum I/c ramming layers and watering.448.353917485.65
15Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)2.482579.56397.16
16Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime Mortar 1: 2(1lime, 2sand)4.894375.821397.662
17Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime mortar 1:3 (1lime putty, 3sand)14.694185.161479.119
18Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime surkhi mortar 1:1:1 (1lime, 1surkhi, 1sand)17.193994.468663.736
19Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime surkhi mortar 1:1:2 (1lime, 1surkhi, 2sand)18.223803.769303.414
20Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement lime mortar 1:1:6 (1cement, 1lime, 6sand)6.12361322111.56
21Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement lime mortar 1:2:9 (1cement, 2lime, 9sand)5.17361318679.21
22Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:3 (1cement, 3sand)6.12361322111.56
2320mm thick cement plaster in two coat on rough side of wall in-Cement mortar 1:5 (1cement, 5sand)20.3201.74094.51
24Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-40 mm thick.15.91212.93387.239
25Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work57.7130.37518.31
26Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work19.23138.12655.663
27Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Loose or soft soil for Tank Work19.23145.92805.657
28Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work19.23153.72955.651
29Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work16.581732868.34
30Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed- Dense or hard soil for Tank Work16.58180.82997.664
31Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed-Hard moorum for Road Work16.58188.63126.988
32Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Well Work16.58196.43256.312
33Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Tank Work14.13480.86793.704
34Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Tank Work14.13492.46957.612
35Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Well Work14.13506.57156.845
36Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Dense or hard soil (PT/30/30)14.13520.67356.078
37Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Tank Work14.13534.77555.311
38Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Well Work14.13548.87754.544
39Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum (CP/3/0.45)14.13562.97953.777
40Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Dence or hard soil (PT/60/60)14.135778153.01
41Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Dense or hard soil (PT/45/45)14.13591.18352.243
42Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil5.3496.2513.708
43Field Technical Supervisior Charge-FTSC14548545485
Total Activity 552000
S.NoMaterialQuantityUnit PriceTotal
140 M.M. METAL8250020000
2Binding wire770490
3Blasting (No)10010010000
4Cement(bori)18030054000
5CONTANGANCY130003000
6dewatering130003000
7false (work) (sentring)7208057600
8Gitti 20 MM10250025000
9Gravel or moorum4050020000
10MASON (PERDAY)204008000
11Pulley set220004000
12Sand14200028000
13STEEL80042.534000
14गिटटी 20 एम एम000
15साईनबोर्ड 125002500
Total Material 270000