State: MADHYA PRADESH District: KHANDWA Block: BALADI Panchayat: LAHADPUR MAL
Work Code: 1725001027/IF/1000058775 (KAPIL DHARA VAHID KHAN HATAM KHAN)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 15/8/2013 Work start date : 14/12/2013
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 451/012 Sanction Date : 12/12/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
144000 96000 0 0 0 0 0 96000 0 240000
Financial Sanction Details
Financial\Administrative Sanction No: 14/012 Financial\Administrative Sanction Date 13/12/2013
Fin. Sanc. Amt. (in Rs) NREGA:240000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
240000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Lime Surkhi Mortar 1:1:1 ( 1 lime putty, 1 surkhi, 1sand )000
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil268.1950.213463.138
3Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)571830.211436.6
4Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead140.6321.93079.797
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)6.33341821635.94
6False work for R.C.C. and P.C.C. work in plinth and foundation127154.219583.4
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars17865.911730.2
8Stacking and boxing.-Moorum or sand4.51567.5
9Transportation of metal 1.39145.35202.0365
10Transportation of metal 5.38161.5868.87
11Transportation of metal 1.39145.35202.0365
12Transportation of metal 7.72145.351122.102
13Transportation of metal 0.18145.3526.163
14FOR EARTHEN DAM - Providing fitter blanket, horizontally, including laying, Spreading, packing etc. in layers of required thickness but excluding excavation of foundation.-Metal 80 mm nominal size4.5150.4676.8
15FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders13.5263.13551.85
16Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil27.1790.12448.017
17Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum27.17117.13181.607
18Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)54.34278.4115128.7994
19Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.202.7513.95104177.665
20Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring chiselling (where blasting is prohibited)1510510
21Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work166.4890.114999.848
22work charge11143111431
Total Activity 240000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL69505700
2blasting25010025000
3Cement(bori)4630013800
4Centering and Shuttering100757500
5Contagecny118001800
6desal pump rent2065013000
7Display board120002000
8Iron angles, Trusses, wind tie000
9MASON (PERDAY)123504200
10P V C PIPE 233501050
11Photocopy & staionary110001000
12Recharge pit LS135003500
13sand (t)412004800
14STEEL190458550
15TRAINSPORT CHARGE141004100
Total Material 96000