State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: KERBANA
Work Code: 1711003/WC/22012035088489 (Const of Stopdem Nala par punahiriya Har kamal singh ke khet ke pass kerbana )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : BP
Execution Agency : Rural Engineering Services(04004) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 13/4/2023 Work start date : 15/6/2023
Present status : Non-existent Proposed Status : Constr of Masonry/CC Anicut for Community
Tech Sanction Details
Technical Sanction No. : 262/23 Sanction Date : 18/5/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
990000 2352000 0 0 0 0 0 2352000 0 3342000
Financial Sanction Details
Financial\Administrative Sanction No: 1973 Financial\Administrative Sanction Date 2/6/2023
Fin. Sanc. Amt. (in Rs) NREGA:3342000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
3342000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting)260.5335.8687491.53
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)250.63855.96966303.576
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)230.63202.63738526.478
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)1665348.12887787.92
5False work for R.C.C. and P.C.C. work in plinth and foundation680174.2118456
6Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height890.7102.791474.89
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars86387.1675219.08
8Transportation of metal 409.38414.75169790.355
9Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.202406.7182155.42
10Providing and filling in foundation trenches and at the back of abutments, wing walls etc. and below pipe bed in layers not exceeding 15cm thick including watering and compacting including all lead and lifts.-Selected granular material in filling.191.52647.42123993.8784
Total Activity 3342000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL1861050195300
240 M.M. METAL190.6950181070
3CEMENT (Beg)2629.41340893999.4
4Contangancy15200052000
5False Work430138.7159645.3
6mooram228.79406.7193051.1809
7Sand (Filling)215.62250485100
8singboard135003500
9steel109079.2786404.3
10steel work720102.573800
11Transporation of Sand190.6585.71111636.326
12Transportation of metal280.6414.75116378.85
Total Material 2352000