State: MADHYA PRADESH District: KHANDWA Block: BALADI Panchayat: SEMRUDH RAIYAT
Work Code: 1725001035/RC/22012034201575 (AANTRIK MARG SAH NALI NIRMAN KAR SARVAN KE GAR SE )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2013 Work start date : 10/1/2014
Present status : Earthern road Proposed Status : Earthern road
Tech Sanction Details
Technical Sanction No. : 00542/12 Sanction Date : 10/1/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
136000 92000 0 0 0 0 0 92000 0 228000
Financial Sanction Details
Financial\Administrative Sanction No: 0012/12 Financial\Administrative Sanction Date 12/1/2014
Fin. Sanc. Amt. (in Rs) NREGA:228000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
228000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil406.481.232999.68
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)21.62244838.4
3Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead3687.483149.28
4Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m000
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)123177.838133.6
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)122478.229738.4
7False work for R.C.C. and P.C.C. work in plinth and foundation240154.237008
8Transportation of metal 21094.3219807.2
9Transportation of metal 10.8161.51744.2
10Transportation of metal 10.2161.51647.3
11Transportation of metal 10.56193.152039.664
12Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.721023.64956
13Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN10557.76058.5
14Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work3.681.2292.32
15Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed-Hard moorum for Road Work10.897.71055.16
16Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting)210118.824948
17Surface dressing of ground, including removing vegetation, and/ or unequalities not exceeding 15cm deep and disposal of rubbish lead upto 20m And lift upto1.5m-Dense or hard soil.70012.88960
18work charge198079807
Total Activity 228000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL109009000
240 mm metal(1.3.6)10.58008400
3cement Begs12529036250
4Centering and Shuttering1508012000
5Rolling Compaction30.557.71759.85
6sand transport Trip4300012000
7Transportation of hard moorum12094.3211318.4
8Transpotation Charges112001200
Total Material 92000