State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: KHARWA
Work Code: 1725006029/IF/9926717008 (कपिलधारा कूप निर्माण कार्य शंकरलाल मंशाराम )
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 26/2/2014 Work start date : 1/3/2014
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 3138/2014 Sanction Date : 26/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
141000 94000 0 0 0 0 0 94000 0 235000
Financial Sanction Details
Financial\Administrative Sanction No: kha13/2014 Financial\Administrative Sanction Date 1/3/2014
Fin. Sanc. Amt. (in Rs) NREGA:235000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
235000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil268.1950.213463.138
2Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead140.6321.93079.797
3Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)6.85341823413.3
4False work for R.C.C. and P.C.C. work in plinth and foundation127154.219583.4
5Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars17865.911730.2
6Stacking and boxing.-Moorum or sand4.51567.5
7FOR EARTHEN DAM - Providing fitter blanket, horizontally, including laying, Spreading, packing etc. in layers of required thickness but excluding excavation of foundation.-Metal 60 mm nominal size4.5150.4676.8
8FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders13.5348.34702.05
9Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil2890.12522.8
10Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum28117.13278.8
11Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)6228817856
12Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.193.6577.26111757.536
13work charge12200022000
Total Activity 235000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL78545978
2Blasting Holas2807019600
3BULLOCK CART3040012000
4Cement(bori)5030015000
5Centering and Shuttering1309011700
6Contagecny11270012700
7MASON (PERDAY)63502100
8P V C PIPE 2111
9Photo copy50021000
10Pipe550250
11sand (t)76934851
12STEEL175508750
Total Material 94000