The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:41:46 PM 
Back  
State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: SATHINI
Work Code: 1713004083/DP/22012034433589 (पेयजल कूप निर्माण मैरहा आदिवासी वस्ती में टी यस 146764/02)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2018 Work start date : 1/10/2018
Present status : Not Exist Proposed Status : Construction of Irrigation Open Well for Community
Tech Sanction Details
Technical Sanction No. : 146754/02 Sanction Date : 16/9/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Public Contribution scheme2 scheme3 Total
307000 228000 0 0 0 0 0 228000 0 535000
Financial Sanction Details
Financial\Administrative Sanction No: 04/83/ Financial\Administrative Sanction Date 18/9/2018
Fin. Sanc. Amt. (in Rs) NREGA:535000 Public Contribution
0
Scheme 2
0
Scheme 3
0
Total
535000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Setting out work Refferance pillers, refferancing bench mark and temporary bench mark Construction of Reference Bench Mark 50x50x70 cm. made of 1:3:6 cement concrete i/c excavation of 50x50x50 cm pit, working benchmark 30x30x45 cm at every 500 m interva151492235
3Filling foundation and around masonry work with moorum I/c ramming layers and watering.76.75745679.5
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)4.543235.414688.716
5Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used1.033235.43332.462
6Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)35.214253149748.13
7Brick bat filling in trenches or soak pits.6.75325.62197.8
8Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee.4400016000
9Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height4400016000
10Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars691.252.336149.76
11Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-40 mm thick.28.5164546882.5
12Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)25.1252313137.76
13Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 12.50 m. to 13.00 m.786.1527458175.248
14Earth work for well excavation-Hard rock requiring blasting lift from 3.00 m. to 3.50m.22.08588.712998.496
15Earth work for well excavation-Hard rock requiring blasting lift from 5.50 m. to 6.00 m.19.23676.313005.249
16Earth work for well excavation- Hard rock requiring blasting lift from 4.00 m. to 4.50 m.22.08676.614939.328
17Earth work for well excavation-Hard rock requiring blasting lift from 4.50 m. to 5.00 m.22.08682.515069.6
18Earth work for well excavation-Hard rock requiring blasting lift from 5.00 m. to 5.50 m.19.23674.412968.712
19Earth work for well excavation-Hard rock requiring blasting lift from 6.00 m. to 6.50 m.97.8769968411.13
20Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)56035.3530176.75
21Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work4.93145.8718.794
Total Activity 535000
S.NoMaterialQuantityUnit PriceTotal
1100 mm pipe110001000
220 M.M. METAL25.27155039168.5
3Binding wire90867740
4Blasting510005000
5Bricks5000525000
6cement Begs20928058520
7Centering and Shuttering231.738018538.4
8Display board115001500
9SAND18.8125023500
10STEEL50058.529250
11Transporation of Boulder160006000
12Transpotation Charges11200012000
Total Material 228000