S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 4605 | 6.64 | 30577.2 |
3 | Work charge | 1 | 48000 | 48000 |
4 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Hard moorum | 2258.16 | 181.56 | 409991.5296 |
5 | Dag-beling-Single spade stroke minimum 75mm deep | 1128 | 0.38 | 428.64 |
6 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 15.83 | 3829.11 | 60614.8113 |
7 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 3.15 | 3175.78 | 10003.707 |
8 | 22cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth. | 136.99 | 370.25 | 50720.5475 |
9 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 2258.16 | 2.38 | 5374.4208 |
10 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 2258.16 | 21.79 | 49205.3064 |
11 | Transportation of metal | 139.99 | 242.27 | 33915.3773 |
12 | Transportation rates for Stone slabs or stone lintels of thickness above 50 mm. | 2258.16 | 111.75 | 252349.38 |
13 | SIGN BOARD | 1 | 3500 | 3500 |