Work Code: 1744006066/LD/22012034534980 (चारागाह विकास निर्माण कार्य गौशाला अतरिया)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 5/12/2020 Work start date : 15/12/2020
Present status : Not Exist Proposed Status : Constr of Earthen peripheral Bund for Community
Tech Sanction Details
Technical Sanction No. : 1744006/2020-2021/472085/TS Sanction Date : 21/12/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
934501.49 562260.24 152.15 569.77 0 0 0 563000 0 1497483.65
Financial Sanction Details
Financial\Administrative Sanction No: 1744006/2020-2021/472085/AS Financial\Administrative Sanction Date 21/12/2020
Fin. Sanc. Amt. (in Rs) NREGA:1498059 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1499000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(a) Dense or hard soil (PT/60/60)79.27159.74075942979712662.65
2Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine.13053.600183908045984698.24
3Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed.130573.668927203065196137.95
4Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )23603.4857206.97
5Filling dug pits with manure/compost for dug-pit size 0.60x0.60x0.60 m (using Manure and Excavated earth for filling)36711.97801089918264395.93
6(I) Pit Size : 0.60 x 0.60 x 0.60 m, height less than 1.5 feet36715.59400544959135723
7(VIII) 81 to 100 km3673.261196.42
8Deduct if filling the dug pit in any year except first year-5400
9Preparation of land :-Fork ploughing, using cultivator 2 times ,cleaning stubbles,clearing clods and formation of ridges .Providing and spreading fertilizers.Irrigation (excluding the cost of electricity)243351.3286702.64
10Planting of root slip for fodder cultivation253426.4106852.8
11For first time/second time/third time/ fourth time/ fifth time in first year/second year/third year/fourth year/fifth year451717.677292
12For the sixth time in first year.21717.63435.2
13For the sixth time in second year/third year/fourth year/fifth year.7214715029
14Raking and earthing485367.5257640
15(I) Providing and spreading fertilizers for the first time in first year25077.31510154.63
16(II) Providing and spreading FYM and fertilizers for second time/third time/fourth time/fifth time in first year87775.9362562207.49
17(III) Providing and spreading FYM and fertilizers for the last time in first year27561.23515122.47
18(IV) Providing and spreading FYM and fertilizers for first time in second year/third year/fourth year/fifth year.74218.5157142857129529.61
19(V) Providing and spreading FYM and fertilizers for second time/third time/fourth time/ fifth time in second year/third year/fourth year/fifth year.324205.13625134564.36
20(VI) Providing and spreading FYM and fertilizers for the last time in second year/third year/fourth year/fifth years.73775.7357142857126430.15
21(I) For the first time in first year242948588
22(II) For second time/third time/fourth time/fifth time/ sixth time in first year.103435.234352
23(III) For first time/ second time/third time/fourth time/fifth time in second year/third year/fourth year/fifth year403649.9145996
24(IV) For the last time in second year/third year/fourth year/fifth year83220.525764
25(I) Watering , Weeding , Hoeing, Training & Pruning, Mulching ,Stacking, Bunding, along sides (thala making), filling the soil in and around the plants, spraying insecticide/pesticide, putting required manure, fertilizer etc, when planted 3m x 3m, complete supervision (in case of survival more than 80%) for first year.266203.39887218045154104.1
26(II) Watering , Weeding , Hoeing, Training & Pruning, Mulching ,Stacking, Bunding, along sides (thala making), filling the soil in and around the plants, spraying insecticide/pesticide, putting required manure, fertilizer etc, when planted 3m x 3m, complete supervision (in case of survival more than 80%) for second year.266143.80830827067738253.01
27(III) Watering , Weeding , Hoeing, Training & Pruning, Mulching ,Stacking, Bunding, along sides (thala making), filling the soil in and around the plants, spraying insecticide/pesticide, putting required manure, fertilizer etc, when planted 3m x 3m, complete supervision (in case of survival more than 80%) for third/fourth/fifth year.665105.16233082706869932.95
28Add for expanses on electricity/diesel for Irrigation (to be used in fodder development project)328550164250
Total Activity 1499000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.0288517.7
20367-Portland Cement0.05785511318.5358
30368-White cement 0.00081574412.5952
40983-Fine sand (zone IV)0.0941076.25101.1675
57900-Modular common burnt clay bricks of class designation 7.5488.84.132018.744
6MR11635-Hire charges for tractor with trolley (including all running expanses and POL)1.196410001196.4
7MR11636-Hire charges for tractor fork ploughing (including POL and running expenses)1482611564
8MR11637-Hire charges for tractor with cultivator (including POL and running expenses)125907080
9MR11638-Root slip for fodder cultivation600001.590000
10MR11639-Electricity/ Diesel Charges for irrigation (Lump Sump)20531.258164250
11MR11659-Phorate 10% CG29.9251053142.125
12MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT0.1352568.25
13MR6032-Snowcem/ durocem0.00152778941.6835
14MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.04868232.736
15MR6089-Hire Charges for tractor with ploughing arrangement including running expanses and driver5.87257084157.73
16MR6103-Urea5271.45.9231206.688
17MR6105-Single super phosphate (SSP) (Danedar)1225.16.357779.385
18MR6106-Muriate of potash339.418.96414.66
19MR6107-Farm yard manure62087.51.274505
20MR6182-Forestry Plants for community plantation (height less than 1.5 feet)367103670
Total Material 408000