Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:31:49 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: NONKISARAI(P)
Work Code: 1703004039/RS/22012034214263 (NALI NIRMAAN KAMAL SINGH PARIHAR SE AANGE KI OR)
Work Category: Rural Sanitation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2014 Work start date : 6/3/2014
Present status : Existing Proposed Status : Drainage Channel
Tech Sanction Details
Technical Sanction No. : 039/3387 Sanction Date : 24/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
200000 69000 0 0 0 0 0 69000 0 269000
Financial Sanction Details
Financial\Administrative Sanction No: 039/232 Financial\Administrative Sanction Date 28/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:269000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
269000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing.120188.622632
2Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.108940.3101552.4
3Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing27068.318441
4Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms.34.08191.46522.912
5Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock.108267.9628939.68
6Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.22.845285.816529.32945
7Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti220.597.621520.8
8Providing and Laying in Foundation Plinth16286162861
Total Activity 269000
S.NoMaterialQuantityUnit PriceTotal
120mm metal111
2Cement111
3Contengency199449944
4SANT111
5Transpotation Charges22.845285.816529.32945
6गिट्रटी परिवहन34.08191.46522.912
Total Material 23000