S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil | 146.02 | 70.62 | 10311.9324 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 3159.36 | 23.54 | 74371.3344 |
3 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 3904.31 | 23.54 | 91907.4574 |
4 | False work for R.C.C. and P.C.C. work in plinth and foundation | 156.78 | 21.64 | 3392.7192 |
5 | Collection of face stones for dam masonry hammer dressed on face, with one line chisel dressed 75mm depth from face on bed, top and sides and hammer dressed below 75mm depth of the stone up to rear face beyond this depth of 75mm the stones may taper, but-Stretcher- size 55 x 35 x 30 cm | 208.26 | 47.07 | 9802.7982 |
6 | Transportation of metal | 143.19 | 47.07 | 6739.9533 |
7 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 73.67 | 47.07 | 3467.6469 |
8 | Field Technical Supervisior Charge-FTSC | 1 | 2000 | 2000 |