S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Cement mortar 1:4 ( 1 cement, 4 sand ) | 459.3 | 127.5 | 58560.75 |
2 | Dag-beling-Single spade stroke minimum 75mm deep | 600 | 0.3 | 180 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 3138.7 | 150 | 470805 |
4 | False work for R.C.C. and P.C.C. work in plinth and foundation | 158 | 360 | 56880 |
5 | Spray painting 1 coats excluding priming coat on new steel and other metal surface with enamel paint. | 5000 | 1 | 5000 |
6 | Collection of approved soil having CBR not less then 12, including stacking at quarry. | 112.5 | 140.7 | 15828.75 |
7 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 177.2 | 210 | 37212 |
8 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 50metres and upto 1.5metre.-Loose or soft soil | 13.8 | 750 | 10350 |
9 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 112.5 | 44.1 | 4961.25 |
10 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 0 | 0 | 0 |