State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: NONKISARAI(P)
Work Code: 1703004039/RS/22012034333095 (NALI NIRMAN BHAGWAN SINGH KE MAKAN SE NADI KI OR)
Work Category: Rural Sanitation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2016 Work start date : 23/1/2017
Present status : Not Exist Proposed Status : Drainage Channel
Tech Sanction Details
Technical Sanction No. : 039/4534 Sanction Date : 24/12/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
95178 165631 0 0 0 0 0 166000 0 260809
Financial Sanction Details
Financial\Administrative Sanction No: 039/8 Financial\Administrative Sanction Date 20/1/2017
Fin. Sanc. Amt. (in Rs) NREGA:260809 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
261000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)11.143307.436844.436
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)14.852202.332704.155
3False work for R.C.C. and P.C.C. work in plinth and foundation33147.84877.4
4Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand)49.52082.1103063.95
5Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Raised and cut pointing132127.616843.2
6Transportation of 20 MM metal9.47362.53432.875
7Transportation of sand32.71320.1310471.4523
8Transportation rates for Masonry stone.49.5578.6228641.69
9Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.13.662283.73875.9094
10Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.6.8203.131381.284
11Site clearance, cutting grass, raking into heaps and removing off the premises000
12Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil118.852.76260.76
13contingency112412.2512412.25
Total Activity 261000
S.NoMaterialQuantityUnit PriceTotal
120mm metal9.4691287.512191.3375
2Contengency127775.2627775.26
3Display board140004000
4PhotoCopy & Stationary100101000
5Photograph110001000
6SANT32.71990.1332387.1523
7Transpotation Charges69.962404.1828277.24116
8सीमेन्‍ट20029559000
Total Material 166000