S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 250 | 6.54196 | 1635.49 |
2 | (I) 1.50 m. to 3.00 m. | 1294.6 | 9.76409701838406 | 12640.6 |
3 | (X) 5.0 Km. Lead | 13.2 | 194.366666666667 | 2565.64 |
4 | b (iii) Dense or hard soil for Tank Work | 1295.64 | 134.187498070452 | 173858.69 |
5 | c (iii) Hard moorum for Tank Work | 940.03 | 178.738125378977 | 168019.2 |
6 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 354.24 | 568.948227190605 | 201544.22 |
7 | 22cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum | 60 | 352.673 | 21160.38 |