State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: NAHAR MAL
Work Code: 1725007049/WC/479 (पेय जल कूप निस्‍तारी तालाब के पास पास/ नहारमाल )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2010-2011 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2010 Work start date : 7/12/2010
Present status : Non-existent Proposed Status : Water Absorption Trench
Tech Sanction Details
Technical Sanction No. : 917aa Sanction Date : 6/12/2010
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
132000 88000 0 0 0 0 0 88000 0 220000
Financial Sanction Details
Financial\Administrative Sanction No: 23aa Financial\Administrative Sanction Date 7/12/2010
Fin. Sanc. Amt. (in Rs) NREGA:220000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
220000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil11.5361.7711.401
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum26.9380.22159.786
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)57.69196.49811335.96962
4Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting230.66421.9897333.9068
5Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)13597.3513142.25
6Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m21.4924.6528.654
7Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)4.712296.410816.044
8Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)8.342445.320393.802
9False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift151.24151.322882.612
10Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars306.346.314181.69
11work charge102651.326513
Total Activity 220000
S.NoMaterialQuantityUnit PriceTotal
110 mm -  M.S. rod200459000
220 mm HG Chips10100010000
36 mm -  M.S. rod96.3454333.5
4Binding wire1060600
5blasting150609000
6Cement7030021000
7Centring & Shuttering151.24609074.4
8Conteng 11462292
9Creach facility1045450
10Diseal pump124505400
11Display board120002000
12Photographs1025250
13Sand (Filling)610006000
14Tools & Plant1600600
15Transpotation Charges2050010000
Total Material 88000