S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Collection of approved soil having CBR not less than 5, including stacking at quarry. | 1180.97 | 184.07 | 217381.1479 |
2 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 146.25 | 185.38 | 27111.825 |
3 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 1180.97 | 89.93 | 106204.6321 |
4 | Transportation rates for Lime (fat), Hydraulic or any other. | 1 | 36347.96 | 36347.96 |
5 | Construction of granular sub-base (GSB) by naturally occurred material or river born material or by crushed metal or mixture of two or more, to bring the material in appropriate grading mentioned in table 400.1, (I, II or III) of specifications for rural | 1561.22 | 132.04 | 206143.4888 |
6 | Construction of hard shoulder as per clause 407 of specifications for rural roads (MORD), with soil having CBR value not less than 12, inclusive of all leads and lifts, providing 4-5% camber by tractor mounted grader or labourers, watering at OMC and comp | 195 | 211.55 | 41252.25 |
7 | Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP: | 511.875 | 548.1 | 280558.6875 |