S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil | 2078.4 | 172.46 | 358440.864 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 5.42 | 2562.5 | 13888.75 |
3 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 679.76 | 165 | 112160.4 |
4 | Providing stone chips under stone pitching | 0 | 0 | 0 |
5 | Snowcem or durocem painting of any shade-2 coats on new work | 0 | 0 | 0 |
6 | Transportation of metal | 2038 | 183.16 | 373280.08 |
7 | Transportation of metal | 2078.5 | 172 | 357502 |
8 | Providing and laying in trenches galvanised mild steel tubes (medium grade) of the following nominal bore, tube fittings (earth work in trenches to be measured and paid for separately)-15 mm dia. | 0 | 0 | 0 |
9 | FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc. | 487.94 | 474.6 | 231576.324 |
10 | FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders | 0 | 0 | 0 |
11 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 956.35 | 52.7 | 50399.645 |