Work Code: 1725007005/RC/600 (ग्रेवल मार्ग खिडगांव मार्ग से कांतिलाल पटेल के खेत)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : Yes
Proposal Date : 1/5/2012 Work start date : 1/5/2012
Present status : No Road Proposed Status : Earthern road
Tech Sanction Details
Technical Sanction No. : 126 vb Sanction Date : 2/5/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
247000 164000 0 0 0 0 0 164000 0 411000
Financial Sanction Details
Financial\Administrative Sanction No: 01 vb Financial\Administrative Sanction Date 10/5/2012
Fin. Sanc. Amt. (in Rs) NREGA:411000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
411000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.37503.412750
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil879.37567.859621.625
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum879.37581.671757
4Dag-beling-Single spade stroke minimum 75mm deep15000.2300
5Collection of approved soil having CBR not less then 12, including stacking at quarry.461.2599.345802.125
6Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 222010.823976
7Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1068.7583.8889646.75
8Transportation rates for Hume pipes (NP-3) 800 mm to 900 mm dia.15463.686955.2
9Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN461.2545.120802.375
10Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.151946.729200.5
11work charge15018750187
Total Activity 411000
S.NoMaterialQuantityUnit PriceTotal
1Display board120002000
2Generator64502700
3Gravel or moorum000
4HumePipes12250030000
5PhotoCopy & Stationary502100
6Photograph1025250
7Rolling Compaction461.2545.120802.375
8Tansportation of water222010.823976
9Transportation of hard moorum1068.7558.7162746.3125
10Transpotation Charges103003000
11पानी टेकर165008000
12रोलर616509900
Total Material 164000