S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 250 | 6.54196 | 1635.49 |
2 | (I) 1.50 m. to 3.00 m. | 1294.56 | 9.76409745396119 | 12640.21 |
3 | (X) 5.0 Km. Lead | 13.2 | 2.53484848484849 | 33.46 |
4 | b (iii) Dense or hard soil for Tank Work | 1295.64 | 134.187498070452 | 173858.69 |
5 | c (iii) Hard moorum for Tank Work | 940.03 | 178.738125378977 | 168019.2 |
6 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 354.24 | 567.18315266486 | 200918.96 |
7 | 22cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum | 60 | 347.701 | 20862.06 |
8 | Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works ) | 1 | 3578.36 | 3578.36 |