S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2500 | 2500 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 3061.84 | 6.645 | 20345.9268 |
3 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 239.74 | 163.567 | 39213.55258 |
4 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Hard moorum | 1501 | 186.56 | 280026.56 |
5 | Excavating post holes (or similar holes) upto 0.5cum including getting out the excavated soil, than returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc., disposing of-Disintegrated or soft rock (not requiring blasting) | 1 | 26000 | 26000 |
6 | Extra rate for laying stone work in or under water and or liquid mud including cost of pumping or bailing out water and removing slush etc, complete etc.(For every 0.3 meter depth) | 1501 | 89.33 | 134084.33 |