S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 3.86 | 35.8 | 138.188 |
2 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 2.63 | 809.9 | 2130.037 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 2.07 | 2160.9 | 4473.063 |
4 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 0.27 | 3296.4 | 890.028 |
5 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size) | 1.24 | 3897.1 | 4832.404 |
6 | False work for R.C.C. and P.C.C. work in plinth and foundation | 16.16 | 154.2 | 2491.872 |
7 | Labour only for item no.0439 | 2.93 | 60.8 | 178.144 |
8 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand) | 1.6 | 3189.7 | 5103.52 |
9 | Add for masonry in supper structure above plinth level up to floor two level | 2.38 | 3346.9 | 7965.622 |
10 | Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee. | 129.5 | 63.4 | 8210.3 |
11 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 125 | 65.9 | 8237.5 |
12 | 10mm thick cement plaster on fair side of wall in-Cement mortar 1:5 (1cement, 5sand) | 22.34 | 78.7 | 1758.158 |
13 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:5 (1cement, 5sand) | 22.34 | 106.2 | 2372.508 |
14 | Providing corrugated C.I. sheet of class III roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with complete excluding the cost of purlins, rafters and trusses.-0.63 mm thick sheet. | 22.75 | 542.5 | 12341.875 |
15 | Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-50 mm thick. | 19.06 | 230.3 | 4389.518 |
16 | White washing whith lime on undecorated wall surfaces (3coats) to give an even shade including thoroughly broomed the surface to remove all dirt, dust, mortar drops and other foreign matter. | 44.88 | 6.5 | 291.72 |
17 | Demolition of thatch roofing including mats, bamboo jaffari, capping to ridges, hips, etc. including stacking of serviceable materials and disposal of unserviceable materials within 100 metres lead. | 51.3 | 18.5 | 949.05 |
18 | Collection of hard metal other then black trap basalt and granite for building work (without blasting) .-40 mm nominal size | 1.13 | 330.8 | 373.804 |
19 | Collection of quarried stone or rubble.-Size 0.014 cum to 0.06 | 1.35 | 150.4 | 203.04 |
20 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 0.45 | 112.8 | 50.76 |
21 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 61.88 | 97.2 | 6014.736 |
22 | Providing and laying in trenches galvanised mild steel tubes (medium grade) of the following nominal bore, tube fittings (earth work in trenches to be measured and paid for separately)-50 mm dia. | 21.3 | 186.7 | 3976.71 |
23 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work | 5.49 | 55.8 | 306.342 |
24 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Loose or soft soil for Tank Work | 3 | 91.3 | 273.9 |