State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: AHARAULIGHAT
Work Code: 1702001007/RC/22012034328754 (C.C.Road Mata Ke Mandir Se Gore Khan Ke Makan Ki Or)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2016 Work start date : 19/2/2017
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 234TS Sanction Date : 16/12/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
209061 139374 0 0 441565 0 0 581000 0 790000
Financial Sanction Details
Financial\Administrative Sanction No: 07 AS Financial\Administrative Sanction Date 18/12/2016
Fin. Sanc. Amt. (in Rs) NREGA:348435 Panchparmeshwar
441565
Scheme 2
0
Scheme 3
0
Total
790000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Double spade "v" shaped stroke 100mm deep6900.5345
2Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.117.07638.874784.316
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)146.273194.2467215.634
4False work for R.C.C. and P.C.C. work in plinth and foundation199.41132.526421.825
5Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)409.46.32579.22
6Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 164.8434.45670.496
7Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms.107.33673.172243.823
8Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1122000122000
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work140.0788.412382.188
10Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Loose or soft soil.40013.85520
Total Activity 790000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL107.331400150262
2CEMENT(BEGS)464300139200
3Convergence Amount1225878225878
4रेत54120064800
Total Material 581000