S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 1 | 1 | 1 |
2 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting | 510 | 292.5 | 149175 |
3 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 87.7 | 945 | 82876.5 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 4.86 | 3766.1 | 18303.246 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 41.2 | 2878.2 | 118581.84 |
6 | False work for R.C.C. and P.C.C. work in plinth and foundation | 34 | 167.2 | 5684.8 |
7 | Stacking without boxing.-Puddle earth, moorum, sand or kankar | 2300 | 11.5 | 26450 |
8 | Stacking without boxing.-Masonry stones, pitching stones or boulders | 510 | 58.1 | 29631 |
9 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 2200 | 137.52 | 302544 |
10 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 3200 | 32.7 | 104640 |
11 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 3200 | 88.4 | 282880 |
12 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil | 450 | 112.8 | 50760 |
13 | work charge | 294 | 1000 | 294000 |