S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Contingency | 1 | 9483 | 9483 |
3 | Work charge | 8 | 1000 | 8000 |
4 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 188.2 | 21.9 | 4121.58 |
5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 239.2 | 35.8 | 8563.36 |
6 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size) | 22.95 | 4165.18 | 95590.881 |
7 | False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift | 334.41 | 223.8 | 74840.958 |
8 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 418.9 | 54.4 | 22788.16 |
9 | TRANSPORTATION OF MATERIAL | 1 | 15962 | 15962 |
10 | Transportation of metal | 24.3 | 176.87 | 4297.941 |
11 | Labour only for boulder soling hand packed excluding consolidation. | 10.8 | 106.2 | 1146.96 |
12 | Labour only for spreading, hand packing, and levelling to gradient and required camber as per MOST 2004 clause 404.3.3 of metal grading-2 & 3 as per MOST 2004 clause 400.2.5 including dressing. | 8.1 | 55.7 | 451.17 |
13 | Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7 | 5.4 | 23.6 | 127.44 |
14 | Providing and laying in trenches 6.0kgf/sqcm working pressure polyethylene pipes of the following outside diameter low density complete with special flange compression type fitting (earth work in trenches is to be measured and paid for separately)-50 mm dia. | 3 | 53.8 | 161.4 |
15 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work | 400.4 | 200.4 | 80240.16 |
16 | Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Dense or hard soil | 27 | 98.14 | 2649.78 |
17 | Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading-2 (Size ranging from 63 mm to 45 mm) | 8.1 | 376 | 3045.6 |
18 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 10.8 | 100.3 | 1083.24 |
19 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 5.4 | 139.1 | 751.14 |