S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2500 | 2500 |
2 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 130 | 0.4 | 52 |
3 | Labour only for item no.0402 | 55 | 32.4 | 1782 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 55.5 | 3014 | 167277 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 14.64 | 2353.7 | 34458.168 |
6 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 55.5 | 406.2 | 22544.1 |
7 | False work for R.C.C. and P.C.C. work in plinth and foundation | 109 | 124.3 | 13548.7 |
8 | Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide) | 45 | 6 | 270 |
9 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 55 | 13 | 715 |
10 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 70.14 | 73 | 5120.22 |
11 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms. | 14.5 | 227.52 | 3299.04 |
12 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms. | 60 | 252.8 | 15168 |
13 | Transportation of sand | 31.15 | 785.52 | 24468.948 |
14 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 55 | 166.32 | 9147.6 |
15 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 31.5 | 73.4 | 2312.1 |
16 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 75 | 79.9 | 5992.5 |
17 | Collection of hard moorum including stacking at quarry. | 55 | 118.3 | 6506.5 |
18 | contingency | 1 | 2216.124 | 2216.124 |
19 | Labour difference in case of old SoR | 473 | 14 | 6622 |