Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 04:37:37 PM 
Back  
State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: MANGOLA
Work Code: 1711003017/IF/1000063266 (kapil dhara koop /ramesur/chaturbhuj kachhi)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 2/10/2013 Work start date : 13/1/2014
Present status : Existing Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 1200/h Sanction Date : 7/1/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
166000 186000 0 0 0 0 0 186000 0 352000
Financial Sanction Details
Financial\Administrative Sanction No: 11/pp Financial\Administrative Sanction Date 9/1/2014
Fin. Sanc. Amt. (in Rs) NREGA:352000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
352000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Contingency11100011000
3Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead265.2221.95808.318
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)22.243375.475068.896
5Add extra for labour only for additional floor or 6.m height and part thereof PCC or RCC work in item no.042611.43638.027292.5686
6False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift437.8223.897979.64
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars482.9654.426273.024
8Transportation of metal 8.7153.81338.06
9Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.10.8176.871910.196
10Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms.5.02320.221607.5044
11Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 50 Kms. and part there of upto 100 Kms.17.4584.810175.52
12Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 100 Kms.8.8766.626746.256
13Transportation of sand5.4251.81359.72
14Labour only for boulder soling hand packed excluding consolidation.10.8106.21146.96
15Labour only for spreading, hand packing, and levelling to gradient and required camber as per MOST 2004 clause 404.3.3 of metal grading-2 & 3 as per MOST 2004 clause 400.2.5 including dressing.8.155.7451.17
16Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.75.423.6127.44
17Providing and laying in trenches 6.0kgf/sqcm working pressure polyethylene pipes of the following outside diameter low density complete with special flange compression type fitting (earth work in trenches is to be measured and paid for separately)-50 mm dia.353.8161.4
18Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil23.8490.12147.984
19Earth work for well excavationSoil Lift from 1.5 m. to 2.00 m.7.94124.2986.148
20Earth work for well excavation-Hard moorum lift from 2.00 m. to 2.50 m.7.94131.31042.522
21Earth work for well excavation-Hard moorum lift from 2.50 m. to 3.00 m.7.94151.51202.91
22Earth work for well excavation-Hard moorum lift from 3.00 m. to 3.50 m.7.94158.61259.284
23Earth work for well excavation-Hard moorum lift from 3.50 m. to 4.00 m.7.94165.71315.658
24Earth work for well excavation-Hard moorum lift from 4.00 m. to 4.50 m.7.94172.81372.032
25Earth work for well excavation-Hard moorum lift from 4.50 m. to 5.00 m.7.94179.91428.406
26Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 5.00 m. to 5.50 m.7.944383477.72
27Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 6.00 m. to 6.50 m.7.94461.53664.31
28Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 6.50 m. to 7.00 m.7.94474.43766.736
29Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 7.00 m. to 7.50 m.7.94487.33869.162
30Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 7.50m. to 8.00 m.7.94500.23971.588
31Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 8.00 m. to 8.50 m.7.94513.14074.014
32Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 10.50 m. to 11.00 m.7.94581.34615.522
33Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 8.50 m. to 9.00 m.7.945264176.44
34Earth work for well excavation-Disintegrated or soft rock (not requiting blasting) lift from 9.00 m. to 9.50 m.7.94538.94278.866
35Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 9.50 m. to 10.00 m.7.94551.84381.292
36Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 10.00 m. to 10.50 m.7.94564.74483.718
37Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 11.00 m. to 11.50 m.7.94597.94747.326
38Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 11.50 m. to 12.00 m.7.94614.54879.13
39Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 12.00 m. to 12.50 m.7.94631.15010.934
40Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 12.50 m. to 13.00 m.7.94647.75142.738
41Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 13.00 m. to 13.50 m7.94664.35274.542
42Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 13.50 m. to 14.00 m.7.94680.95406.346
43Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 14.50 m. to 15.00 m.5.31714.13791.871
44Earth work for well excavation-Hard rock requiring blasting lift from 14.00 m. to 14.50 m.7.94821.56522.71
45Earth work for well excavation-Hard rock requiring chiselling (where blasting is prohibited) lift from 5.50 m. to 6.00 m.7.94610.74848.958
Total Activity 352000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL25125031250
2Cement(bori)20630061800
3Centering and Shuttering437.0970.130640.009
4CONTANGANCY110001000
5desal pump rent000
6IRON SARIYA482.9654.426273.024
7MASON (PERDAY)6030018000
8sand (t)12.08135016308
Total Material 186000