S.No District Block Gram Panchayat Work Name (Work Code) Executing Level Completion Date (DD/MM/YYYY) Est. labour component(in RS.) Est. material component(in RS.) Actual exp. on labour(in RS.) Actual exp. on material(in RS.)
ODISHA
1GAJAPATI GOSANI GHORANI EXCAVATION OF STRAGGED STRENCHES AT RATANSING  (2424001008/WC/10423555) GP 10/08/2022 472291.56 24708.44 199548 10028
2  GOSANI GURANDI Improvement of new tank huda at gurandi   (2424001009/WC/10488381) GP 01/07/2022 72428.28 121159.49 72240 0
3  GOSANI KANTRAGADA RENOVATION OF NEW TANK AT ADASINGI  (2424001010/WC/10417891) GP 01/12/2022 267631.88 27367.89 170568 0
4  GOSANI KANTRAGADA EXCAVATION OF STRAGGED TRENCH AT JAKARBANDHA  (2424001010/WC/10419377) GP 06/09/2022 180061.16 16938.84 76176 10895
5  GOSANI KANTRAGADA EXCAVATION OF STRAGGED TRENCH AT ADASINGI  (2424001010/WC/10419381) GP 04/08/2022 180061.16 16938.84 196650 0
6  GOSANI KANTRAGADA CONSTRUCTION OF STRAGGED TRENCHES AT JAKARABANDHA  (2424001010/WC/10423565) GP 04/08/2022 472291.56 24708.44 386676 20128
7  GOSANI KATALA KAITHA Excavation of Farm Pond of Masa Sabar  (2424001011/WC/10365424) GP 03/06/2022 133806.17 6338.06 83065 5935
8  GOSANI SARADHAPUR RENOVATION OF GRAM BANDHA AT SND PENTHO  (2424001018/WC/10410484) GP 12/08/2022 184181.66 11842.34 197478 0
9  GOSANI SOBARA Excavation of Stragged Trenches at Hatibadi  (2424001019/WC/10365427) GP 14/08/2022 173364.18 14733.64 176364 14340
10  GOSANI TATIPETTI RENOVATION OF PAPI NAIDU TANK AT TATIPATI  (2424001020/WC/10410486) GP 09/11/2022 274538.55 22744.57 281220 0
11  GOSANI UPPALADA Execevation of continueous staggered trench at Rajsitapur  (2424001021/WC/10469018) GP 31/03/2023 282063.79 12032.58 281005 16520
12  GUMMA BADAKOLAKOTE Construction of Teracing wall at Jaradon at Badakalakote.  (2424002002/WC/10507636) GP 01/12/2022 373057.89 59396.42 286824 66690
13  GUMMA BHUVANI IMP. of Mouram road from Changurda to Kantisahi  (2424002004/RC/10341353) GP 15/04/2022 340730 159270 227900 84021
14  GUMMA BRUSAVA Const. of Teracing Wall at Jurubudi  (2424002005/WC/10366269) GP 11/04/2022 112379.57 108375.76 166944 107598
15  GUMMA BRUSAVA CONSTRUCTIONRUCTION OF LBCD AT SODA  (2424002005/WC/10437406) GP 11/04/2022 136632.45 44515.65 196708 44407
16  GUMMA BRUSAVA " CONSTRUCTION OF CONTOUR TRENCH OF PITARA RAITO"  (2424002005/WC/10477288) GP 17/08/2022 102570.71 11025.87 95634 5848
17  GUMMA GAIBA Construction of Stone bounding at Manaul  (2424002006/WC/10506824) GP 15/11/2022 609921.92 141774.12 330972 6564
18  GUMMA GAIBA Construction of House hold Soak pit and compost pit of Raisani Gamango and 44 others of Artana  (2424002006/WC/10517658) GP 02/11/2022 87620.27 140393.96 45288 128741.1187
19  GUMMA GAIBA Construction of House hold Soak pit and compost pit of Santi Bhuyan and 49 others of Dokeijang  (2424002006/WC/10517661) GP 02/11/2022 97355.3 156827.34 63714 154357.2336
20  GUMMA GAIBA Construction of House hold Soak pit and compost pit of Paula Bhuyan and 49 others of Dokeijang  (2424002006/WC/10517662) GP 02/11/2022 96206.45 157520.8 53280 146089.5334
21  GUMMA JEEBA Construction of CC Supporting wall at Area church of Anubudi  (2424002008/WC/10438295) GP 07/09/2022 220620.95 694946.63 209277 565682
22  GUMMA JEEBA Construction of CC Supporting wall at Main road of anubudi  (2424002008/WC/10438296) GP 11/04/2022 113991.02 341057.71 109089 353150
23  GUMMA MUNISINGI Teracing Wall at Brobun  (2424002011/WC/10393955) GP 11/04/2022 114015.69 36613.08 106812 82035
24  GUMMA MUNISINGI Teracing Wall at Ragajul  (2424002011/WC/10393956) GP 11/04/2022 116047.85 34885.32 80608 33095
25  GUMMA MUNISINGI Construction of House hold Soak pit and compost pit of Labina Bhuyan 49 others of Jangala  (2424002011/WC/10520213) GP 01/12/2022 110839.57 149346.39 110778 175422.26
26  GUMMA PARIDA Const. of Trench and Protection wall at U.Bhaleri  (2424002013/WC/10332365) GP 11/04/2022 179998 120002 131652 53148
27  GUMMA SERANGO Const.of Teracing wall at Kuntikui  (2424002015/WC/10365720) GP 11/04/2022 188008.28 112742.31 201204 0
28  GUMMA TARAVA Construction of Soak pit of compost pit of Amit Nayak 39 and others of Samagaita  (2424002017/WC/10520408) GP 01/12/2022 70669.57 138584.3 67488 115285.9804
29  GUMMA TARAVA Construction of Soak pit of compost pit of Aoyano Sabar 38 and others of Linga  (2424002017/WC/10520411) GP 01/12/2022 67708.37 133019.51 44400 98901
30  GUMMA TARAVA Construction of Soak pit of compost pit of Askem Mandal 49 and others of Linga  (2424002017/WC/10520412) GP 01/12/2022 88081.72 172585.22 79920 185487
31  GUMMA TARAVA Construction of Soak pit of compost pit of Pitara Raita 39 and others of Khariguda  (2424002017/WC/10520413) GP 08/12/2022 70669.57 138584.3 65490 134431
32  GUMMA TARAVA Construction of Soak pit of compost pit of Semali Raita 11 and others of Jadada  (2424002017/WC/10520414) GP 08/12/2022 20725.1 42081.99 17760 29848
33  GUMMA TARAVA Construction of House hold Soke pit and compost pit of Asoyo Gamango and 28 others of Gabarjang  (2424002017/WC/10542297) GP 01/12/2022 49921.17 99563.03 47952 99563
34  GUMMA TUMULA Const.of Stone Baunding Wall from Bureising to Kaniba  (2424002018/WC/1380294) GP 07/12/2022 240000 160000 162948 19977
35  GUMMA UKHURA Construction of Water supply pipe line at Sampiba to titisingsahi  (2424002019/WC/10448320) GP 26/08/2022 452968.78 45528.73 230037 16961
36  GUMMA DUMBADA CONSTRUCTION OF LBCD AT SAMPI  (2424002020/WC/10445782) GP 02/11/2022 129638 56220.02 89112 20323
37  KASINAGAR ALADA Const of Check dam of Ghanosagar  (2424003001/WC/10317765) GP 19/09/2022 214000 1000 35672 177991
38  KASINAGAR ALADA Const.of checkdam at Bhut kolia Akram nallo at Allada  (2424003001/WC/10317891) GP 24/05/2022 211200 538800 154155 428576.55
39  KASINAGAR ALADA Const.of checkdam at Akram Nalo at Allada  (2424003001/WC/3158129) GP 19/09/2022 152240 477760 104328 267953
40  KASINAGAR BUDURA IMPURUMENT OF YAPAKARA TANK  (2424003002/WC/10478841) GP 30/08/2022 465040.41 30937.33 139320 13232
41  KASINAGAR GORIBANDHA BEATIFICATION OFCHINTAL TANK  (2424003003/WC/10417729) GP 25/04/2022 466460.8 25665.6 452709 0
42  KASINAGAR GORIBANDHA Construction of protection wall at savara sahi AWC centre at goribandh village   (2424003003/WC/10469166) GP 25/04/2022 90290.22 295018.71 89225 306473.8656
43  KASINAGAR K.SITAPUR Beautification of Sontayana bandho at K sitapur   (2424003005/WC/10484534) GP 06/09/2022 92366.88 281532.46 88760 276845
44  KASINAGAR KHANDAVA Const of Check dam &Protection wall at Sankurunalla at sara  (2424003006/WC/10329151) GP 06/08/2022 133584 406416 77004 201226
45  KASINAGAR KHARADA Const.of Check & Protection wall at Laladulu nala at Babulguda  (2424003007/WC/10317290) GP 19/11/2022 299000 1000 45864 253844
46  KASINAGAR KHARADA Const.of checkdam & Protection wall at Kharinalo at Puruna patra bila  (2424003007/WC/10317291) GP 19/11/2022 356000 1000 102830 252470.5
47  KASINAGAR KHARADA Const.of checkdam & protection wall of K.Govinda rao at Navada  (2424003007/WC/10317292) GP 19/11/2022 192000 1000 42406 149569
48  KASINAGAR KHARADA Const of Checkdam & protection wall of karan batia gaon tala bado bilo  (2424003007/WC/10329029) GP 19/11/2022 264000 1000 98136 164978
49  KASINAGAR KHARADA Const.of checkdam lobanalla near Daibanugram billa at D.Jayapur  (2424003007/WC/10331546) GP 19/11/2022 270000 1000 45120 224027.06
50  KASINAGAR KHARADA Constrection of Chek Dam And Protection Wall At Gadha Billo And Mino mBillo.  (2424003007/WC/10420860) GP 02/11/2022 113512.17 320754.18 136620 252620
51  KASINAGAR KIDIGAM CONSTRUCTION OF CHECKDAM AT BRC VENKATAPUR  (2424003008/WC/10423216) GP 06/09/2022 152016.14 388039.8 154800 339943
52  KASINAGAR KIDIGAM CONSTRUCTION OF CHECK DAM AT KIDIGAM  (2424003008/WC/10424189) GP 07/12/2022 177433.91 452870.39 178020 452106
53  KASINAGAR KIDIGAM CONSTRUCTION OF CHECK DAM AT SUNKANNAPETA  (2424003008/WC/10424495) GP 26/05/2022 177433.91 452870.39 147060 228926
54  KASINAGAR PARTHADA Const.of Checkdam over Tabaraba Nalo Burudi  (2424003009/WC/3157427) GP 26/05/2022 246400 528600 61152 343755
55  KASINAGAR SIDHAMADANGA Improvment of Gopokarra bandho at Sidhamadanga  (2424003012/WC/10423327) GP 26/08/2022 414357.13 29144.45 144564 10895
56  KASINAGAR SIDHAMADANGA Improvment of Butta Bandho at Sidhamadanga  (2424003012/WC/10423329) GP 26/08/2022 418700.43 170144.03 41280 158678.7669
57  MOHONA ADAVA Const.of Protection Wall at Habukapada of Adava GP  (2424004001/WC/10390899) GP 10/08/2022 112655.77 285770.86 146640 0
58  MOHONA ALIGONDA Const.of Road from Begonda to Panguli  (2424004002/RC/3106992) GP 02/11/2022 400000 3000 384924 0
59  MOHONA ANTARABA Const.of Stone Terracing wall Padahalama  (2424004003/WC/10366614) GP 08/05/2022 94039.57 214273.99 149184 136469
60  MOHONA ANTARABA Const. of Stone Terracing wall at Hikirima  (2424004003/WC/10366615) GP 08/05/2022 94039.57 214273.99 116160 193702
61  MOHONA ANTARABA Const.of Stone Teeracing wall Gadikuti Pahada at hachipanka  (2424004003/WC/10366616) GP 11/10/2022 94039.57 214273.99 107196 142753
62  MOHONA ANTARABA Const.of Stone Teeracing wall at Attapada  (2424004003/WC/10366618) GP 25/05/2022 94039.57 214273.99 93669 212221
63  MOHONA ANTARABA Const.of Stone Teeracing wall at Guriguda  (2424004003/WC/10366619) GP 25/05/2022 94039.57 214273.99 115200 209964
64  MOHONA ANTARABA Const. of Protection Wall at Dengama  (2424004003/WC/10426034) GP 11/10/2022 344829.86 62586.75 146200 89745
65  MOHONA ANTARABA Const. of Stone Terracing Wall Janapali Pahada Village at Gilakuta of Antaraba G.P  (2424004003/WC/1372193) GP 08/05/2022 320000 80000 293748 0
66  MOHONA ANTARABA Const. of Stone Terracing Wall at Dururuma Pahada Village at Guriguda of Antaraba G.P  (2424004003/WC/1372196) GP 08/05/2022 400000 100000 303576 0
67  MOHONA BADASINDHIBA Beautification of Tank at Badasindhaba of Badasindhaba GP  (2424004004/WC/10454189) GP 02/08/2022 143512.32 310114.76 121536 294832.4914
68  MOHONA BAGHAMARI Const. of Stone Terracing wall at Tikajharan of Baghamari GP  (2424004005/WC/10390455) GP 04/08/2022 92935.53 211705.62 107912 155763
69  MOHONA BAGHAMARI Const. of Stone Terracing wall at Kureisuni of Padhigam.  (2424004005/WC/10390456) GP 04/08/2022 92935.53 211705.62 113928 171099
70  MOHONA BAGHAMARI Const. of Stone Protection wall at Naringi of Baghamari GP  (2424004005/WC/10390457) GP 08/08/2022 92935.53 211693.62 93624 160796
71  MOHONA BAGHAMARI Const. of Stone Terracing wall at Buduni.  (2424004005/WC/10390458) GP 09/11/2022 92273.11 213900.14 135360 160062
72  MOHONA BAGHAMARI Construction of staggered trench at Panasakhal  (2424004005/WC/10446605) GP 02/11/2022 436800.71 39569.29 428064 27437
73  MOHONA BIRIKOTE Construction of Trench Cum Bond atJenakui Hill at Bhaliasahi  (2424004006/WC/10451824) GP 11/10/2022 474886.62 21747.86 277210 12168
74  MOHONA CHANDIPUT Multipupose farm pond of sri Arjuna Dalabehera, S/o-Bira  (2424004007/WC/10366015) GP 04/11/2022 466011.39 27990.11 217764 0
75  MOHONA CHANDIPUT Const. of Stone Guard wall at Gaon Pahad of Taramala  (2424004007/WC/10421741) GP 21/09/2022 344829.86 62586.75 262476 0
76  MOHONA CHUDANGAPUR Const.of Protection wall at Gunjima of Chudangapur GP  (2424004009/WC/10390884) GP 17/08/2022 107686.09 324342.71 81558 166642
77  MOHONA CHUDANGAPUR Const.of Protection allW at Odia Sahi of Chudangapur GP  (2424004009/WC/10390889) GP 17/08/2022 107686.09 275677.74 103086 123899
78  MOHONA CHUDANGAPUR Const.of Protection Wall at Badakua of Chudangapur GP  (2424004009/WC/10390891) GP 13/09/2022 107686.09 324342.71 99360 46514
79  MOHONA DAMADUA Const. of Grade-I Metalic road from Ashram School to Rachama  (2424004010/RC/10341546) GP 02/09/2022 350000 150000 192296 100924
80  MOHONA DAMADUA Const.of Stone Terrasig wall at T.Damdua  (2424004010/WC/1373657) GP 02/09/2022 350000 150000 156792 68617
81  MOHONA DAMADUA Const.of Stone Terrasig wall at Ghadapanka Pahada  (2424004010/WC/1373659) GP 02/09/2022 300000 200000 173336 98511
82  MOHONA DAMADUA Const.of Stone Terrasig wall at Rajugandanal  (2424004010/WC/1373662) GP 02/09/2022 500000 0 262824 0
83  MOHONA DAMADUA Const.of Stone Terrasig wall at Toamaha  (2424004010/WC/1373663) GP 02/09/2022 500000 0 283316 0
84  MOHONA DAMBAGUDA Construction of Guard Wall from Kumbramara to Samadipada  (2424004011/WC/10422567) GP 01/12/2022 344829.86 62586.75 184785 23712
85  MOHONA DAMBAGUDA Renovation of Tank at Baldumera at Katrapaju  (2424004011/WC/10422804) GP 29/10/2022 311876.04 163742.94 150669 4212
86  MOHONA DAMBAGUDA Renovation of Tank at Sarka  (2424004011/WC/10422811) GP 28/10/2022 311876.04 163742.94 270756 4212
87  MOHONA DAMBAGUDA CONST. OF LOOSE BULDER CHECKDAM AT BUDHABILLA  (2424004011/WC/10423256) GP 24/08/2022 112375.87 187321.63 107226 150523
88  MOHONA DAMBAGUDA CONSTRUCTION OF FIEL CHANNEL FROM KRINJAGADI NO NILDIMERANGA  (2424004011/WC/10431796) GP 29/10/2022 109120.76 348889.46 122958 137189
89  MOHONA DAMBAGUDA Const.of terracing wall at Dambaguda of Dambaguda gp  (2424004011/WC/1373200) GP 03/08/2022 300000 200000 253680 173101
90  MOHONA DAMBAGUDA Terrace Wall at Kamkuti  (2424004011/WC/1373204) GP 10/08/2022 300000 200000 185112 74390
91  MOHONA DAMBAGUDA Terracing Wall at Golapaju  (2424004011/WC/1373205) GP 03/08/2022 30000 16000 29328 15085
92  MOHONA DAMBAGUDA Terrace Wall at Katrapaju Hill  (2424004011/WC/1373206) GP 24/08/2022 35000 21000 33300 19112
93  MOHONA DAMBAGUDA Terrace Wall of Lasinia Tata of Dambaguda   (2424004011/WC/1373207) GP 10/08/2022 300000 200000 163092 66491
94  MOHONA DAMBAGUDA Terrace Wall at Gangasmera of Kuttama  (2424004011/WC/1373208) GP 26/05/2022 37000 73000 36096 71571
95  MOHONA DENGASKHAL Const.of Protection wall at Mahaguda  (2424004012/WC/10366524) GP 11/11/2022 107686.09 324342.71 106698 228388
96  MOHONA DENGASKHAL Const.of Protection wall at Padera Panka  (2424004012/WC/10366528) GP 11/11/2022 110999.5 281805.17 147798 123713
97  MOHONA DENGASKHAL Const.of Protection wall at Bandahuru  (2424004012/WC/10366529) GP 11/11/2022 110999.5 281805.17 137862 197977
98  MOHONA DENGASKHAL const.of terracing well at rajimera  (2424004012/WC/1373464) GP 20/04/2022 365000 135000 284768 132444
99  MOHONA DHADIAMBO Construction of Protection wall at Kankarada of Dhadiamba GP  (2424004013/WC/10420739) GP 14/10/2022 119774.77 195392.27 134430 42071
100  MOHONA DHADIAMBO Const of Farm Pond of Sri Saranga Sabar  (2424004013/WC/10456756) GP 14/10/2022 64165.04 10748.2 52164 0
101  MOHONA DHEPAGUDA Excavation of New Tank at Gothakeli   (2424004014/WC/10412888) GP 25/11/2022 319572.9 165163.7 165168 10530
102  MOHONA DHEPAGUDA Excavation of New Tank at Gothakeli  (2424004014/WC/10424543) GP 02/08/2022 311876.04 158684.44 205668 0
103  MOHONA GULUBA Exvation of multipurpose farm pond of sri pitara majhi at Rapeti  (2424004017/WC/10421962) GP 11/11/2022 191750.69 4917.1 139104 0
104  MOHONA GULUBA CONSTRUCTION OF CHECK DAM AT GULUBA  (2424004017/WC/10443903) GP 11/11/2022 49990.45 432616.34 65790 249652.6808
105  MOHONA GULUBA CONSTRUCTION OF CHECK DAM AT DURINGUDA  (2424004017/WC/10443904) GP 11/11/2022 52512.4 425314.66 65790 221647.9202
106  MOHONA GULUBA Construction of Stone terracing Wall at Hataganda  (2424004017/WC/10463962) GP 11/11/2022 355103.46 56276.51 342710 0
107  MOHONA GULUBA Construction of stone teracing Wall at Kudukima  (2424004017/WC/10464057) GP 11/11/2022 355103.46 56276.51 347010 0
108  MOHONA GULUBA Construction of stone Teracing Wall at Ladiguda  (2424004017/WC/10464066) GP 11/11/2022 355103.46 56276.51 294120 0
109  MOHONA GULUBA Construction of stone teracing Wall at Mutaguda  (2424004017/WC/10464069) GP 11/11/2022 352574.03 58103.41 332820 0
110  MOHONA JEERANGA Const.of stone terracing wall sagada  (2424004018/WC/10422908) GP 08/08/2022 344829.86 62586.75 285246 53822
111  MOHONA JEERANGA Exacavation of contour trench at tentulikhunti  (2424004018/WC/10446609) GP 08/07/2022 474886.62 21747.86 444636 0
112  MOHONA JEERANGA Exacavation of contour trench at sagada  (2424004018/WC/10446612) GP 30/12/2022 474886.62 21747.86 404685 4056
113  MOHONA JUBA Const. of Stone Terracing Wall at Bam of Juba GP  (2424004003/WC/1372194) GP 16/08/2022 300000 200000 216099 20349.3674
114  MOHONA JUBA Const.of stone terracing wall at Dundrum of Juba G.P  (2424004019/WC/1372482) GP 16/08/2022 300000 200000 317331 72146.72
115  MOHONA JUBA Const.of Stone terracing wall at Juba   (2424004019/WC/1372483) GP 16/08/2022 100000 5000 98136 0
116  MOHONA KARCHABADI Construction of Stone Terracing wall at Chapatapanka pahada  (2424004020/WC/10366551) GP 25/11/2022 118746.08 188302.56 105156 116912
117  MOHONA KARCHABADI Excavation of Faram pond of Sri Bhagya Chandra Nayak S/o Maguni  (2424004020/WC/10396800) GP 19/08/2022 178991.28 21010.05 177399 7164
118  MOHONA KARCHABADI Const of Field Channel at Tiyagadi Village Rajama  (2424004020/WC/10427375) GP 25/11/2022 127022.35 323824.43 131125 280197
119  MOHONA KARCHABADI Const. of Teraccing Wall at Rajama  (2424004020/WC/1370240) GP 26/09/2022 400000 100000 169262 85234
120  MOHONA KHARIGUDA Construction Of protection wall at Balibandha   (2424004022/WC/10366516) GP 30/07/2022 112655.78 344015.68 102465 299254
121  MOHONA KHARIGUDA Protection wall at lambdang  (2424004022/WC/10380803) GP 02/08/2022 112655.78 344015.68 89424 259268
122  MOHONA KHARIGUDA Construction of Protection wall at Khariguda  (2424004022/WC/10393237) GP 02/08/2022 112655.78 343926.68 93150 262868
123  MOHONA KHARIGUDA Const of Field Channel at Kharimera Kahalmunda  (2424004022/WC/10429076) GP 06/09/2022 109120.76 348889.46 116541 345201.8692
124  MOHONA MALASAPADAR Const. of stone terracing wall at Chanabania Village at Channabania of Malasapadar G.P  (2424004025/WC/1359546) GP 25/05/2022 260000 140000 240990 119461
125  MOHONA MERAPALLI Renovation of tank at Raiguda of Bandhapada  (2424004027/WC/10331893) GP 11/08/2022 380000 120000 381708 45647
126  MOHONA PINDIKI Const.of Protection wall at Kardikupa (Hundipadar)  (2424004030/WC/10366665) GP 15/11/2022 110256.4 348894.78 151524 0
127  MOHONA PINDIKI Construction of Stone Terracing wall at Ghoda amba Pahad of Kirting  (2424004030/WC/10424670) GP 25/11/2022 344829.86 62586.75 213417 0
128  MOHONA PINDIKI Construction of Stone Terracing wall at Kurugdan Pahad  (2424004030/WC/10450667) GP 15/11/2022 344829.86 62359.32 247250 0
129  MOHONA PINDIKI Const. of Stone Teraccing Wall at Masanipada Hill  (2424004030/WC/1371919) GP 15/11/2022 340000 160000 327321 0
130  MOHONA RAIPANKA Construction of Protectionwall at Gudripanka  (2424004031/WC/10422360) GP 16/08/2022 344829.86 62586.75 188370 57735
131  MOHONA SIKULIPADAR Const of Dugwell of Prasanta Paika  (2424004032/WC/10424549) GP 10/11/2022 58579.32 66944.84 72036 83233.312
132  MOHONA SIKULIPADAR Construction of looseboulder checkdam at patharagada nala  (2424004032/WC/10448939) GP 02/08/2022 132084.93 185626.6 175272 0
133  MOHONA KESARIGUDA Const.of Protection Wall at Tapagiri  (2424004036/WC/10366436) GP 22/10/2022 107686.1 345764.26 128526 81519
134  MOHONA KESARIGUDA Const.of Protection Wall at Nuagan  (2424004036/WC/10366439) GP 22/10/2022 107523.66 298309.51 125897 131954
135  MOHONA KESARIGUDA Const.of Protection Wall at Nuashi  (2424004036/WC/10366440) GP 22/10/2022 107686.1 345757.26 121448 68033
136  MOHONA KESARIGUDA Const.of Protection Wall at Bhaliasahi  (2424004036/WC/10366443) GP 22/10/2022 107686.1 345757.26 108288 100415
137  MOHONA JARROW Const.of farmpond of Sri Laibara Gomango at Kutrakhal of Jarrow G.P  (2424004038/WC/10331773) GP 25/05/2022 140000 60000 95013 0
138  MOHONA JARROW Construction of Protectionwall at jarrow Nuabila of Jarrow GP  (2424004038/WC/10390311) GP 04/08/2022 107686.1 345764.26 107916 344378.6554
139  NUAGADA ANUGURU Construction of Stone terracing at Sukuma hill  (2424005001/WC/10424850) GP 25/04/2022 231117.04 99913.4 233595 248629
140  NUAGADA ANUGURU Construction of Stone terracing at Tilikar hill  (2424005001/WC/10424852) GP 17/08/2022 231117.04 99913.4 206172 283734
141  NUAGADA ANUGURU Const. of stone terracing at Ranglamba.  (2424005001/WC/1380725) GP 18/04/2022 10032 0 10032 0
142  NUAGADA ATTARSINGI CONST. OF LBCD AT CHAMPAPUR NALA  (2424005002/WC/10332570) GP 18/04/2022 300000 200000 336789 158211
143  NUAGADA ATTARSINGI CONST. OF LBCD TUMBAUL NALA  (2424005002/WC/10332573) GP 19/04/2022 300000 200000 307188 179118
144  NUAGADA ATTARSINGI Const of Stone terracing at Guruba Hill  (2424005002/WC/10422074) GP 18/08/2022 241821.22 100062.71 237654 261618
145  NUAGADA ATTARSINGI Construction of Stoneterracing at Pechierpahada  (2424005002/WC/10425756) GP 18/08/2022 231117.04 99801.4 195157 258972
146  NUAGADA ATTARSINGI Construction of Stoneterracing at Ringising Pahada  (2424005002/WC/10427708) GP 18/08/2022 231117.04 99801.4 196501 221952
147  NUAGADA ATTARSINGI Construction of Stoneterracing at Ringising pahada  (2424005002/WC/10428694) GP 10/11/2022 231117.04 99825.76 228811 260430
148  NUAGADA ATTARSINGI Construction of Stoneterracing at ragadetal  (2424005002/WC/10445015) GP 10/11/2022 245819.53 126074.43 202200 233078
149  NUAGADA ATTARSINGI construction of stone bounding at Rajaul hill  (2424005002/WC/10498095) GP 10/11/2022 245819.53 127092.68 235640 249719.2
150  NUAGADA ATTARSINGI Construction of Stoneterracing Bounding at Sarabir hill  (2424005002/WC/10498424) GP 16/10/2022 245819.53 127092.68 244771 253596
151  NUAGADA ATTARSINGI Construction of Stone bounding at Jarubtal to Jalangar  (2424005002/WC/10498429) GP 10/11/2022 245819.53 127092.68 198772 202968
152  NUAGADA ATTARSINGI Construction of StoneBounding at Arengjoda hill  (2424005002/WC/10498449) GP 31/10/2022 245819.53 127092.68 205110 224074
153  NUAGADA BETARSINGI C/O LBCD at Subulada  (2424005003/WC/10421371) GP 01/12/2022 163273.4 121593.04 146200 324281
154  NUAGADA KHAJURIPADA Construction of Stone terracing at Jarirtusa hill  (2424005005/WC/10427113) GP 01/12/2022 231117.04 100067.36 234780 256546
155  NUAGADA KHAJURIPADA Construction of Stone Terracing of at Tentuli Sahi  (2424005005/WC/10464993) GP 01/12/2022 254701.31 91106.33 249830 219953
156  NUAGADA KHAJURIPADA Construction of Step Stone Terracing at Karari hill  (2424005005/WC/10493717) GP 01/12/2022 245819.53 127092.68 238220 214740
157  NUAGADA KIRAMA Construction of Stone Terasing at rajpur Hill  (2424005006/WC/10424535) GP 10/11/2022 145022.84 58813.62 203688 92160
158  NUAGADA KIRAMA Construction of Trench Cum Stone Bunding at Tabar Sahi  (2424005006/WC/10448021) GP 18/04/2022 229028 97923.47 211140 175690
159  NUAGADA KIRAMA Construction Stone Terrasing of Bayash Khajubad at Tabarsahi  (2424005006/WC/10468793) GP 18/08/2022 254701.31 91106.33 342065 145840
160  NUAGADA NUAGADA Const. of Stone Terracing at Sadhu Parbata  (2424005008/WC/10343856) GP 18/04/2022 250000 250000 247572 247473
161  NUAGADA NUAGADA Renovation of Drain at Ward no-8  (2424005008/WC/10409277) GP 02/12/2022 126560.59 327702.71 92115 181005
162  NUAGADA NUAGADA CONSTRUCTION OF STONE TERRACING AT PRADIP CHINCHANI KAJU HILL SOURI PARBATA  (2424005008/WC/10426439) GP 19/08/2022 247964.49 94491.35 245305 251985
163  NUAGADA NUAGADA Construction of Stone Terracing at Mahatab kaju hill  (2424005008/WC/10428425) GP 03/12/2022 231117.04 99913.4 238002 238200
164  NUAGADA NUAGADA Construction of Stone Terracing at Bangrutal Meena Mandal hill  (2424005008/WC/10428427) GP 02/12/2022 231117.04 99913.4 227776 247806
165  NUAGADA NUAGADA Construction of Stone Bunding at Gudguda hill  (2424005008/WC/10489658) GP 11/11/2022 245819.53 127092.68 239118 252075.28
166  NUAGADA NUAGADA Construction of Stone Bunding at Laibingtal hill  (2424005008/WC/10489663) GP 03/12/2022 245819.53 127092.68 236676 243044.94
167  NUAGADA PAIK ANTARADA Renovation of Tank at Bada Badha Manikpur.  (2424005009/WC/10317662) GP 15/08/2022 300000 287000 85176 89298
168  NUAGADA PAIK ANTARADA Construction of Stone terracing at Guar During hill  (2424005009/WC/10426975) GP 27/04/2022 231117.04 99801.4 252747 241002
169  NUAGADA PAIK ANTARADA Construction of Stone Terracing at sanuru hill  (2424005009/WC/10426979) GP 01/12/2022 231117.04 99801.4 207678 199435
170  NUAGADA PAIK ANTARADA Construction of Catchement Treatment of Radia Ambo Ghach  (2424005009/WC/10443669) GP 27/04/2022 231117.04 100067.36 253245 240531
171  NUAGADA PARIMALA RENOVATION OF TANK AT SIBA MANDIRA,PARIMALA  (2424005010/WC/10397484) GP 02/09/2022 278019 15982.9 178179 47320
172  NUAGADA PARIMALA Construction of stone Bounding at Mundabula hill  (2424005010/WC/10427752) GP 03/11/2022 231117.04 99825.76 238435 244665
173  NUAGADA PARIMALA Construction of stone Terracing Karipahada hill  (2424005010/WC/10427757) GP 03/11/2022 231117.04 99825.76 222324 172833
174  NUAGADA PARIMALA Construction of stone Terracing Arangsing hill  (2424005010/WC/10428736) GP 01/12/2022 231117.04 99825.76 210622 106076
175  NUAGADA PARIMALA Renovation of Tank at Parimala Chaka  (2424005010/WC/10476470) GP 03/11/2022 166524.63 125784.53 147408 147084
176  NUAGADA PARIMALA Const. of Stone Terracing at Daneising Hill,Parimala  (2424005010/WC/1379982) GP 28/04/2022 51888 52947 51888 52947
177  NUAGADA PUTRUPADA Construction of Stoneterracing at Kabata Shila hill  (2424005011/WC/10424843) GP 16/10/2022 262131.8 88674.02 251765 244660
178  NUAGADA PUTRUPADA Construction of Stoneterracing wall at Balipadara  (2424005011/WC/10424871) GP 16/10/2022 245819.53 127092.68 231770 264480
179  NUAGADA PUTRUPADA Construction of LBCD at Tuma Nal  (2424005011/WC/10425763) GP 18/08/2022 133634.25 134623.73 150081 144228
180  NUAGADA PUTRUPADA Construction of LBCD at Rangdaula Nala  (2424005011/WC/10428306) GP 01/12/2022 133634.25 132038.53 145655 340799.7845
181  NUAGADA PUTRUPADA Construction of LBCD at Luba Nala  (2424005011/WC/10428310) GP 18/04/2022 136539.89 129720.32 166410 333270
182  NUAGADA PUTRUPADA Consyruction of Stoneterracing at Tubursing Pahada  (2424005011/WC/10439705) GP 18/04/2022 256675.74 91709.07 256710 239130
183  NUAGADA PUTRUPADA Construction of Stoneterracing Wall at Jalargar hill  (2424005011/WC/10439709) GP 19/08/2022 226703.03 100154.51 193452 290130
184  NUAGADA PUTRUPADA Construction of Stoneterracing Wall at Godabandha to Bhaludali  (2424005011/WC/10439711) GP 09/08/2022 271012.69 86799.7 262085 210700
185  NUAGADA PUTRUPADA Construction of Stoneterracing Khaja amba to Kharipadar  (2424005011/WC/10439723) GP 09/08/2022 226703.03 100154.51 223644 269830
186  NUAGADA PUTRUPADA Construction of LBCD at Salankai nalla  (2424005011/WC/10477653) GP 16/12/2022 163273.4 122209.72 162451 163946.8506
187  NUAGADA PUTRUPADA Construction of LBCD at Puturupada nalla  (2424005011/WC/10485191) GP 01/12/2022 144526.23 174938.66 155221 294962.5
188  NUAGADA PUTRUPADA Construction of Stoneterracing wall at Rajital hil  (2424005011/WC/10486698) GP 19/08/2022 245819.53 127092.68 231985 259990
189  NUAGADA TABARADA CONST. OF CHECK DAM AT KARANJA NALA AT UPPER KETUNGPADA  (2424005013/WC/10342847) GP 16/12/2022 80000 420000 86940 369249
190  NUAGADA TABARADA Construction of Stone Terracing at Bhimu Mountain  (2424005013/WC/10424866) GP 16/12/2022 241821.22 100062.71 249228 194857
191  NUAGADA TABARADA Construction stone bounding at jully Mountain  (2424005013/WC/10437249) GP 29/04/2022 231117.04 99937.76 231066 255607
192  NUAGADA TABARADA Construction of Drain From Church To SchoolChrch to   (2424005013/WC/10459363) GP 29/04/2022 139058.95 314112.41 138030 343756
193  NUAGADA TABARADA Const. of Metal Concrete Protection Wall at Golli  (2424005013/WC/1364921) GP 28/04/2022 200000 800000 203288 779828
194  NUAGADA TITISINGI CONST. OF CUNTER BUNDING AT JABJABAR   (2424005014/WC/10332398) GP 10/11/2022 300000 200000 207568 61947
195  NUAGADA TITISINGI Construction of Protection wall at Baroi Upper sahi  (2424005014/WC/10397497) GP 18/08/2022 247467.95 664767.46 129792 464683
196  NUAGADA TITISINGI Construction Of Counter Bounding at Bibijar Mountain   (2424005014/WC/10417456) GP 18/04/2022 157725.59 125924.71 137862 126308
197  NUAGADA TITISINGI Construction Of Counter Bounding at Jardaul Mountain  (2424005014/WC/10417457) GP 17/07/2022 157725.59 125924.71 183816 120000
198  NUAGADA TITISINGI Construction Of Counter Bounding at Rumdul Upper Mountain  (2424005014/WC/10417459) GP 18/08/2022 157725.59 125924.71 122958 110019
199  NUAGADA TITISINGI Construction Of Counter Bounding at Jhula sahi Mountain  (2424005014/WC/10417460) GP 18/04/2022 157725.59 125924.71 140346 203398
200  NUAGADA TITISINGI Exevation Of Dug Well of Sri Amosh karjee  (2424005014/WC/10417470) GP 18/04/2022 58579.32 65826.67 42228 66235
201  NUAGADA TITISINGI construction of Stone Terracing at Lalakim Parbata  (2424005014/WC/10423231) GP 18/04/2022 241821.22 96464.47 186300 170923
202  NUAGADA TITISINGI Construction of Stone Terracing at Grama Parbata Baroi  (2424005014/WC/10423232) GP 18/04/2022 241821.22 96464.47 253368 104050
203  NUAGADA TITISINGI construction of Stone Terracing at Pandita Parbata Baroi  (2424005014/WC/10423233) GP 18/04/2022 241821.22 96464.47 216729 91238
204  NUAGADA TITISINGI Construction of stone terracing Susasari Parbata  (2424005014/WC/10423241) GP 18/04/2022 241821.22 96464.47 247158 96000
205  NUAGADA TITISINGI Construction Of Stone Terracing at Tamdingar Hill  (2424005014/WC/10423248) GP 13/04/2022 241821.22 96464.47 181746 93030
206  NUAGADA TITISINGI Construction Of Stone Terracing at Samuel Hill  (2424005014/WC/10423255) GP 13/04/2022 241821.22 96464.47 260115 93030
207  NUAGADA TITISINGI Construction Of stone Terracing at sala Parbata  (2424005014/WC/10423582) GP 18/04/2022 241821.22 88352.47 237015 94084
208  NUAGADA TITISINGI Construction Of Stone Terracing at Gurandakal Parbata  (2424005014/WC/10423584) GP 18/08/2022 241821.22 96464.47 173466 95546
209  NUAGADA TITISINGI Constructin of Stone Terracing at Manmul Parbata  (2424005014/WC/10423586) GP 18/04/2022 241821.22 96464.47 170154 76669
210  NUAGADA TITISINGI Construction Dry Stone Protection Wall at Adangar  (2424005014/WC/10425696) GP 18/04/2022 142315.48 129209.14 99360 52165
211  NUAGADA TITISINGI Construction Of Stone Terracing at Manasingul Hill  (2424005014/WC/10425774) GP 17/08/2022 231117.04 99937.76 296838 95000
212  NUAGADA TITISINGI Construction of Stne terracing at kuradataul Parbata  (2424005014/WC/10428481) GP 18/04/2022 231117.04 99913.4 228528 86826
213  NUAGADA TITISINGI Construction Of Stone Terracing at Bangala Hill  (2424005014/WC/10431965) GP 18/04/2022 231117.04 99937.76 233703 99000
214  NUAGADA TITISINGI Construction Of Stone Terracing at Alkuda Hill  (2424005014/WC/10431966) GP 18/04/2022 231117.04 99937.76 220455 99732
215  NUAGADA K JHALRASING Const. of stone terracing at Badaamba.(basaamba)  (2424005015/WC/10317298) GP 16/08/2022 380000 120000 305230 104442
216  NUAGADA UDAYAPUR Construction of stone Terracing at Anusahi hill  (2424005016/WC/10424019) GP 02/04/2022 241821.22 100062.71 264546 231215
217  NUAGADA UDAYAPUR Construction of Stone terracing at puruna sahi hill  (2424005016/WC/10426639) GP 01/12/2022 241821.22 100062.71 263304 217672
218  NUAGADA BADAPADA CONST. OF SSTONE BOUNDING AT ASADIYA AMBAGACHA MOUNTAIN AT BADAPADA.  (2424005014/WC/1366700) GP 18/04/2022 300000 200000 387504 110085
219  NUAGADA BADAPADA Renovation of Tank at Odia Sahi  (2424005018/WC/10425554) GP 01/12/2022 796709.11 190893.76 317560 180000
220  NUAGADA BADAPADA Construction of lbcd at markanda naik nalo  (2424005018/WC/10443569) GP 11/11/2022 157198.03 121532.44 198513 211926
221  NUAGADA BADAPADA Construction of Stone Terracing at Nadia hill  (2424005018/WC/10443576) GP 28/04/2022 260443.28 90082.23 295410 176866
222  NUAGADA BADAPADA Construction of Stone Teracing at Budigacha hill  (2424005018/WC/10443577) GP 28/04/2022 259493.06 89085.34 309600 175866
223  NUAGADA BADAPADA Construction of Stone Terracing at Belapada Hill  (2424005018/WC/10443580) GP 28/04/2022 257592.63 87091.57 314760 168120
224  NUAGADA BADAPADA Construction of Stone Terracing at Pedisila hill  (2424005018/WC/10464723) GP 01/12/2022 258542.85 88088.46 305730 185006
225  NUAGADA BADAPADA Construction of Stone Terracing at Mahula gacha hill  (2424005018/WC/10481957) GP 01/12/2022 259493.06 89085.34 309600 170120
226  NUAGADA BADAPADA Construction of Stone Terracing at Odia sahi hill   (2424005018/WC/10481960) GP 28/04/2022 238393.54 91350.41 272190 202202
227  NUAGADA BADAPADA Construction of Stone Terracing at Badapada hill  (2424005018/WC/10481965) GP 28/04/2022 238393.54 91350.41 237360 247168
228  NUAGADA TANGILI Construction of Stone Teracing at Elasing pahada  (2424005019/WC/10427904) GP 14/08/2022 231117.04 99801.4 242508 192360
229  RAYAGADA DAMBALO Construction of Field Channal at Mureisahi of Dambalo GP  (2424006001/WC/10422222) GP 05/09/2022 195137.67 747158.17 163323 242986.6483
230  RAYAGADA DAMBALO Excavetion of Tank at Daribaital at Mandalsahi  (2424006001/WC/10473715) GP 19/08/2022 372546.22 106803.4 239295 0
231  RAYAGADA DAMBALO Construction of Open well at Yagabul of Munisingi  (2424006001/WC/10485757) GP 19/08/2022 65933.97 46444.53 65790 0
232  RAYAGADA DAMBALO Construction of Stone bonding cum Trenching of Krupasindhu Bhuyan of Dambala GP  (2424006001/WC/10505176) GP 06/09/2022 141880.7 31021.41 112445 5000
233  RAYAGADA DAMBALO Construction of Stone bonding cum Trenching of Bidyadhar Bhuyan of Dambala GP  (2424006001/WC/10505178) GP 06/09/2022 141880.7 31021.41 90730 5000
234  RAYAGADA DAMBALO Construction of Counter Trenching cum Bonding of Sabita Karjee of S Sagan of Dambala GP  (2424006001/WC/10505179) GP 05/09/2022 141880.7 31021.41 90300 5000
235  RAYAGADA DAMBALO Construction of Counter Trenching cum Bonding of Kora Bhuyan of S Sagan of Dambala GP  (2424006001/WC/10505186) GP 28/03/2023 141880.7 31021.41 70755 5000
236  RAYAGADA DAMBALO Construction of Counter Trenching cum Bonding of Nidrabati Bhuyan of S Sagan of Dambala GP  (2424006001/WC/10505187) GP 30/08/2022 141880.7 31021.41 100620 5000
237  RAYAGADA GANDAHATI Excavation of tank at S.Laupur  (2424006002/WC/10329913) GP 27/04/2022 64930 5070 55440 2568.5
238  RAYAGADA GANDAHATI Construction of CC Drain at Gandahati Parsubandha to Masani  (2424006002/WC/10405633) GP 29/04/2022 111992.11 321395.29 175440 275622.18
239  RAYAGADA GANDAHATI Construction of CC Drain at Adagaon of Gandahati GP  (2424006002/WC/10405635) GP 27/04/2022 111992.11 321395.29 125442 317235.8752
240  RAYAGADA GANDAHATI Construction of Dug well at talasingi Deep sahi  (2424006002/WC/10450765) GP 29/04/2022 73973.66 288033.77 30222 184940.09
241  RAYAGADA GANDAHATI Construction Of Countour Trenches at Bangada  (2424006002/WC/10483969) GP 21/02/2023 474647.91 22246.79 187309 0
242  RAYAGADA GANDAHATI Construction Of Countour Trenches at Buluda Village  (2424006002/WC/10483972) GP 29/04/2022 474647.91 22246.79 288960 0
243  RAYAGADA GANDAHATI Construction Of Countour Trenches at Laupur Village  (2424006002/WC/10483976) GP 29/04/2022 474647.91 22246.79 224460 0
244  RAYAGADA GANDAHATI Construction of Counter Trench at Kuising at Gandahati GP  (2424006002/WC/10483985) GP 31/07/2022 474647.91 22246.79 381055 0
245  RAYAGADA GANDAHATI Construction of Counter trnches at Latigam at Gandahati GP  (2424006002/WC/10483987) GP 29/04/2022 474647.91 22246.79 255420 0
246  RAYAGADA GANDAHATI Construction of Counter trnches at Kinchillingi at Gandahati GP  (2424006002/WC/10483988) GP 22/02/2023 474647.91 22246.79 233672 0
247  RAYAGADA GANDAHATI Construction of Counter trnches at Munisingi at Gandahati GP  (2424006002/WC/10483991) GP 02/11/2022 474647.91 22246.79 315444 13073
248  RAYAGADA GANDAHATI Construction of Counter trenches at Gandahati Bada at Gandahati GP  (2424006002/WC/10483992) GP 29/04/2022 474647.91 22246.79 163400 0
249  RAYAGADA GANDAHATI Contour Trench With Bund at Kendu Jhola , S.Laupur  (2424006002/WC/10559458) GP 10/11/2022 927315.33 47211.07 550560 11318
250  RAYAGADA GANDAHATI Excavation of Field chhanal from Arjunabila to Masani  (2424006002/WC/1377122) GP 12/03/2023 178000 22000 93600 0
251  RAYAGADA GANGABADA EXCAVATION OF TANK AT BARAGHARA NEW COLONY AT BARAGHARA OF GANGABADO GP  (2424006003/WC/10421744) GP 05/08/2022 388929.04 99346.25 189198 0
252  RAYAGADA GANGABADA Lose Boulder Check Dam at Chhamundia Nallo of Gangabada GP  (2424006003/WC/10473820) GP 02/11/2022 152642.48 125997.62 171785 118413
253  RAYAGADA JEERANGO Excavation of Tank at Galagada  (2424006004/WC/10404539) GP 30/05/2022 363686.32 90172.49 270963 26224
254  RAYAGADA JEERANGO Construction of Loose Boulder Check Dam at Engarba Nalla of Jeerango GP  (2424006004/WC/10455831) GP 20/05/2022 109165.26 190277.2 117763 191224
255  RAYAGADA JEERANGO Construction of Loose Boulder Check Dam at Rasibada Nalla of Jeernago GP  (2424006004/WC/10455834) GP 17/10/2022 109165.26 190277.2 53965 122115
256  RAYAGADA JEERANGO Construction of Stop Dam at Banguruba Nalla of Jeernago GP  (2424006004/WC/10455835) GP 30/05/2022 241821.22 97114.39 124821 88112
257  RAYAGADA JEERANGO Construction of Stop Dam at Banguruba of Jeernago GP  (2424006004/WC/10455836) GP 30/05/2022 241821.22 88105.89 109089 88112
258  RAYAGADA JEERANGO Construction of Stop Dam at Engaraba of Jeernago GP  (2424006004/WC/10455838) GP 20/05/2022 241821.22 97114.39 81351 98112
259  RAYAGADA JEERANGO Construction of Continuous Contour Trench for Community at Bangarba of Jeerango Gp  (2424006004/WC/10505972) GP 06/09/2022 353534.98 61614.85 195865 0
260  RAYAGADA JEERANGO Construction of Continuous Contour Trench for Community at Gurasahi of Jeerango Gp  (2424006004/WC/10505974) GP 05/11/2022 353534.98 61614.85 159745 0
261  RAYAGADA JEERANGO Construction of Continuous Contour Trench for Community at Galaganda of Jeerango GP  (2424006004/WC/10506065) GP 17/10/2022 353534.98 61614.85 171140 6084
262  RAYAGADA JEERANGO Construction of Terracing Wall at Salda Hill of Jeerango GP  (2424006004/WC/10506074) GP 17/10/2022 542092.26 166767.32 371506 173676.7962
263  RAYAGADA JEERANGO CONSTRUCTION OF LBCD ATASHOK NALA PHAGE 1  (2424006004/WC/10560638) GP 01/12/2022 279044.42 333558.62 132978 305626.7425
264  RAYAGADA JOLANGA Renovation of Tank at Nadilandha Dumba of Jolango GP  (2424006005/WC/10330194) GP 02/06/2022 27735 2265 23478 0
265  RAYAGADA JOLANGA Construction of Tank at Dumba  (2424006005/WC/10404538) GP 30/04/2022 365476.09 106226.72 257508 10084
266  RAYAGADA KARADASINGI Construction of Drain at Anchala of Karadasingi  (2424006006/WC/10425852) GP 25/04/2022 487063.2 9869.6 252126 5482
267  RAYAGADA KERANDI Countour Trenche at Antersing  (2424006007/WC/10483615) GP 01/12/2022 476696.75 23303.24 291423 4212
268  RAYAGADA KERANDI Construction Of Loose Boulder Check Dam at Kerandi  (2424006007/WC/10483617) GP 01/11/2022 149589.63 130640.46 130181 129556.56
269  RAYAGADA KOINPUR CONSTRUCTION OF EARTH DRAIN AT LUMUDASING OF KOINPUR GP  (2424006008/WC/10418181) GP 01/04/2022 484019.06 13839.17 227784 0
270  RAYAGADA KOINPUR CONSTRUCTION OF FIELD CHANNEL FROM SABAR SAHI TO NEAR CANAL  (2424006008/WC/10429376) GP 15/10/2022 479452.84 17793.51 158853 0
271  RAYAGADA KOINPUR Construction of Staggered Trench for Community at Suba & Langasahi of Koinpur GP  (2424006008/WC/10481927) GP 06/09/2022 476696.75 23303.24 207792 0
272  RAYAGADA KOINPUR Construction of Staggerd Trench at Mada and Madaba of Koinpur Gp  (2424006008/WC/10505762) GP 29/03/2023 474647.91 20281.79 389828 9056
273  RAYAGADA KOINPUR Construction of Staggerd Trench for Community at Taraba of Koinpur Gp  (2424006008/WC/10505764) GP 29/03/2023 474647.91 20281.79 225330 5000
274  RAYAGADA LAILAI Construction of Loose Boulder Check Dam at Sanaloba Bhuyan Sahi of Lailai GP  (2424006009/WC/10495258) GP 11/12/2022 193867.41 171621.69 173652 126954.2152
275  RAYAGADA LAILAI Construction of Loose Boulder Check Dam at Sanaloba Badaraito Sahi of Lailai GP  (2424006009/WC/10495260) GP 11/12/2022 193867.41 171621.69 194178 141624.51
276  RAYAGADA LAILAI Construction of Stone Graded Bund for Community at Tilli of Lailai GP  (2424006009/WC/10502599) GP 02/11/2022 550562.45 166951.19 532098 166950.072
277  RAYAGADA LAILAI Construction of Stone Graded Bund at Budusahi Parbata Phase-II of Lailai GP  (2424006009/WC/10505970) GP 05/02/2023 271046.13 88883.66 228438 87881.404
278  RAYAGADA LAXMIPUR Excavation of Tank at Pultunga Nala  (2424006010/WC/10416347) GP 05/11/2022 363686.32 89258.18 442470 6306
279  RAYAGADA LAXMIPUR Construction Of Countour Trenches at Landusahi at Laxmipur GP  (2424006010/WC/10483274) GP 05/11/2022 476696.75 23303.24 273480 15344
280  RAYAGADA LAXMIPUR Construction Of Countour Trenches at Laxmipur  (2424006010/WC/10483279) GP 01/12/2022 476696.75 23303.24 295696 15344
281  RAYAGADA LAXMIPUR Construction Of Countour Trenches at Kinada at Laxmipur GP  (2424006010/WC/10483282) GP 29/03/2023 476696.75 23303.24 148796 9056
282  RAYAGADA LAXMIPUR Construction of Loose Boulder Check Dam at Langasahi  (2424006010/WC/10484645) GP 29/03/2023 149589.63 130640.46 185439 116853.74
283  RAYAGADA LAXMIPUR CONSTRUCTION OF CONTOUR TRENCHES AT GOTIDA OF LAXMIPUR GP  (2424006010/WC/10501736) GP 29/03/2023 474647.91 23281.79 214140 11084
284  RAYAGADA LAXMIPUR Construction of Terracing Wall at Betarsing of Laxmipur GP  (2424006010/WC/10502225) GP 29/03/2023 298850.69 75373.33 287664 83810
285  RAYAGADA LOBA Construction of Loose Builder Checkdam at Bhramarsingi   (2424006011/WC/10420504) GP 20/07/2022 106041.38 111221.38 154585 75982.422
286  RAYAGADA LOBA Construction of Loose Bulder Checkdam at Kekesing   (2424006011/WC/10420505) GP 20/07/2022 106041.38 111221.38 123840 66311.6376
287  RAYAGADA LOBA Construction of Loose Builder Checkdam at Talasahi   (2424006011/WC/10420508) GP 20/07/2022 106041.38 111221.38 109650 77262.666
288  RAYAGADA LOBA Construction of Loose Builder Checkdam at Talasahi   (2424006011/WC/10420509) GP 13/10/2022 106041.38 111221.38 78690 47700
289  RAYAGADA LOBA Construction of Counter trenches at loba of loba gp  (2424006011/WC/10454897) GP 19/08/2022 474886.62 17859.86 304440 17859.86
290  RAYAGADA LOBA Construction of protection wall at medical sahi of loba gp  (2424006011/WC/10454898) GP 11/10/2022 110731.89 339283.99 67932 189000
291  RAYAGADA LOBA Construction of Drain at Kekesing ward no-1 of loba gp  (2424006011/WC/10454900) GP 13/10/2022 474886.62 17859.86 457287 16190
292  RAYAGADA LOBA Costruction Of Counter Trenches at Bhramarsing of Loba GP  (2424006011/WC/10475445) GP 19/08/2022 470474.35 19845.06 273480 15248
293  RAYAGADA LOBA Construction of Contour Trenches aT Talasahi of Loba GP  (2424006011/WC/10495948) GP 19/08/2022 460988.98 26610.2 276060 24181
294  RAYAGADA LOBA Construction of Contour Trenches aT Medical sahi of Loba GP  (2424006011/WC/10495949) GP 19/08/2022 460988.98 26610.2 326800 22070
295  RAYAGADA LOBA Construction of Contour Trenches aT Kekesing bhuyan sahi of Loba GP  (2424006011/WC/10495950) GP 19/08/2022 460988.98 26610.2 350450 22707
296  RAYAGADA LOBA CONSTRUCTION OF CONTOUR TRENCHES WITH BUND AT DAHISERA HILL OF KEKESING OF LOBA GP  (2424006011/WC/10560224) GP 29/03/2023 788886 91236.4 683316 80461
297  RAYAGADA NARAYANPUR Construction of Loose Boulder Check Dam at Bagharala  (2424006013/WC/10494501) GP 29/03/2023 134086.21 124221.28 126630 42433
298  RAYAGADA PUTARA Renovation of Tank at Badaputar of Putar GP  (2424006014/WC/10418996) GP 30/04/2022 365476.09 116366.72 168498 6084
299  RAYAGADA PUTARA Construction of Field Chennel at Badaputar   (2424006014/WC/10420543) GP 28/03/2023 164640.6 290802.7 161064 2130
300  RAYAGADA PUTARA Construction of Cannel at Buldaguma  (2424006014/WC/10420544) GP 25/04/2022 165554.71 294442.85 164151 16928
301  RAYAGADA PUTARA Construction of Cannel at Bhalusahi   (2424006014/WC/10421181) GP 01/12/2022 164640.6 286003.18 141324 18964
302  RAYAGADA PUTARA Construction of Field channel at Burusing   (2424006014/WC/10424807) GP 06/09/2022 127022.35 323824.43 106855 111344.82
303  RAYAGADA PUTARA Construction of Loose Bulder Check dam at Buldaguma   (2424006014/WC/10424822) GP 25/04/2022 112375.87 187321.63 103500 89243
304  RAYAGADA PUTARA Imprevment of village tank at Karanjansahi puttara GP  (2424006014/WC/10465478) GP 24/01/2023 478062.65 9780.94 165956 15105
305  RAYAGADA PUTARA Construction of Contour Trenches at Badaputar of Putar GP  (2424006014/WC/10473292) GP 28/10/2022 476696.75 9767.28 407640 21528
306  RAYAGADA PUTARA Construction of Contour Trenches aT Bhalusahi of Putar GP  (2424006014/WC/10473294) GP 28/10/2022 476696.75 9767.28 464400 25704
307  RAYAGADA PUTARA Construction of Contour Trenches at Burusing of Putar GP  (2424006014/WC/10473296) GP 02/02/2023 476696.75 9767.28 260704 17852
308  RAYAGADA PUTARA Construction of Contour Trenches aT Karanjasahi of Putar GP  (2424006014/WC/10474056) GP 29/03/2023 476696.75 9767.28 357455 21848
309  RAYAGADA PUTARA Construction of Contour Trenches aT Rajana sahi of Putar GP  (2424006014/WC/10474058) GP 29/03/2023 476696.75 9767.28 205612 5000
310  RAYAGADA PUTARA Construction of Contour Trenches aT Sanaputar of Putar GP  (2424006014/WC/10474062) GP 02/02/2023 476696.75 9767.28 154340 11424
311  RAYAGADA PUTARA Construction of Loose Boulder Check Dam at Buludagumma  (2424006014/WC/10492500) GP 10/11/2022 134086.21 124221.28 133085 35945.3993
312  RAYAGADA PUTARA Construction of Loose Boulder Check Dam at Redibu nala  (2424006014/WC/10492524) GP 05/11/2022 134086.21 124221.28 90945 128433
313  RAYAGADA PUTARA Construction of Loose Boulder Check Dam at Badaputara  (2424006014/WC/10492989) GP 05/11/2022 134086.21 124221.28 109435 54397.5036
314  RAYAGADA PUTARA Construction of Loose Boulder Check Dam at Jenapada  (2424006014/WC/10492995) GP 05/11/2022 134086.21 124221.28 132717 50274
315  RAYAGADA PUTARA Construction of Loose Boulder Check Dam at Rajan sahi  (2424006014/WC/10492997) GP 10/11/2022 134086.21 124221.28 130935 56841.4976
316  RAYAGADA RAYAGADA CONSTRUCTIN OF LBCD AT DEKUSAHI NALA  (2424006015/WC/10482479) GP 06/09/2022 193867.41 185441.82 106455 64607.6795
317  RAYAGADA S.KARADASINGI Construction of LBCD at Dimbari Nala at Karanashi of S.Karadasing GP  (2424006016/WC/10420548) GP 09/11/2022 148432.43 131831.77 215280 0
318  RAYAGADA S.KARADASINGI Construction of Loose Bulder Check Dam at Karanasahi Nallo of S.Karadasing GP  (2424006016/WC/10439480) GP 26/07/2022 148432.43 123490.52 180600 131601
319  RAYAGADA S.KARADASINGI Construction of Loose Boulder Check Dam at Andhariguma Nalla of S.Karadasing GP  (2424006016/WC/10455841) GP 19/08/2022 148432.43 127030.85 98040 135142
320  RAYAGADA S.KARADASINGI Construction of Contour Trench at Lanjipadar of S.Karadasing GP  (2424006016/WC/10475173) GP 02/11/2022 478062.65 18132.94 357330 6084
321  RAYAGADA S.KARADASINGI Construction of Loose Boulder Check Dam at Lanjipadar of S.Karadasing GP  (2424006016/WC/10475176) GP 26/07/2022 153405.78 124745.91 170280 124745
322  RAYAGADA S.KARADASINGI Construction of Stop Dam at Lanjipadar of S.Karadasing Gp  (2424006016/WC/10475179) GP 02/11/2022 202172.13 145973.38 247680 154085
323  RAYAGADA S.KARADASINGI Construction of Continuous Contour Trench for Community at Abapur of S.Karadasing GP  (2424006016/WC/10481756) GP 09/11/2022 476696.75 23303.24 158240 23302
324  RAYAGADA S.KARADASINGI Construction of Continuous Contour Trench for Community at Bonda of S.Karadasing GP  (2424006016/WC/10481766) GP 26/07/2022 476696.75 23303.24 300570 8112
325  RAYAGADA S.KARADASINGI Construction of Continuous Contour Trench for Community at Sanakarda of S.Karadasing GP  (2424006016/WC/10481770) GP 02/11/2022 476696.75 23303.24 199305 37498
326  RAYAGADA S.KARADASINGI Construction of Continuous Contour Trench for Community at S.Karadasing of S.Karadasing GP  (2424006016/WC/10481772) GP 08/02/2023 476696.75 23303.24 191142 22000
327  RAYAGADA S.KARADASINGI Construction of Continuous Contour Trench for Community at Lanjipadar of S.Karadasing GP  (2424006016/WC/10481775) GP 26/07/2022 476696.75 23303.24 316050 0
328  RAYAGADA S.KARADASINGI Construction of Loose Boulder Check Dam at Bonda  (2424006016/WC/10484448) GP 02/11/2022 119061.13 209370.07 129860 211560
329  RAYAGADA S.KARADASINGI Construction of continuous contour trench with bund of Gamtili at Lanjipadar  (2424006016/WC/10559544) GP 08/02/2023 959048.55 34588.33 640736.4 29500
330  RAYAGADA S.KARADASINGI Construction of continuous contour trench with bund at A.karana Sahi  (2424006016/WC/10559549) GP 08/02/2023 959048.55 34588.33 590431.2 29500
331  RAYAGADA TALAMUNDA LBCD at Regidising of Talamunda GP  (2424006018/WC/10438519) GP 29/03/2023 109856.59 187493.27 80840 169164.6961
332  RAYAGADA TALAMUNDA LBCD at Talamunda of Talamunda GP  (2424006018/WC/10438520) GP 29/03/2023 109856.59 187493.27 78690 179386.5589
333  RAYAGADA TALAMUNDA Lose Bulder Check dam at Abasing (Bhuyasahi)  (2424006018/WC/10482589) GP 29/03/2023 132176.72 134690.82 87290 130887.5682
334  RAYAGADA TALAMUNDA Construction of LBCD at Ukarsing  (2424006018/WC/10482591) GP 11/11/2022 132176.72 134690.82 93955 78874.584
335  RAYAGADA KUMULSING Excavation earthen Drain from Karanja nalla to Sargal of Kumulasingi GP  (2424006021/WC/10421405) GP 27/05/2022 465206.24 21651.08 193959 4056
336  RAYAGADA KUMULSING River Supporting wall at Kumulasing Batia Nala of Kumulagingi GP  (2424006021/WC/10424142) GP 29/04/2022 191658.11 155446.7 143865 99788.68
337  RAYAGADA KUMULSING Construction of Supporting Wall at batia nala to ujala Bila  (2424006021/WC/10440552) GP 27/05/2022 191658.11 146825.24 135585 40414
338  RAYAGADA KUMULSING Construction of Supporting wall at karanjanala  (2424006021/WC/10440554) GP 29/04/2022 191658.11 146825.24 144072 133274.6026
339  RAYAGADA KUMULSING Construction of Loose Boulder Check Dam at Abasing  (2424006021/WC/10487399) GP 02/11/2022 193867.41 165441.82 153295 46155.7424
340  R.UDAYAGIRI ABARSING RENOVATION OF NEW TANK AT JAMONALA  (2424007001/WC/10406280) GP 19/08/2022 370492.19 115646.92 370944 115600
341  R.UDAYAGIRI ABARSING BEAUTIFICATION OF TANK AT ABARSING   (2424007001/WC/10421771) GP 04/04/2022 376263.92 507468.31 375390 607282
342  R.UDAYAGIRI ABARSING CONSTRUCTION OF LOOSE BOLDER CHECK DAM AT ABARSING  (2424007001/WC/10438065) GP 04/04/2022 119280.66 43558.4 113301 43558
343  R.UDAYAGIRI ABARSING CONSTRUCTION OF LOOSE BOLDER CHECK DAM AT ANAGHA  (2424007001/WC/10438066) GP 04/04/2022 119280.66 43558.4 123360 43558
344  R.UDAYAGIRI ABARSING CONSTRUCTION OF LOOSE BOLDER CHECK DAM AT DAMBADHIA  (2424007001/WC/10438067) GP 04/04/2022 119280.66 43558.4 139104 43558
345  R.UDAYAGIRI ABARSING CONSTRUCTION OF LOOSE BOLDER CHECK DAM AT KHARIPADA  (2424007001/WC/10438069) GP 04/04/2022 119280.66 38558 123828 38557
346  R.UDAYAGIRI ABARSING RENOVATION OF TANK AT KHAJURI BANDHA  (2424007001/WC/10453210) GP 04/04/2022 394820.17 99874.56 371781 67361
347  R.UDAYAGIRI ABARSING CONSTRUCTION OF BOULDER CHECKDAM AT JAMANALO  (2424007001/WC/10453229) GP 04/04/2022 119700.95 43006.44 98040 41006
348  R.UDAYAGIRI ANAGHA RENOVATION OF TANK AT BARABA  (2424007002/WC/10466639) GP 02/12/2022 337389.23 151912.89 229056 0
349  R.UDAYAGIRI CHELLAGADA RENOVATION OF TANK AT DENGAMBO  (2424007003/WC/10409009) GP 25/07/2022 305028.5 170705.39 163944 47241
350  R.UDAYAGIRI CHELLAGADA CONST OF CHECK DAM AT SANKHA NALA  (2424007003/WC/10409078) GP 18/08/2022 179377.07 456117.3 160824 365227.5
351  R.UDAYAGIRI CHELLAGADA CONST OF TANK AT SANTARASAHI  (2424007003/WC/10409176) GP 12/05/2022 305028.5 170705.39 143244 57117
352  R.UDAYAGIRI CHELLAGADA CONSTRUCTION OF LOOSE BOULDER CHECK DAM AT PURUNADIHA TO AMBAGACHA  (2424007003/WC/10441491) GP 18/08/2022 110770.56 189746.13 125496 196087
353  R.UDAYAGIRI CHELLAGADA RENOVATION OF TANK AT BASUDEVPUR  (2424007003/WC/10453950) GP 18/08/2022 304541 172196.77 294030 182840
354  R.UDAYAGIRI CHELLAGADA CONSTRUCTION OF CHECK DAM AT RUPASINGH NALA  (2424007003/WC/10474205) GP 04/11/2022 180398.68 465339.82 109220 271012
355  R.UDAYAGIRI CHELLAGADA RENOVATION OF HIGH SCHOOL TANK  (2424007003/WC/1378210) GP 18/08/2022 323988 250000 131559 64791
356  R.UDAYAGIRI CHELLAGADA CONST.OF CHECK DAM AT TALA NALLA OF CHELLAGADA HINDU STREET  (2424007003/WC/1378248) GP 06/04/2022 500 500 528 0
357  R.UDAYAGIRI CHELLIGADA IMP OF TANK AT HATAPADA OF CHELIGADA CONV  (2424007004/WC/10406509) GP 19/05/2022 216668.48 243043.1 218385 251398
358  R.UDAYAGIRI CHELLIGADA CONST OF COMMUNITY TANK AT RAJPUR CONV  (2424007004/WC/10406510) GP 19/05/2022 216668.48 243043.1 273240 206458
359  R.UDAYAGIRI CHELLIGADA RAN OF COMMUNITY TANK AT M.SAILANGA  (2424007004/WC/10406514) GP 19/05/2022 345359.73 130984.15 267030 69796
360  R.UDAYAGIRI CHELLIGADA CONSTRUCTION OF COMMUNITY TANK AT TALADA MASANI IN FRONT OF ELECTRIC OFFICE  (2424007004/WC/10422747) GP 19/05/2022 322796.69 160389.39 352350 62640
361  R.UDAYAGIRI CHELLIGADA CONSTRUCTION OF COMMUNITY TANK AT TALADA NAYAK SAHI  (2424007004/WC/10422821) GP 19/05/2022 322796.69 158352.26 348588 0
362  R.UDAYAGIRI CHELLIGADA RENOVATION OF TANK AT MUNISING  (2424007004/WC/10422823) GP 19/05/2022 322796.69 161559.7 240816 223180
363  R.UDAYAGIRI CHELLIGADA CONSTRUCTION OF CHECK DAM AT TALADA  (2424007004/WC/10426658) GP 19/05/2022 185995.74 462748.72 217350 395010
364  R.UDAYAGIRI CHELLIGADA CONSTRUCTION OF LOOSE BOLDER CHECK DAM AT BALADIA NALA OF RAJAPUR  (2424007004/WC/10438072) GP 03/11/2022 56108.96 124811.93 62307 192664
365  R.UDAYAGIRI CHELLIGADA CONSTRUCTION OF LOOSE BOLDER CHECK DAM AT RAJA AMBA JHOLA OF RAJAPUR  (2424007004/WC/10438073) GP 01/12/2022 56108.96 124812.23 86340 157410
366  R.UDAYAGIRI CHELLIGADA CONSTRUCTION OF CHECK DAM AT CHELLIGADA  (2424007004/WC/10449366) GP 19/05/2022 215302.58 433037.14 248367 430096
367  R.UDAYAGIRI CHELLIGADA CONSTRUCTION OF STOP DAM AT DHOBA TUTHA NALA AT TALADA  (2424007004/WC/10497467) GP 07/11/2022 211582.38 57977.22 125060 84720
368  R.UDAYAGIRI CHELLIGADA CONSTRUCTION OF BOULDER CHECK DAM AT BALADIYA NALA AT RAJPUR  (2424007004/WC/10507352) GP 03/11/2022 229034.17 39024.74 228193 0
369  R.UDAYAGIRI MAHENDRAGADA CONSTRUCTION OF LOOSE BOULDER CHECK DAM AT ARAKHAPADA   (2424007005/WC/10438040) GP 19/05/2022 132351.19 35513.81 138906 37632
370  R.UDAYAGIRI MAHENDRAGADA CONSTRUCTION OF LOOSE BOULDER CHECK DAM AT JHADARANDIVA  (2424007005/WC/10438041) GP 01/11/2022 131440.25 27213.74 144480 47856
371  R.UDAYAGIRI MAHENDRAGADA CONSTRUCTION OF LOOSE BOULDER CHECKDAM AT KANDHADHIA  (2424007005/WC/10438042) GP 01/11/2022 132351.19 35513.81 132225 59276
372  R.UDAYAGIRI MAHENDRAGADA CONSTRUCTION OF LOOSE BOULDERCHECK DAM AT NUAGAON  (2424007005/WC/10438044) GP 01/11/2022 132351.19 35513.81 133563 70285
373  R.UDAYAGIRI MAHENDRAGADA CONSTRUCTION OF LOOSE BOULDER CHECK DAM AT PITAPANASA  (2424007005/WC/10438045) GP 01/11/2022 132840.71 35123.44 137600 59349
374  R.UDAYAGIRI MAHENDRAGADA CONSTRUCTION OF LOOSE BOULDER CHECK DAM AT RANALAI  (2424007005/WC/10438046) GP 26/08/2022 132840.71 35123.44 137448 46332
375  R.UDAYAGIRI MAHENDRAGADA CONSTRUCTION OF LOOSE BOULDER CHECK DAM AT TUBURUBA  (2424007005/WC/10438047) GP 05/04/2022 132351.19 35513.81 138483 43008
376  R.UDAYAGIRI MAHENDRAGADA CONSTRUCTION OF STONE BOULDER CHECK DAM AT RANALAI  (2424007005/WC/10450894) GP 26/08/2022 136458.83 33123.22 139932 42120
377  R.UDAYAGIRI MAHENDRAGADA CONSTRUCTION OF LOOSE BOULDER CHECK DAM AT KHAMARISAHI  (2424007005/WC/10464699) GP 06/11/2022 131440.25 35637.74 125130 0
378  R.UDAYAGIRI MAHENDRAGADA CONSTRUCTION OF LOOSE BOULDER CHECK DAM AT JHARANA NALA DHEPASAHI AT ARAKHAPADA  (2424007005/WC/10495682) GP 01/11/2022 197160.38 48760.61 185868 31950
379  R.UDAYAGIRI MAHENDRAGADA CONSTRUCTION OF NEW TANK ATBALISAHI  (2424007005/WC/10555863) GP 06/11/2022 373071.22 113767.69 197136 0
380  R.UDAYAGIRI MANGARAJPUR CONSTRUCTION OF IRRIGATION CANAL AT JALANTI  (2424007006/WC/10453669) GP 05/09/2022 128700.8 334922.02 129000 157264
381  R.UDAYAGIRI R.UDAYAGIRI CONST OF CHECK DAM AT LAXMIPUR AT R UDAYAGIRI GP  (2424007007/WC/10416841) GP 03/11/2022 185995.74 462748.71 186405 479079.817
382  R.UDAYAGIRI R.UDAYAGIRI CONSTRUCTION OF CHECK DAM AT JALIALATI OF BILEIKUAN   (2424007007/WC/10421125) GP 19/05/2022 184905.89 463932.83 194994 402942
383  R.UDAYAGIRI R.UDAYAGIRI CONSTRUCTION OF CHECK DAM AT BABUTOTHA OF R.UDAYAGIRI VILLAGE  (2424007007/WC/10424720) GP 19/05/2022 185995.74 456954.46 183609 411563.58
384  R.UDAYAGIRI R.UDAYAGIRI CONSTRUCTION OF CHECK DAM AT THOBATUTHA OF R.UDAYAGIRI VILLAGE  (2424007007/WC/10424722) GP 19/05/2022 184905.89 458778.73 194994 479346.3
385  R.UDAYAGIRI R.UDAYAGIRI Construction of check dam at kalia tota  (2424007007/WC/10440364) GP 05/09/2022 183494.6 464166.01 202960 315038
386  R.UDAYAGIRI R.UDAYAGIRI IMPROVEMENT OF TANK AT GOLIA BANDHA AT R.UDAYAGIRI  (2424007007/WC/10445281) GP 22/12/2022 322796.69 154080.77 223869 230212
387  R.UDAYAGIRI RANDIVA CONST OF NEW TANK AT BURUSAHI  (2424007009/WC/10403355) GP 23/07/2022 327884.25 148100.64 179262 104516
388  R.UDAYAGIRI RANDIVA RENOVATION OF TANK AT NUABANDHA  (2424007009/WC/10403370) GP 24/08/2022 350065.91 132584.83 221880 132000
389  R.UDAYAGIRI SABARPALLI CONST. OF PUDUGASILA CHECK DAM AT PHATACHANCHADA  (2424007/WC/10342052) GP 05/04/2022 208000 492000 210984 433660
390  R.UDAYAGIRI SABARPALLI RENOVATION OF TANK AT HARIJANA SAHI OF SABARPALLI GP  (2424007010/WC/10403377) GP 05/09/2022 368798.02 116047 321861 97175
391  R.UDAYAGIRI SABARPALLI IMP OF CHECK DAM FROM SAMBARAKATA TO GUDUGUDA  (2424007010/WC/10412121) GP 18/08/2022 184277.18 437650.43 176991 503292
392  R.UDAYAGIRI SABARPALLI CONSRUCTION OF CHECK DAM AT DANGA PANI BILA OF JIRANGA VILLAGE  (2424007010/WC/10421948) GP 05/04/2022 178773.42 473840.47 174501 515599
393  R.UDAYAGIRI SABARPALLI CONSTRUCTION OF CHECK DAM AT ANJARSAHI  (2424007010/WC/10458927) GP 04/11/2022 218115.78 434306.31 217518 476356
394  R.UDAYAGIRI SABARPALLI CONSTRUCTION OF KALASI JHARANA CHECK DAM AT JIRANGA NALA  (2424007010/WC/10458929) GP 18/08/2022 124992.2 344218.2 104920 321857
395  R.UDAYAGIRI SABARPALLI CONST OF CHECK DAM AT BHALIAGANDA NALA  (2424007010/WC/1380339) GP 06/11/2022 175000 525000 172638 472779
396  R.UDAYAGIRI SIALILATI IMP OF MIP AT KOTHABILANAL  (2424007011/WC/10406892) GP 17/08/2022 160016.66 297241.93 167373 257445
397  R.UDAYAGIRI SIALILATI IMPROVEMENT OF TANK AT POIPANI  (2424007011/WC/10420999) GP 17/08/2022 423235.23 503429.18 233682 396018
398  R.UDAYAGIRI SIALILATI BEAUTIFICATIN OF TANK AT SIALILATI  (2424007011/WC/10421001) GP 02/11/2022 195469.54 215734.2 186372 0
399  R.UDAYAGIRI SUBALADA CONST OF CHECK DAM AT DHOLAKOTA OF SUBALADA GP  (2424007012/WC/10412372) GP 10/08/2022 170471.52 455668.05 184890 500211
400  R.UDAYAGIRI SUBALADA RENOVATION OF TANK AT DANDABILA AT DHOLAKOTA OF SUBALADA GP  (2424007012/WC/10412373) GP 23/12/2022 327201.85 151285.54 211728 171166
401  R.UDAYAGIRI TABARSINGI CONSTRUCTION OF CHECK DAM AT THUTI AMBA  (2424007013/WC/10421777) GP 19/08/2022 178957.64 471323.8 92880 332999
402  R.UDAYAGIRI PURUNAPANI CONST OF CHECK DAM AT BAMUNIDEI NALO OF ALARA  (2424007014/WC/10406910) GP 04/04/2022 184277.18 437650.43 186300 413917
403  R.UDAYAGIRI PURUNAPANI IMPROVEMENT OF TANK AT JAMAKONIA  (2424007014/WC/10420839) GP 10/03/2023 397271.69 529450.5 243792 605860
404  R.UDAYAGIRI PURUNAPANI IMPROVEMENT OF TANK AT SATYANAGAR  (2424007014/WC/10420884) GP 04/04/2022 418454.37 502864.4 232425 507954
405  R.UDAYAGIRI PURUNAPANI CONSTRUCTION OF CHECK DAM AT BELABANA AT NUAGOAN  (2424007014/WC/10471475) GP 19/05/2022 180750.02 469361.77 123625 468612
406  R.UDAYAGIRI PARISALA RENOVATION OF TANK AT SINDRANGO OF PARISALA GP  (2424007015/WC/10412562) GP 20/05/2022 327201.85 153441.63 346518 113252.994
407  R.UDAYAGIRI BASTRIGUDA CONST. OF FIELD CHANNEL AT AGADHU NALA  (2424007016/IC/944049) GP 06/11/2022 175000 525000 193545 102610
408  R.UDAYAGIRI BASTRIGUDA CONSTRUCTION OF CHECK DAM AT HENDIASAHI OF BASTRIGUDA   (2424007016/WC/10421269) GP 19/05/2022 184905.89 463932.83 133722 489493
409  R.UDAYAGIRI BASTRIGUDA CONSTRUCTION OF CHECK DAM AT TANDIGUDA BADASAHI  (2424007016/WC/10421270) GP 06/11/2022 186346.61 454673.15 196197 448484
410  R.UDAYAGIRI BASTRIGUDA CONSTRUCTION OF CHECK DAM AT BADA PATHARA OF PARIVETA VILLAGE  (2424007016/WC/10425558) GP 06/07/2022 184905.89 458162.8 121266 300000
411  R.UDAYAGIRI BASTRIGUDA CONSTRUCTION OF CHECK DAM AT ANUGURU ANNA OF KANCHIMULA  (2424007016/WC/10425560) GP 30/08/2022 184905.89 457778.73 189978 367265
412  R.UDAYAGIRI BASTRIGUDA CONSTRUCTION OF CHECK DAM AT NUASAHI OF TANDIGUDA VILLAGE  (2424007016/WC/10428791) GP 19/05/2022 183757.21 465669.55 195906 385731
413  R.UDAYAGIRI BASTRIGUDA CONSTRUCTION OF LOOSE BOULDER CHECK DAM AT TABARADA DIAN OF BADAPUR  (2424007016/WC/10429555) GP 06/11/2022 95228.34 206007.73 98118 264296
414  R.UDAYAGIRI BASTRIGUDA CONSTRUCTION OF LOOSE BOULDER CHECK DAM AT TURI AMBA OF BADAPUR  (2424007016/WC/10430066) GP 19/05/2022 95228.34 206007.83 101844 365170
415  R.UDAYAGIRI BASTRIGUDA Consrtuction of check dam at musaputa  (2424007016/WC/10440406) GP 18/08/2022 183494.6 434794.94 158634 444776
416  R.UDAYAGIRI BASTRIGUDA CONSTRUCTION OF CHECK DAM AT DANDASENA NALA OF BADAPUR  (2424007016/WC/10457209) GP 03/11/2022 184905.89 454573.19 192640 460480
417  R.UDAYAGIRI BASTRIGUDA RENOVATION OF TANK AT KUMBHI BANDHA AT BADAPUR  (2424007016/WC/10473541) GP 19/05/2022 296206.45 176591.81 264665 134720
418  R.UDAYAGIRI BASTRIGUDA CONSTRUCTION OF LOOSE BOULDER CHECK DAM AT GADHUA TUTHA OF BADAPUR  (2424007016/WC/10485412) GP 01/02/2023 344936.54 75210.72 343624 105508
419  R.UDAYAGIRI BASTRIGUDA CONSTRUCTION OF LOOSE BOULDER CHECK DAM AT BADASAHI TO MASANI AT TANDIGUDA  (2424007016/WC/10497900) GP 28/03/2023 229034.17 36541.74 227994 40748.2
420  R.UDAYAGIRI BASTRIGUDA CONSTRUCTION OF BOULDER CHECK DAM AT PANIPIA NALA AT BADAPUR  (2424007016/WC/10503059) GP 03/11/2022 229034.17 36541.74 228205 65940
421  R.UDAYAGIRI BASTRIGUDA CONSTRUCTION OF FIELD CHANNEL AT RANGAMATIA TO LADU SAHI  (2424007016/WC/10540533) GP 28/03/2023 134088.85 316742.57 133644 335870.9293
422  R.UDAYAGIRI BASTRIGUDA CONST.OF CHECK DAM AT JAMAPUJA  (2424007016/WC/3155326) GP 19/05/2022 175000 525000 201204 470975
423  R.UDAYAGIRI DABARAGUDA CONST OF CHECK DAM AT PAIKROI  (2424007017/WC/10409567) GP 04/11/2022 124425.01 327808.96 119970 327772
424  R.UDAYAGIRI DABARAGUDA CONSTRUCTION OF CHECK DAM AT MANILI NALA AT TUNGURU  (2424007017/WC/10474144) GP 04/11/2022 180398.68 465339.87 144695 149827