S.No |
District |
Block |
Gram Panchayat |
Work Name (Work Code) |
Executing Level |
Completion Date (DD/MM/YYYY) |
Est. labour component(in RS.) |
Est. material component(in RS.) |
Actual exp. on labour(in RS.) |
Actual exp. on material(in RS.) |
ODISHA |
1 | GANJAM |
ASKA |
ALLIPUR |
RENO OF PATHARA PATA TO ALLIPUR KHAMANALA ALLIPUR ALLIPUR GP (2412001/WC/10462986) |
BP |
29/08/2022 |
644896.11 |
234904.02 |
602567.58 |
0 |
2 | |
ASKA |
BADAKHOLI |
CONST.OF CHECKDEM AT KHARI AAGULA BHEJIPUTA (2412001/WC/10436451) |
BP |
30/01/2023 |
131668.55 |
347362.95 |
22491 |
0 |
3 | |
ASKA |
BALISIRA |
construction of storm drain from ghosada to chintamani at balisira (2412001/WC/10510272) |
BP |
24/11/2022 |
538671.37 |
150460.67 |
571600 |
0 |
4 | |
ASKA |
BALISIRA |
construction of storm drain from bada nua bandha to bara bharania at balisira (2412001/WC/10510275) |
BP |
24/11/2022 |
530949.82 |
155182.46 |
483330 |
0 |
5 | |
ASKA |
BANGARADA |
IMP OF CHATARA BANDHA NAHADA BANGARADA GP (2412001/WC/10429375) |
BP |
28/02/2023 |
501461.49 |
167577.89 |
4200 |
0 |
6 | |
ASKA |
BARAGAM |
BEAUTIFICATION OF IN COMPLETE NELIA BANDHA BARAGAM BARAGAM GP (2412001/WC/10492807) |
BP |
24/11/2022 |
202321.38 |
696967.67 |
123770 |
519953.7609 |
7 | |
ASKA |
BARAGAM |
BEAUTIFICATION OF IN COMPLETE RAMESWARA NEW TANK BARAGAM BARAGM GP (2412001/WC/10492808) |
BP |
14/11/2022 |
205699.77 |
691422.75 |
196181 |
686514.6306 |
8 | |
ASKA |
DEBABHUMI |
RENOVATION OF MACHHAKHALA NALA (2412001/WC/10398532) |
BP |
29/11/2022 |
373241.15 |
117401.35 |
375771 |
0 |
9 | |
ASKA |
DEBABHUMI |
Renov of keutanala at Debabhumi (2412001/WC/10435592) |
BP |
19/12/2022 |
612792.84 |
173057.02 |
585214 |
0 |
10 | |
ASKA |
DEBABHUMI |
Renovation of kajufactory nala at Debabhumi (2412001/WC/10435595) |
BP |
12/12/2022 |
389992.44 |
104163.51 |
362792 |
0 |
11 | |
ASKA |
DEBABHUMI |
Consruction of nala from kansarisahi baritala to Hajanala mamudhia (2412001/WC/10435600) |
BP |
26/05/2022 |
382995.53 |
108106.03 |
351496 |
0 |
12 | |
ASKA |
GAHANGU |
RENOV OF PILI NALA (2412001/WC/10426706) |
BP |
31/01/2023 |
701750.95 |
279055.73 |
562221 |
0 |
13 | |
ASKA |
GAHANGU |
RENOVATION OF DRAIN FROM KANTASI TO HALIA KHAMBA NALA GAHANGU (2412001/WC/10436513) |
BP |
31/01/2023 |
491963.17 |
196966.85 |
395220 |
0 |
14 | |
ASKA |
GUNTHAPADA |
CONST OF DIVERSION STORMS WATERDRAINS FROM TOTA TO BADANADI OF JAGADALPUR VILLAGE OF GUNTHAPADAGP (2412001/WC/10409758) |
BP |
06/09/2022 |
352736.81 |
136642.07 |
358462 |
15360 |
15 | |
ASKA |
GUNTHAPADA |
BEAUTIFICATION OF NEW TANK AT RAIPALLI (2412001/WC/10456113) |
BP |
19/04/2022 |
302449.38 |
577859.14 |
306060 |
415669.1383 |
16 | |
ASKA |
HARIDAPADAR |
BEAUTIFICATION OF PANCHAYAT BANDHA (2412001/WC/10448022) |
BP |
04/04/2022 |
273368.08 |
572336.36 |
255800 |
723539 |
17 | |
ASKA |
KENDUPADAR |
renov of nala from pili canal to bada nala at kendupadar village (2412001/WC/10434038) |
BP |
26/05/2022 |
580860.64 |
203896.26 |
598965 |
0 |
18 | |
ASKA |
KENDUPADAR |
renov of suara tota to mandakhai nala (2412001/WC/10434044) |
BP |
26/05/2022 |
384590.38 |
108154.78 |
354465 |
0 |
19 | |
ASKA |
KHANDADEULI |
CONST OF JAYAGURU NALA CHECKDAM AT KARNOLI KHANDADEULI GP (2412001/WC/10428450) |
BP |
02/11/2022 |
242139.17 |
519301.99 |
241740 |
526193 |
20 | |
ASKA |
KHANDADEULI |
CONST OF CHECKDAM AT SANDHI NALA BELAPADA KHANDADEULI GP (2412001/WC/10428453) |
BP |
27/02/2023 |
234025.81 |
435458.44 |
252861 |
0 |
21 | |
ASKA |
MANGALPUR |
CONSTRUCTION DIVERSION DRAIN FROM MANGALPUR TO ANICOT (2412001/WC/10409402) |
BP |
26/05/2022 |
366853.74 |
117472.61 |
368430 |
0 |
22 | |
ASKA |
MANGALPUR |
BEAUTIFICATION OF BEDHA BANDHA (2412001/WC/10439436) |
BP |
21/04/2022 |
328381.23 |
575087.01 |
333040 |
0 |
23 | |
ASKA |
MUNIGADI |
BEUTIFICATION OF VILLAGE TANK SINGIPUR MUNIGADI GPE (2412001/WC/10429378) |
BP |
31/01/2023 |
255553.33 |
649527.33 |
1212 |
0 |
24 | |
ASKA |
NALABANTA |
BEAUTIFICTION OF RADHAKRUSHNA TANK AT NALABANTA GP (2412001/WC/10489536) |
BP |
01/09/2022 |
278205.5 |
607211.78 |
292929 |
682723.0854 |
25 | |
BEGUNIAPADA |
BADA KHAIRAKHAMA |
PS CONST OF CHECKDAM AT MARICHA PADIA THUAMUALA (2412002/WC/10331200) |
BP |
25/01/2023 |
100000 |
400000 |
200 |
0 |
26 | |
BEGUNIAPADA |
BADA KHAIRAKHAMA |
reno of salia canal from k nuaplai to thuamula k nuapali (2412002/WC/10408356) |
BP |
25/05/2022 |
367382.25 |
23338.1 |
201060 |
19620 |
27 | |
BEGUNIAPADA |
BADA KHAIRAKHAMA |
RENO OF NALA FROM THAKURANIBILA TO PALASAPALI SARADHAPURA (2412002/WC/10428591) |
BP |
25/05/2022 |
443014.43 |
36967.76 |
400214 |
45780 |
28 | |
BEGUNIAPADA |
BADA KHAIRAKHAMA |
RENO OF SALIA CANAL FROM BISHOI BANDHA TO NUAPALI, GUNJABALA (2412002/WC/10452009) |
BP |
25/01/2023 |
451649.28 |
31437.44 |
188154 |
0 |
29 | |
BEGUNIAPADA |
BADA KHAIRAKHAMA |
20 21 PS CONST OF CHECKDAM ON BHALUKUAN NALA DUARASUNI (2412002/WC/10457771) |
BP |
29/12/2022 |
163474.78 |
500275.3 |
85077 |
191915 |
30 | |
BEGUNIAPADA |
BADA KHAIRAKHAMA |
20 21 PS RENO AND GUARD WALL AT MAGARA NALA SARADHAPURA (2412002/WC/10458837) |
BP |
25/05/2022 |
549620.61 |
141890.42 |
555687 |
29862 |
31 | |
BEGUNIAPADA |
BADA KHAIRAKHAMA |
Field bunding at Sardhapur (2412002/WC/10468317) |
BP |
07/09/2022 |
401994 |
76266 |
417960 |
0 |
32 | |
BEGUNIAPADA |
BEGUNIAPADA |
21-22 PS RENO OF CANAL FROM BALIA PATA TO AMBAGUDI PAHARA (2412002/WC/10504601) |
BP |
29/03/2023 |
634881.24 |
40040.88 |
664136 |
27308 |
33 | |
BEGUNIAPADA |
BURUJHARI |
20 21 PS DIGGING OF NALA AND GUARD WALL FROM BUDHI GHATI TO SALIA CANAL P NUANGAON (2412002/WC/10454141) |
BP |
21/11/2022 |
645239.78 |
231243.19 |
648571 |
0 |
34 | |
BEGUNIAPADA |
BURUJHARI |
20 21 PS RENO OF NALA FROM BADAPAHAR TO HATAPAHAR KANYARIBADI (2412002/WC/10464104) |
BP |
23/04/2022 |
355571.1 |
31039.9 |
361458 |
0 |
35 | |
BEGUNIAPADA |
BURUJHARI |
20 21 PS RENO OF NALA FROM NIMAKANIA GHAI TO KHARAKHARI NADI KANYARIBADI (2412002/WC/10464650) |
BP |
23/04/2022 |
626457.96 |
48613.28 |
662807 |
0 |
36 | |
BEGUNIAPADA |
BURUJHARI |
20 21 PS RENO OF NALA FROM JANI BILA TO PANA NADI KANYARIBADI (2412002/WC/10464651) |
BP |
21/11/2022 |
458511.02 |
29161.14 |
424760 |
0 |
37 | |
BEGUNIAPADA |
CHANDANPUR |
RENO OFGADIABANDHA ,MUNDULA (2412002/WC/10407150) |
BP |
22/04/2022 |
521026.04 |
67727.2 |
520492 |
26160 |
38 | |
BEGUNIAPADA |
CHANDANPUR |
RENO OF SUGARI BANDHA ,CHANDANPUR (2412002/WC/10407151) |
BP |
23/05/2022 |
720547.36 |
68722.84 |
700850 |
29862 |
39 | |
BEGUNIAPADA |
CHANDANPUR |
CONST OF NEW TANK AT KUMARSINGH BANAMALIA (2412002/WC/10456784) |
BP |
22/04/2022 |
476942.72 |
190637.8 |
467970 |
33180 |
40 | |
BEGUNIAPADA |
CHANDANPUR |
RENO OF KALIASANDHA TANK (2412002/WC/10456785) |
BP |
22/04/2022 |
422212.87 |
162695.8 |
342720 |
19908 |
41 | |
BEGUNIAPADA |
CHANDANPUR |
CONSTOFNEWTANK AT SANKHAGADA (2412002/WC/10486141) |
BP |
28/10/2022 |
484168.3 |
14790.52 |
482280 |
33600 |
42 | |
BEGUNIAPADA |
CHANDANPUR |
RENO OF RAIPADA BANDHA (2412002/WC/10503719) |
BP |
14/11/2022 |
484168.3 |
14831.52 |
427350 |
23520 |
43 | |
BEGUNIAPADA |
CHINGUDIKHOL |
2021 PS RENO OF MAHULA BANDHA (2412002/WC/10466209) |
BP |
25/05/2022 |
740179.49 |
43401.83 |
739740 |
0 |
44 | |
BEGUNIAPADA |
CHINGUDIKHOL |
2021 PS RENO OF AGULA GHAI USTALI (2412002/WC/10469807) |
BP |
25/05/2022 |
649525.59 |
38474.26 |
601536 |
0 |
45 | |
BEGUNIAPADA |
DIGAPADA |
2021 PS RENO OF CANAL FROM DANDA SAHI TO NUA BANDHA AT RENGITIPALLI (2412002/WC/10459205) |
BP |
19/01/2023 |
745748.11 |
36271.94 |
740178 |
53200 |
46 | |
BEGUNIAPADA |
DIGAPADA |
21-22 PS IMP OF MANIKA BANDHA (2412002/WC/10493420) |
BP |
05/11/2022 |
767345.46 |
27674.51 |
752580 |
35420 |
47 | |
BEGUNIAPADA |
DIGAPADA |
21-22 PS RENO OF BADA NALA (2412002/WC/10493421) |
BP |
15/04/2022 |
767345.46 |
27674.51 |
811809 |
37240 |
48 | |
BEGUNIAPADA |
DIGAPADA |
21-22 PS RENO OF NAULI VILLAGE TANK (2412002/WC/10493422) |
BP |
28/10/2022 |
862831.66 |
28629.48 |
880686 |
58520 |
49 | |
BEGUNIAPADA |
DIGAPADA |
21-22 PS RENO OF GUDI BANDHA (2412002/WC/10496419) |
BP |
05/11/2022 |
767345.46 |
27674.51 |
695810 |
15960 |
50 | |
BEGUNIAPADA |
K.BARIDA |
2020-21 PS Reno. of Khari Ghai Bandha, at-B.Nuapalli (2412002/WC/10436788) |
BP |
29/08/2022 |
750325.27 |
34504.47 |
756500 |
0 |
51 | |
BEGUNIAPADA |
KALIMEGHI |
RENO OF CANAL FROM LUHAKOTE TO KINARI CHAKA (2412002/WC/10477283) |
BP |
05/11/2022 |
645782.26 |
36977.09 |
402528 |
0 |
52 | |
BEGUNIAPADA |
KHANDIANAI |
2020-21 PS BEAUTIFICATION OF BLOCK COLONY TANK, AT-GENJARAPALLI (2412002/WC/10443520) |
BP |
10/11/2022 |
267411.67 |
507423.6 |
266994 |
507423 |
53 | |
BEGUNIAPADA |
KHANDIANAI |
2020-21 PS RENO. OF BAGHAMARI BANDHA, AT- TIRIDA (2412002/WC/10457798) |
BP |
10/11/2022 |
673918.05 |
100066.23 |
678514 |
33070 |
54 | |
BEGUNIAPADA |
KHANDIANAI |
2020-21 PS RENO. OF MAHA BANDHA, AT-DEULIAPADA (2412002/WC/10457800) |
BP |
25/04/2022 |
746298.72 |
35463.81 |
779550 |
5395 |
55 | |
BEGUNIAPADA |
KHANDIANAI |
2122 PS RENO OF PILAKHAI BANDHA AT TIRIDA (2412002/WC/10481335) |
BP |
15/04/2022 |
752863.87 |
32735.7 |
761066 |
38766 |
56 | |
BEGUNIAPADA |
KUMBHARAGAM |
1920 PS RENO OF AGULA GHAI AT N CHHACHINA (2412002/WC/10411571) |
BP |
18/10/2022 |
812900.32 |
87099.2 |
823430 |
42150 |
57 | |
BEGUNIAPADA |
KUMBHARAGAM |
2021 PS RENO OF DHOBANI BANDHA AT TALAGAON (2412002/WC/10422443) |
BP |
18/10/2022 |
867087.6 |
30670.89 |
868880 |
53652 |
58 | |
BEGUNIAPADA |
KUMBHARAGAM |
RENO OF BAISHNAB BANDHA TALAGAON (2412002/WC/10462943) |
BP |
18/10/2022 |
759961.86 |
30599.87 |
751700 |
30508 |
59 | |
BEGUNIAPADA |
KUMBHARAGAM |
20 21 PS RENO OF NALA FROM SUSANTA JENA BAGICHA TOJUNGLE KUMBHARGAON (2412002/WC/10465403) |
BP |
18/10/2022 |
734675.76 |
45500.32 |
734700 |
37872 |
60 | |
BEGUNIAPADA |
KUMBHARAGAM |
2021-2022 PS EXCAVATION OF NEW TANK AT JHADESWAR TEMPELE AT TALAGAON KUMBHARGAON GP (2412002/WC/10515304) |
BP |
05/11/2022 |
851158.12 |
29952.17 |
839344 |
0 |
61 | |
BEGUNIAPADA |
MARDAKOTE |
2021 PS RENO OF GADI BANDHA (2412002/WC/10423497) |
BP |
29/03/2023 |
656023.14 |
31560.94 |
657545 |
31000 |
62 | |
BEGUNIAPADA |
MARDAKOTE |
2021 PS RENO OF CANAL FROM MARDAKOTE TO RD ROAD (2412002/WC/10469945) |
BP |
18/09/2022 |
450720.52 |
32155.52 |
331720 |
0 |
63 | |
BEGUNIAPADA |
MARDAKOTE |
21 22 PS RENO OF NUAN BANDHA (2412002/WC/10488272) |
BP |
29/03/2023 |
661628.19 |
26614.65 |
384600 |
12168 |
64 | |
BEGUNIAPADA |
MARDAKOTE |
21-22 PS RENO OF CANAL FROM MI ROAD TO TELENGA JHOLA (2412002/WC/10504932) |
BP |
29/03/2023 |
643427.23 |
37080.19 |
656055 |
27984 |
65 | |
BEGUNIAPADA |
MARDAKOTE |
21-22 PS RENO OF CANAL FROM USTALI MATHA TO CHADIAPADA PAHARA (2412002/WC/10504947) |
BP |
03/11/2022 |
643427.23 |
37080.19 |
653085 |
0 |
66 | |
BEGUNIAPADA |
MARDAMEKHA |
2021 PS RENO OF NEW TANK AT KARUKARUA TANK (2412002/WC/10457920) |
BP |
25/04/2022 |
644419.13 |
37144.9 |
639270 |
3318 |
67 | |
BEGUNIAPADA |
MARDAMEKHA |
21-22 PS RENO OF KARUKARUA TANK JAYASINGPUR (2412002/WC/10488561) |
BP |
27/10/2022 |
554232.27 |
219974.66 |
541830 |
16650 |
68 | |
BEGUNIAPADA |
MARDAMEKHA |
2021-22 PS RENO. OF CANAL FROM JAYASINGHPUR TO DIGI, AT- JAYASINGHPUR (2412002/WC/10515124) |
BP |
27/10/2022 |
658532.75 |
28314.11 |
647170 |
19980 |
69 | |
BEGUNIAPADA |
MATHASARASINGI |
2021 PS RENO OF CANAL FROM PADIABHANGA TO BAGADAKHAMA (2412002/WC/10422588) |
BP |
16/11/2022 |
451649.28 |
31437.44 |
440685 |
0 |
70 | |
BEGUNIAPADA |
MATHASARASINGI |
2021 PS RENO OF CANAL FROM BALI BILA TO NUABANDHA (2412002/WC/10438171) |
BP |
05/09/2022 |
451649.28 |
31437.44 |
450893 |
31860 |
71 | |
BEGUNIAPADA |
MATHASARASINGI |
2021 PS RENO OF NUABANDHA MATHABERHAMPUR (2412002/WC/10475853) |
BP |
16/11/2022 |
560898.95 |
25609.75 |
509892 |
38520 |
72 | |
BEGUNIAPADA |
MATHASARASINGI |
2122 PS RENO OF NUABANDHA SALABANA (2412002/WC/10487515) |
BP |
28/10/2022 |
678830.61 |
17789.22 |
670732 |
63665 |
73 | |
BEGUNIAPADA |
PHASI |
2021 PS RENO OF GADIA BANDHA LATHULI (2412002/WC/10425641) |
BP |
03/11/2022 |
454601.83 |
33546.21 |
438927 |
46869 |
74 | |
BEGUNIAPADA |
PHASI |
2021 PS RENO OF CANAL FROM DIAMALA TO PURUBA PAHARA LATHULI (2412002/WC/10425643) |
BP |
20/04/2022 |
461796.19 |
29218.94 |
450691 |
28763 |
75 | |
BEGUNIAPADA |
PHASI |
2122 PS RENO OF JHARAANDHA PHASI (2412002/WC/10487523) |
BP |
01/06/2022 |
431812.34 |
47318.85 |
425311 |
0 |
76 | |
BEGUNIAPADA |
PHASI |
2122 PS DECILTING OF KARAESUNI NALA TO BALUNKESWAR NALA LATHULI (2412002/WC/10503386) |
BP |
01/08/2022 |
246898.26 |
35814.92 |
264677 |
0 |
77 | |
BEGUNIAPADA |
SANAUSTAPADA |
2021 PS RENO OF USTAPADA CANAL AT S USTAPADA (2412002/WC/10424969) |
BP |
25/05/2022 |
742633.33 |
38230.88 |
729738 |
38115 |
78 | |
BEGUNIAPADA |
SANAUSTAPADA |
RENO OF KHIDIKINAHAKANI TANK (2412002/WC/10469684) |
BP |
25/05/2022 |
846128.83 |
38238.89 |
819408 |
37654 |
79 | |
BEGUNIAPADA |
SANDHAMULA |
21 22 PS RENO OF NUAN BANDHA AT SALABANA (2412002/WC/10490795) |
BP |
01/04/2022 |
468662.59 |
21687.42 |
465900 |
28393 |
80 | |
BEGUNIAPADA |
SANKUDA |
1920 PS RENO OF BUDHA BANDHA (2412002/WC/10412437) |
BP |
29/12/2022 |
839299.74 |
41395.13 |
745198 |
0 |
81 | |
BEGUNIAPADA |
SANKUDA |
2021 PS BEAUTIFICATION OF NUA BANDHA NEAR DHABALESWAR TEMPLE (2412002/WC/10422165) |
BP |
25/01/2023 |
238462.72 |
701325.31 |
56795 |
0 |
82 | |
BEGUNIAPADA |
SANKUDA |
20 21 PS STRAGGED TRENCH AT TITIRIDI (2412002/WC/10434313) |
BP |
01/06/2022 |
405480.11 |
33053.94 |
146880 |
0 |
83 | |
BEGUNIAPADA |
SANKUDA |
20 21 PS RENO OF NUA BANDHA (2412002/WC/10460784) |
BP |
01/06/2022 |
560074.2 |
212331.46 |
615054 |
19620 |
84 | |
BEGUNIAPADA |
SANKUDA |
Field bunding at Sankuda (2412002/WC/10468310) |
BP |
07/09/2022 |
1179693 |
223929 |
1110350 |
208000 |
85 | |
BEGUNIAPADA |
SOURA CHACHINA |
20 21 PS STRAGGED TRENCH AT UJALAPALI (2412002/WC/10427801) |
BP |
27/01/2023 |
595882.62 |
26959.98 |
481125 |
6540 |
86 | |
BEGUNIAPADA |
SOURA CHACHINA |
20 21 PS CONST OF CHECK DAM AT MASANI NAL S CHHAHINA (2412002/WC/10454686) |
BP |
25/04/2022 |
145523.25 |
422633.87 |
141909 |
223787 |
87 | |
BEGUNIAPADA |
SUMANDAL |
2021 PS RENO OF BENA GADIA (2412002/WC/10422548) |
BP |
01/11/2022 |
753021.88 |
35932.14 |
749210 |
19620 |
88 | |
BEGUNIAPADA |
SUMANDAL |
20 21 PS RENO OFMAKARAMA NALA AT BHALIAJHARA (2412002/WC/10460783) |
BP |
29/12/2022 |
543343.05 |
32449.66 |
537175 |
19620 |
89 | |
BEGUNIAPADA |
SUMANDAL |
RENO OF NALA AT SAHAKHOL HILL SIDE (2412002/WC/10473766) |
BP |
01/08/2022 |
756612.09 |
31295.02 |
756441 |
12624 |
90 | |
BEGUNIAPADA |
SUMANDAL |
RENO OF NALA AT SALIACANAL SIDE (2412002/WC/10473768) |
BP |
22/04/2022 |
476722.08 |
21208.02 |
447642 |
0 |
91 | |
BEGUNIAPADA |
GHODAPADA |
20-21RENO CANCAL FROM BINCHA TANK TO JHARANAI CANCAL (2412002/WC/10419001) |
BP |
23/04/2022 |
559752.96 |
30441.92 |
533160 |
13080 |
92 | |
BEGUNIAPADA |
GHODAPADA |
CONST STAGGERED TRENCH AT GHODAPADA UNDER GHODAPADA GP (2412002/WC/10427678) |
BP |
23/04/2022 |
848669.88 |
38484.9 |
846560 |
29430 |
93 | |
BEGUNIAPADA |
GHODAPADA |
20-21 PS RENO OF GORODA NALA AT GHODAPADA GHODAPADA GP (2412002/WC/10453654) |
BP |
23/04/2022 |
362280.98 |
25717.95 |
362280 |
0 |
94 | |
BEGUNIAPADA |
GHODAPADA |
20-21 PS RENO OF CHANDIGHAI AT GHODAPADA GHODAPADA GP (2412002/WC/10466878) |
BP |
25/05/2022 |
278001.72 |
108877.43 |
278036 |
0 |
95 | |
BEGUNIAPADA |
GHODAPADA |
20-21PS RENO OF CANCAL FROM GHAINALA TO JHARANAI AT GHODAPADA GHODAPADA GP (2412002/WC/10469989) |
BP |
27/10/2022 |
696510.99 |
179088.11 |
689580 |
19620 |
96 | |
BEGUNIAPADA |
GHODAPADA |
20-21 PS BALI SAHI TANK AT TABHABANIA GHODAPADA GP (2412002/WC/10469992) |
BP |
23/04/2022 |
362680.59 |
21625.96 |
321767 |
0 |
97 | |
BELLAGUNTHA |
AMBAPUA |
20-21-AMBAPUA-TIKARAPADA-RENO OF NUA KANDHURI TAILA GHAI (2412003/WC/10462508) |
BP |
19/08/2022 |
402432.42 |
84570.6 |
390680 |
0 |
98 | |
BELLAGUNTHA |
AMBAPUA |
20-21-AMBAPUA-BORIPADARA-IMP OF BORIPADAR VILLAGE CANAL (2412003/WC/10462510) |
BP |
19/08/2022 |
492363.67 |
179830.47 |
471734 |
0 |
99 | |
BELLAGUNTHA |
AMBAPUA |
20-21-AMBAPUA-TIKARAPADA-IMP OF BHADUA NALA (2412003/WC/10462768) |
BP |
19/08/2022 |
564075.47 |
209363.87 |
563283 |
0 |
100 | |
BELLAGUNTHA |
BADABORASINGI |
20-21-B B SINGI-GUNTHAPALABA-DIGGING OF CONTOUR TRENCH NEAR GRAMYA DEVI HILL (2412003/WC/10455245) |
BP |
26/04/2022 |
64799.7 |
5647.86 |
67563 |
0 |
101 | |
BELLAGUNTHA |
BADABORASINGI |
20-21-B B SINGI-BANKALEDI-DIGGING OF CONTOUR TRENCH NEAR GOBARA BANDHA (2412003/WC/10455248) |
BP |
26/04/2022 |
64799.7 |
5647.86 |
63688 |
0 |
102 | |
BELLAGUNTHA |
BADABORASINGI |
20-21-B B SINGI-SANABORSINGI-IMP AND STRENGTHENING OF KUMUTI BANDHA AT S B SINGI (2412003/WC/10460724) |
BP |
26/04/2022 |
490535.22 |
283247.29 |
512788 |
267410 |
103 | |
BELLAGUNTHA |
BADABORASINGI |
20-21-B B SINGI-SANDHIPALLI-IMP AND STRENGTHENING OF VILLAGE TANK AT SANDHIPALLI (2412003/WC/10460725) |
BP |
26/04/2022 |
490535.22 |
285247.29 |
537734 |
238240 |
104 | |
BELLAGUNTHA |
BADABORASINGI |
20-21-BADABORSINGI-RENO OF KHARI NALA AT B B SINGI (2412003/WC/10465355) |
BP |
26/04/2022 |
482097.43 |
13169.03 |
484875 |
0 |
105 | |
BELLAGUNTHA |
BADABORASINGI |
20-21-BADABORSINGI-DUBULUNDA-RENO OF BHUYAN NALA AT DUBULUNDA (2412003/WC/10465356) |
BP |
27/07/2022 |
480712.1 |
17287.91 |
465898 |
0 |
106 | |
BELLAGUNTHA |
BADAPADA |
20-21-BADAPADA-SIRIKOI-RENO OF HADI SAHI NALA TO GIRDHINI PADIA KHAMA OF SIRIKOI (2412003/WC/10465526) |
BP |
06/07/2022 |
498552.94 |
157672.3 |
506849 |
0 |
107 | |
BELLAGUNTHA |
BADAPADA |
20-21-BADAPADA-LUDULUDI-RENO OF DAHA CANAL TO LUDULUDI PILI TOTA KHAMA (2412003/WC/10465528) |
BP |
06/07/2022 |
504986.51 |
152608.37 |
509085 |
0 |
108 | |
BELLAGUNTHA |
BADAPADA |
20-21-BADAPADA-LUDULUDI-RENO OF PWD ROAD TO RANKI AGULA KHAMA NALA (2412003/WC/10465529) |
BP |
26/06/2022 |
432326.7 |
123947.28 |
458223 |
0 |
109 | |
BELLAGUNTHA |
BADAPADA |
21-22-BADAPADA-RENO OF TOKULI BANDHA AT BADAPADA (2412003/WC/10476409) |
BP |
15/12/2022 |
404739.29 |
68041.42 |
400503 |
0 |
110 | |
BELLAGUNTHA |
BANKA |
BLG 20-21 PS RENO OF KIRAPALLI UASTA NALA (2412003/WC/10450785) |
BP |
08/04/2022 |
634141.38 |
119296.49 |
624046 |
0 |
111 | |
BELLAGUNTHA |
BANKA |
BLG 2020 21 PS RENO OF CHANCHARA NALA AT JATRASUNI OF BANKA GP (2412003/WC/10451666) |
BP |
08/04/2022 |
487048.35 |
90406.23 |
488613 |
0 |
112 | |
BELLAGUNTHA |
BANKA |
BLG 2020 21 PS RENO OF PATA BANDHA AT SURAMANI OF BANKA GP (2412003/WC/10451672) |
BP |
25/07/2022 |
438687.94 |
37870.34 |
335600 |
0 |
113 | |
BELLAGUNTHA |
BANKA |
BLG 2020 21 PS RENO OF INDRAGADA GHAI AT INDRAGADA OF BANKA GP (2412003/WC/10451675) |
BP |
08/04/2022 |
373897.49 |
25083.49 |
373600 |
0 |
114 | |
BELLAGUNTHA |
BANKA |
BLG 2020 21 PS RENO OF KHALA TALA NALA AT INDRAGADA OF BANKA GP (2412003/WC/10451677) |
BP |
08/04/2022 |
454739.29 |
105510.64 |
486430 |
0 |
115 | |
BELLAGUNTHA |
BANKA |
20-21-BANKA-KIRAPALLI-DIGGING OF CONTOUR TRENCH NEAR TALA KUHARSUNI PAHADA (2412003/WC/10455250) |
BP |
08/04/2022 |
64799.7 |
5647.86 |
66200 |
0 |
116 | |
BELLAGUNTHA |
BANKA |
20-21-BANKA-JATRASUNI-DIGGING OF CONTOUR TRENCH NEAR RIVER HILL (2412003/WC/10455252) |
BP |
08/04/2022 |
64799.7 |
5647.86 |
64310 |
0 |
117 | |
BELLAGUNTHA |
BANKA |
20-21-BANKA-RENO OF BETHA BANDHA AT BANKA (2412003/WC/10465688) |
BP |
08/04/2022 |
472291.56 |
17995.82 |
471735 |
0 |
118 | |
BELLAGUNTHA |
BANKA |
20-21-BANKA-B L S PUR-RENO OF ANDHARI NALA (2412003/WC/10465690) |
BP |
08/04/2022 |
504153 |
71029.24 |
504000 |
0 |
119 | |
BELLAGUNTHA |
BANKA |
20-21-BANKA-RENO OF BEDHA NALA TO PAIKA DAM NALA (2412003/WC/10465691) |
BP |
08/04/2022 |
504153 |
71029.24 |
503592 |
0 |
120 | |
BELLAGUNTHA |
BANKA |
2021-22-BANKA-JIROLI-RENO OF PANAGADA BANDHA AT JIROLI (2412003/WC/10475491) |
BP |
15/12/2022 |
439750.01 |
25049.56 |
180130 |
0 |
121 | |
BELLAGUNTHA |
BANKA |
2021-22-BANKA-JATRASUNI-RENO OF MANI PADIA BANDHA AT JATRASUNI (2412003/WC/10475493) |
BP |
08/04/2022 |
439750.01 |
24690.26 |
439200 |
0 |
122 | |
BELLAGUNTHA |
BENIPALLI |
20-21-BENIPALLI-ORIGADA-RENO OF GUNDIRIPADIA NALA AT ORIGADA (2412003/WC/10466669) |
BP |
27/07/2022 |
424297.41 |
60702.6 |
283782 |
0 |
123 | |
BELLAGUNTHA |
BENIPALLI |
20-21-BENIPALLI-BARAPALLI-RENO OF KOINEKHA KHAMA AT BARAPALLI (2412003/WC/10466671) |
BP |
27/07/2022 |
424297.41 |
60702.6 |
402338 |
0 |
124 | |
BELLAGUNTHA |
BENIPALLI |
21-22-BENIPALLI-RENO OKHAMA FROM SIBA MANDIRA TO THAKURANI MANDIRAF AT BENIPALLI (2412003/WC/10479200) |
BP |
15/12/2022 |
432211.05 |
52788.94 |
327604 |
0 |
125 | |
BELLAGUNTHA |
DHUMUCHAI |
BLG 202 21 PS RENO OF KANDHA BANDHA AT GUDIPALLI OF DHUMUCHHAI GP (2412003/WC/10443446) |
BP |
30/10/2022 |
401355.12 |
86644.88 |
396684 |
0 |
126 | |
BELLAGUNTHA |
DHUMUCHAI |
20-21-DHUMUCHHAI-KURULAI-RENO OF NUA BANDHA TANK AT KURULAI (2412003/WC/10473602) |
BP |
15/12/2022 |
507602.93 |
72397.07 |
227409 |
0 |
127 | |
BELLAGUNTHA |
G.NUAGAM |
BLG/2018-19/(PS) IMP & STRENGTHEINING OF VILLAGE TANK (2412003/WC/10342971) |
BP |
16/08/2022 |
410000 |
390000 |
410187 |
0 |
128 | |
BELLAGUNTHA |
G.NUAGAM |
2020-21 PS- G.Nuagam- RENO OF DAMUNI KHAMA AT G.NUAGAM (2412003/WC/10465538) |
BP |
16/08/2022 |
617811.71 |
153283.07 |
490855 |
0 |
129 | |
BELLAGUNTHA |
G.NUAGAM |
2020-21 PS- G.Nuagam- RENO OF NEW CENAL FROM HARIPUR RD ROAD TO K.BHEREDA (2412003/WC/10465539) |
BP |
16/08/2022 |
676464.52 |
170199.18 |
420123 |
0 |
130 | |
BELLAGUNTHA |
GANGAPUR |
2021-22 PS- Gangapur- RENO OF CHAULI HATA NALA AT BORI (2412003/WC/10513540) |
BP |
15/12/2022 |
267074.89 |
29925.11 |
292501 |
0 |
131 | |
BELLAGUNTHA |
GANGAPUR |
2021-22 PS- Gangapur- RENO OF SUNA NALA AT BORI (2412003/WC/10513544) |
BP |
02/11/2022 |
267074.89 |
29925.11 |
264062.44 |
0 |
132 | |
BELLAGUNTHA |
GOBARA |
2020-21 PS- GOBARA- RENO OF MATHA KHAMA OF BIRIPUR (2412003/WC/10464805) |
BP |
02/09/2022 |
560251.09 |
179184.3 |
548469 |
0 |
133 | |
BELLAGUNTHA |
GOBARA |
2020-21 PS- GOBARA- RENO OF MAIN CANEL TO HARIJAN SAHI NALA OF DENGAPADAR (2412003/WC/10464806) |
BP |
02/09/2022 |
560251.09 |
179184.3 |
494186 |
0 |
134 | |
BELLAGUNTHA |
GOBARA |
2020-21 PS- GOBARA- EXV OF KHAMA FROM BADA NALA TO HINJALA NALA AT DENGAPADAR (2412003/WC/10464809) |
BP |
02/09/2022 |
490171.5 |
156958.52 |
503422 |
0 |
135 | |
BELLAGUNTHA |
GOBARA |
2020-21 PS- GOBARA- RENO OF SANA KHAMA NALA AT GOBARA (2412003/WC/10464814) |
BP |
27/04/2022 |
490171.5 |
156958.52 |
500640 |
0 |
136 | |
BELLAGUNTHA |
GOBARA |
2020-21 PS- GOBARA- RENO OF BANA GHAI KHAMA AT MAREIPATA (2412003/WC/10464819) |
BP |
02/09/2022 |
560251.09 |
179184.3 |
560173 |
0 |
137 | |
BELLAGUNTHA |
INGINATHI |
BLG 2019-20 RENO OF PANKAL NALA AT INGINATHI (2412003/WC/10397637) |
BP |
26/05/2022 |
440598.95 |
39406.32 |
404708 |
0 |
138 | |
BELLAGUNTHA |
INGINATHI |
BLG 2020-21 PS CONST OF MATHA NALA AT RATANGA (2412003/WC/10450885) |
BP |
02/08/2022 |
674325.99 |
103214.1 |
639762 |
0 |
139 | |
BELLAGUNTHA |
INGINATHI |
2020-21 PS -INGINATHI- IMP OF DIASANKA CANAL TO KARANA SAHI CANAL AT INGINATHI (2412003/WC/10453029) |
BP |
02/08/2022 |
580876.92 |
97223.33 |
581146 |
0 |
140 | |
BELLAGUNTHA |
INGINATHI |
2020-21 PS INGINATHI- IMP OF BADANALA CANAL TO HIGH SCHOOL CHHAKA CANAL AT SARIAPALLI (2412003/WC/10453030) |
BP |
02/08/2022 |
580876.92 |
97223.33 |
608038 |
0 |
141 | |
BELLAGUNTHA |
INGINATHI |
2020-21 PS INGINATHI- RENO OF BALADI CANAL (2412003/WC/10453031) |
BP |
02/08/2022 |
580876.92 |
97223.33 |
529478 |
0 |
142 | |
BELLAGUNTHA |
INGINATHI |
20-21 PS INGINATHI- RENO OF INGINATHI CANAL AT INGINATHI (2412003/WC/10453033) |
BP |
02/08/2022 |
580876.92 |
97223.33 |
381329 |
0 |
143 | |
BELLAGUNTHA |
INGINATHI |
2020-21 PS- INGINATHI- IMP & STRENGTHING OF DHOBA BANDHA AT INGINATHI OF (2412003/WC/10460757) |
BP |
26/04/2022 |
260220.02 |
483163.99 |
285670 |
482867.0738 |
144 | |
BELLAGUNTHA |
INGINATHI |
2020-21 PS -INGINATHI- IMP OF PANKALA NALA AT MANDARA (2412003/WC/10460758) |
BP |
02/08/2022 |
674325.99 |
102860.76 |
570088 |
0 |
145 | |
BELLAGUNTHA |
KHAIRPUTI |
2020-21 PS- Khairaputi - CONST. OF DRAINAGE FROM SANASADARA HARIAPALLI CULVERT TO SUNA TOTA (2412003/WC/10464350) |
BP |
02/11/2022 |
551972.77 |
191852.24 |
552905 |
0 |
146 | |
BELLAGUNTHA |
KHETRIBARPUR |
BLG 2019-20 RENO OF MAGHI BANDHA AT PALAKSANDA (2412003/WC/10397250) |
BP |
27/04/2022 |
400639.68 |
72651.69 |
414603 |
0 |
147 | |
BELLAGUNTHA |
KHETRIBARPUR |
BLG 2019-20 RENO OF KHAMA NALA AT PALAKSANDHA (2412003/WC/10397251) |
BP |
27/04/2022 |
400639.68 |
72651.69 |
423973 |
0 |
148 | |
BELLAGUNTHA |
KHETRIBARPUR |
BLG 2019-20 RENO OF BALI NALA AT PALAKSANDA (2412003/WC/10404587) |
BP |
27/04/2022 |
400639.68 |
72651.69 |
405968 |
0 |
149 | |
BELLAGUNTHA |
KHETRIBARPUR |
BLG 2019-20 RENO OF KAITHA BANDHA AT SINGHAMARDHAN (2412003/WC/10404588) |
BP |
26/05/2022 |
458724.95 |
36823.63 |
229161 |
0 |
150 | |
BELLAGUNTHA |
KHETRIBARPUR |
BLG 2019-20 RENO OF KHADA KHOLA NALA AT HARIHARASAHI (2412003/WC/10404598) |
BP |
04/09/2022 |
209998.08 |
63292.13 |
230436 |
0 |
151 | |
BELLAGUNTHA |
KHETRIBARPUR |
2020-21 GP- K.B.PUR-Reno of Nuapada Sala Bana Padia Khama Nala (2412003/WC/10474513) |
BP |
27/07/2022 |
640692.92 |
55652.75 |
324937 |
0 |
152 | |
BELLAGUNTHA |
MANGALPUR |
BLG 2019-20 RENO OF KHUNTA AGULA AT JILIBA (2412003/WC/10404569) |
BP |
26/05/2022 |
518755.34 |
71247.1 |
397231 |
0 |
153 | |
BELLAGUNTHA |
MANGALPUR |
BLG 2020-21 NEW PS IMP OF SINDHURA CANAL AT JILIBA (2412003/WC/10444716) |
BP |
25/07/2022 |
601818.54 |
73791.09 |
515499 |
0 |
154 | |
BELLAGUNTHA |
MANGALPUR |
BLG 2020-21 NEW PS IMP OF NANDIAPODA TO BENGEI DANDA NALA AT BELAPUNJI (2412003/WC/10444718) |
BP |
25/07/2022 |
577348.77 |
149860.37 |
580501 |
0 |
155 | |
BELLAGUNTHA |
MANGALPUR |
BLG 20-21 PS RENO OF JHAKAMAKA TANK AT JILIBA (2412003/WC/10452191) |
BP |
26/04/2022 |
457102.64 |
32357.98 |
406435 |
0 |
156 | |
BELLAGUNTHA |
MANGALPUR |
BLG 2020-21 NEW PS RENO OF NUA BANDHA AT GOTHALI (2412003/WC/10453464) |
BP |
25/07/2022 |
568057.93 |
60060.72 |
350070 |
0 |
157 | |
BELLAGUNTHA |
MANGALPUR |
BLG 2020-21 NEW PS RENO OF GHAI MULA NALA AT JILIBA (2412003/WC/10453465) |
BP |
25/07/2022 |
431092.92 |
48193.14 |
411258 |
0 |
158 | |
BELLAGUNTHA |
NETTENGA |
BLG 2020-21 PS BEAUTIFICATION OF BALI BANDHA AT SRIKARPUR (2412003/WC/10435551) |
BP |
09/10/2022 |
601593.85 |
349969.33 |
595360 |
335561 |
159 | |
BELLAGUNTHA |
NETTENGA |
BLG 2020-21 PS BEAUTIFICATION OF GRAMABANDHA AT GOBINDAPUR (2412003/WC/10435552) |
BP |
09/10/2022 |
601593.85 |
349969.33 |
591220 |
0 |
160 | |
BELLAGUNTHA |
NETTENGA |
BLG 2020-21 PS RENO OF KELA AGULA AT BALIBHAGA (2412003/WC/10435559) |
BP |
09/10/2022 |
765159.29 |
92944.94 |
756955 |
0 |
161 | |
BELLAGUNTHA |
NETTENGA |
BLG 2020-21 PS RENO OF GOBINDAPUR CANAL (2412003/WC/10435561) |
BP |
09/10/2022 |
525583.02 |
123371.84 |
502930 |
0 |
162 | |
BELLAGUNTHA |
NETTENGA |
BLG 2020-21 PS RENO OF SADANGIPALLI CANAL (2412003/WC/10435563) |
BP |
09/10/2022 |
525583.02 |
123371.84 |
498280 |
0 |
163 | |
BELLAGUNTHA |
NETTENGA |
BLG 2020-21 PS RENO OF KAITHAPALLI NALA (2412003/WC/10435564) |
BP |
09/10/2022 |
525583.02 |
123371.84 |
522850 |
0 |
164 | |
BELLAGUNTHA |
NETTENGA |
BLG 2020-21 NEW PS RENO OF CANAL NEAR NETTANGA SMASANGHATA SARANALA (2412003/WC/10444719) |
BP |
09/10/2022 |
563518.8 |
95928.56 |
578818 |
0 |
165 | |
BELLAGUNTHA |
NETTENGA |
BLG 2020-21 NEW PS RENO OF NETTANGA THAKURANI TEMPLE SIDE KHAMA NALA AT NETTANGA (2412003/WC/10444720) |
BP |
09/10/2022 |
593188.83 |
76266.03 |
525540 |
0 |
166 | |
BELLAGUNTHA |
NETTENGA |
BLG 2020-21 NEW PS RENO OF LANGIDOSORA NALA (2412003/WC/10444721) |
BP |
09/10/2022 |
627657.5 |
197801.21 |
591250 |
0 |
167 | |
BELLAGUNTHA |
NETTENGA |
BLG 20-21 BEAUTIFICATION OF BANIKA BANDHA AT NETTANGA (2412003/WC/10465603) |
BP |
09/10/2022 |
286341.14 |
647914.26 |
285930 |
517548 |
168 | |
BELLAGUNTHA |
PAILIPADA |
BLG 2020-21 PS IMP & STRENGTHENING OF VILLAGE TANK AT JALAKHAI (2412003/WC/10437363) |
BP |
02/09/2022 |
340889.57 |
599157.22 |
361760 |
0 |
169 | |
BELLAGUNTHA |
PAILIPADA |
BLG 2020-21 PS IMP & STRENGTHENING OF SHYAMASUNDAR MODEL TANK AT K NUAGADA (2412003/WC/10437368) |
BP |
02/11/2022 |
335581.68 |
605016.16 |
290920 |
0 |
170 | |
BELLAGUNTHA |
PAILIPADA |
BLG 21-22 RENO OF GHUSURI KHIA NALA AT PAILIPADA (2412003/WC/10477356) |
BP |
26/04/2022 |
476556.08 |
18443.92 |
284700 |
0 |
171 | |
BELLAGUNTHA |
SASAN |
BLG 2019-20 IMP & STRENGTHENING OF CHAMPA BANDHA AT BADADODNGA AT SASAN (2412003/WC/10411554) |
BP |
06/09/2022 |
335581.68 |
605016.16 |
345916 |
0 |
172 | |
BELLAGUNTHA |
SASAN |
BLG 21-22 PS RENO OF CANAL FROM RD ROAD TO BANJARA NALA (2412003/WC/10472285) |
BP |
02/09/2022 |
522739.02 |
60213.79 |
492787 |
0 |
173 | |
BELLAGUNTHA |
SASAN |
BLG 21-22 PS RENO OF CANAL FROM BANJARA NALA TO DAHANI PADIA NALA (2412003/WC/10472289) |
BP |
02/09/2022 |
600309.24 |
79187.21 |
563928 |
0 |
174 | |
BELLAGUNTHA |
TANARADA |
BLG 2019-20 IMP & STRENGTHENING OF PATI BANDHA AT TANARADA (2412003/WC/10411555) |
BP |
26/05/2022 |
371457.6 |
391338.06 |
375686 |
190135 |
175 | |
BELLAGUNTHA |
TANARADA |
BLG 2019-20 IMP & STRENGTHENING OF RAHUNATAHA MANDIRA BANDHA AT TANARADA (2412003/WC/10411561) |
BP |
26/05/2022 |
533472.96 |
341602.89 |
395044 |
0 |
176 | |
BELLAGUNTHA |
TANARADA |
BLG 2020-21 NEW PS RENO OF NALA FROM PATI BANDHA TO RIVER (2412003/WC/10444724) |
BP |
24/01/2023 |
626902.68 |
169391.79 |
611277 |
0 |
177 | |
BELLAGUNTHA |
TANARADA |
BLG 21-21 NEW RENO BASTNAB AGULA AT SODANGEI (2412003/WC/10459575) |
BP |
24/01/2023 |
401138.07 |
53661.98 |
225386 |
0 |
178 | |
BELLAGUNTHA |
TANARADA |
BLG 20-21 SPILL RENO OF PODHO GADIA AGULA AT KEBIRI (2412003/WC/10464600) |
BP |
24/12/2022 |
406695.51 |
61084.22 |
385403 |
0 |
179 | |
BELLAGUNTHA |
TANARADA |
BLG 20-21 NEW RENO OF GUDI BANDHA AT THENGADHARA (2412003/WC/10464747) |
BP |
24/01/2023 |
422438.56 |
41911.68 |
338184 |
0 |
180 | |
BELLAGUNTHA |
TANARADA |
BLG 20-21 RENO OF SMASAN TANK AT BANATUMBA (2412003/WC/10464748) |
BP |
02/11/2022 |
369451.53 |
11367.76 |
211090 |
0 |
181 | |
BELLAGUNTHA |
TANARADA |
BLG 20-21 NEW RENO OF PADMA NALA AT BANATUMBA (2412003/WC/10464749) |
BP |
24/01/2023 |
423386.06 |
31254.01 |
318934 |
0 |
182 | |
BELLAGUNTHA |
TANARADA |
BLG 20-21 RENO OF THANA BANDHA NEW TANARADA (2412003/WC/10469205) |
BP |
24/01/2023 |
403636.03 |
70889.24 |
232948 |
0 |
183 | |
BELLAGUNTHA |
UDHRA |
BLG 20-21 NEW PS RENO OF BENUGHAI AT NAYAKPADA (2412003/WC/10453485) |
BP |
22/08/2022 |
665469.62 |
128229.04 |
480239 |
0 |
184 | |
BELLAGUNTHA |
UDHRA |
BLG 2020-21 NEW PS RENO OF GOBARDHAN GHAI AT UDHURA (2412003/WC/10453489) |
BP |
22/08/2022 |
499537.85 |
95664.83 |
486660 |
0 |
185 | |
BELLAGUNTHA |
UDHRA |
BLG 20-21 SPILL RENO OF KANDHA GHAI AT KOKOLUNDA (2412003/WC/10460009) |
BP |
22/08/2022 |
419814.72 |
36060.99 |
450912 |
0 |
186 | |
BHANJANAGAR |
BRAHMANAPADAR |
IMP AND STRENGTHENING CANAL FROM PENGUJHOLA TO TALAJIBIKA (2412004/WC/10406602) |
BP |
30/01/2023 |
660675.75 |
34887.26 |
394710 |
0 |
187 | |
BHANJANAGAR |
BRAHMANAPADAR |
RENOV OF BHURUDUPALLI TANK (2412004/WC/10465868) |
BP |
19/08/2022 |
437391.5 |
53853.95 |
440320 |
0 |
188 | |
BHANJANAGAR |
DUMAKUMPA |
CONST OF CHECK DAM AT GUDIPADAR NALA (2412004/WC/10443329) |
BP |
31/01/2023 |
120440.92 |
360338.21 |
29920 |
0 |
189 | |
BHANJANAGAR |
DUMAKUMPA |
RENOV OF SARDULA HARIJANA SAHI BANDHA (2412004/WC/10468606) |
BP |
24/07/2022 |
568945.58 |
121176.51 |
574005 |
54074 |
190 | |
BHANJANAGAR |
DUMAKUMPA |
RENOV OF KHALA TADA TANK (2412004/WC/10468609) |
BP |
31/07/2022 |
567790.96 |
121664.95 |
529432 |
52766 |
191 | |
BHANJANAGAR |
DUMAKUMPA |
RENOV OF GUDIPADAR BARAKOLI AGULA (2412004/WC/10468610) |
BP |
30/07/2022 |
567790.96 |
121664.95 |
558298 |
24444 |
192 | |
BHANJANAGAR |
GOLAPADA |
RENOV OF GOLAPADA BADA KHAMANALA (2412004/WC/10468692) |
BP |
31/01/2023 |
942023.33 |
47976.68 |
906580 |
0 |
193 | |
BHANJANAGAR |
GOLAPADA |
RENOV OF GOLAPADA KOCHIA NALA (2412004/WC/10468693) |
BP |
06/09/2022 |
659680.2 |
40319.8 |
655849 |
0 |
194 | |
BHANJANAGAR |
GOLAPADA |
RENOV OF SATAMUHANA KHAMANALA (2412004/WC/10468694) |
BP |
02/05/2022 |
653083.4 |
31916.81 |
603964 |
0 |
195 | |
BHANJANAGAR |
GOLAPADA |
RENOV OF KHAPARAPALLI TANK (2412004/WC/10468695) |
BP |
31/01/2023 |
570229.35 |
112182.22 |
443420 |
0 |
196 | |
BHANJANAGAR |
GOLAPADA |
RENOV OF SANABANDHA GOLAPADA (2412004/WC/10468696) |
BP |
06/09/2022 |
570229.35 |
112182.22 |
563200 |
103983 |
197 | |
BHANJANAGAR |
SANAKODANDA |
RENOV OF PURUNA BANDHA AT MAHAGUDA (2412004/WC/10468701) |
BP |
30/01/2023 |
400000.24 |
85605.84 |
409220 |
0 |
198 | |
BHANJANAGAR |
TURUMU |
IMP AND STRENTHENING OF DHOBA SAHI CANAL (2412004/WC/10466594) |
BP |
03/11/2022 |
471090.43 |
24710.81 |
178350 |
0 |
199 | |
BUGUDA |
GOUDIABARADA |
BUG GOU GAN CONST OF CHECKDAM AT DALAKHAI NALA GANDHIGRAM (2412005/WC/10403635) |
BP |
26/04/2022 |
193120.26 |
280489.37 |
218815 |
259103 |
200 | |
BUGUDA |
KHOLAKHALLI |
BUG KHO TAL 18 19 CONST OF CHECKDAM AT BADASAGAR TALA NALA (2412005/WC/10342376) |
BP |
26/04/2022 |
150000 |
350000 |
150140 |
334752 |
201 | |
BUGUDA |
KHOLAKHALLI |
Bug kho Tal 19 20 Const of canal from Deula bandha to Nimabali (2412005/WC/10414269) |
BP |
06/09/2022 |
447394.83 |
46614.9 |
460280 |
0 |
202 | |
BUGUDA |
KHOLAKHALLI |
Bug kho Tal 19 20 Const of canal from sanghagara to kalu bhuyan thakurani (2412005/WC/10414270) |
BP |
06/09/2022 |
447394.83 |
46614.9 |
453150 |
0 |
203 | |
BUGUDA |
MANITARA |
BUG MAN TAM 2019 20 CONST OF CHECK DAM BADA NALA (2412005/WC/10402387) |
BP |
26/04/2022 |
192622.28 |
283562.08 |
198100 |
282772 |
204 | |
BUGUDA |
MANITARA |
BUGU MANI BHOG 2021 22 RENO OF SENAPATI NALLA (2412005/WC/10480697) |
BP |
29/07/2022 |
402972.78 |
77050.35 |
399080 |
0 |
205 | |
BUGUDA |
MOTABADI |
Bug Mot Daka Const of checkdem at Hata nala 2019 20 (2412005/WC/10402795) |
BP |
30/07/2022 |
193120.26 |
280818.35 |
177590 |
280521.68 |
206 | |
BUGUDA |
MOTABADI |
Bug Mot Mot Const of checkdem mankada chuanala 2019 20 (2412005/WC/10402797) |
BP |
26/04/2022 |
193120.26 |
280818.35 |
198810 |
280530.62 |
207 | |
BUGUDA |
KARASINGI |
BUG KAR KHA 19 20 COST OF CHEKDAM AT BANAGHAI NALA (2412005/WC/10402455) |
BP |
26/04/2022 |
154910.13 |
313119.61 |
157536 |
325177.88 |
208 | |
CHATRAPUR |
AGASTINUAGAM |
Water Harvesting Structure (WHS) at 8th Batallion Agastinuagaon (2412006/WC/10479062) |
BP |
25/05/2022 |
700470 |
129530 |
690365 |
118980 |
209 | |
CHATRAPUR |
AGASTINUAGAM |
Improvement of WHS at 8th Battalion (2412006/WC/10575614) |
BP |
30/12/2022 |
323898 |
216102 |
322788 |
213689 |
210 | |
CHATRAPUR |
BHIKARIPALLI |
RENOVATION OF MASANI BANDHA (2412006/WC/10405213) |
BP |
26/05/2022 |
601441.47 |
186515.04 |
525980 |
0 |
211 | |
CHATRAPUR |
BHIKARIPALLI |
DIGGINING OF NEW POND AT GADIA NALA (2412006/WC/10450988) |
BP |
03/11/2022 |
714767.83 |
259799.24 |
728280 |
14200 |
212 | |
CHATRAPUR |
BHIKARIPALLI |
EXCAVATION OF CANAL FROM P.W.D ROAD TO JHADAMEYA BANDH (2412006/WC/10468345) |
BP |
27/05/2022 |
423397.02 |
246758.56 |
279430 |
0 |
213 | |
CHATRAPUR |
CHAMAKHANDI |
CONST OF MODEL TANK OF SINDURAPALLI MASANI BANDHA (2412006/WC/10425320) |
BP |
28/01/2023 |
626468.81 |
326615.96 |
217110 |
0 |
214 | |
CHATRAPUR |
KONAMANA |
Renovation of Hanuman Mandir Bandha at Mathikhala (2412006/WC/10483848) |
BP |
25/08/2022 |
359489.63 |
128971.1 |
191980 |
0 |
215 | |
CHATRAPUR |
NARENDRAPUR |
RENOVATION WITH GUARD WALL OF NUA BANDHA (2412006/WC/10428235) |
BP |
23/08/2022 |
715847.62 |
242226.32 |
604240 |
0 |
216 | |
CHATRAPUR |
PODAPADAR |
DIGGINING OF BUDHIBANDHA POND WITH GARDWALL (2412006/WC/10484397) |
BP |
28/01/2023 |
561721.81 |
219962.47 |
166622 |
0 |
217 | |
CHATRAPUR |
SUNDARPUR |
Renovation of Karasuni Bandha at Arjunapalli (2412006/WC/10430820) |
BP |
11/04/2022 |
715541.74 |
254260.62 |
679290 |
142428 |
218 | |
CHATRAPUR |
SUNDARPUR |
Renovation of Kama Nua Bandha at Balarampur (2412006/WC/10483852) |
BP |
01/11/2022 |
718979.25 |
261942.21 |
748430 |
244225.7051 |
219 | |
CHATRAPUR |
SUNDARPUR |
Excavation Of Canal from Balarampur to Karapalli at Balarampur (2412006/WC/10528945) |
BP |
26/08/2022 |
732382.79 |
250762.12 |
335400 |
0 |
220 | |
CHIKITI |
GIRISOLA |
Const. of Check Dam-II at Jami Nala, Danapur (2412007/WC/10413678) |
BP |
03/09/2022 |
125261.22 |
355533.41 |
122771 |
355531.745 |
221 | |
CHIKITI |
K.NUAGAM |
CONST. OF CHECKDAM AT RAJABANDHA NALA AT K.NUAGAM (2412007/WC/10425948) |
BP |
29/07/2022 |
207596.56 |
466760.46 |
226840 |
469400 |
222 | |
CHIKITI |
KOTILINGI |
CONST. OF CHECK DAM AT RAULA NALA , KOTLING (2412007/WC/10467313) |
BP |
24/01/2023 |
164742.4 |
448849.58 |
120060 |
441177.2825 |
223 | |
CHIKITI |
LALAMENTA |
CONST.OF CHECK DAM AT MAHISALYA NALA, LALMENTA (2412007/WC/10446828) |
BP |
09/09/2022 |
171498.73 |
502145.28 |
157320 |
502143.73 |
224 | |
CHIKITI |
LALAMENTA |
CONST OF CHECK DAM ON KANKALA NALA , LALMENTA (2412007/WC/10486826) |
BP |
08/08/2022 |
171109.28 |
443336.02 |
157890 |
496372.798 |
225 | |
CHIKITI |
LALAMENTA |
CONST OF CHECK DAM OVER BATA BANDHA NALA , LALMENTA (2412007/WC/10486828) |
BP |
08/08/2022 |
171109.28 |
443336.02 |
179055 |
323218.64 |
226 | |
CHIKITI |
PITATALI |
CONST OF CHECK DAM AT LIARI NALA, MADHABANDH (2412007/WC/10425949) |
BP |
26/04/2022 |
207596.56 |
468283.61 |
209547 |
465000 |
227 | |
CHIKITI |
PITATALI |
CONST. OF CHECK DAM AT BANTA NALA, BAIRIBADA (2412007/WC/10459389) |
BP |
26/04/2022 |
205850.72 |
473107.69 |
209118 |
463417.6448 |
228 | |
CHIKITI |
PITATALI |
CONST. OF CHECK DAM AT KINDRA NALA, BAIRIBADA (2412007/WC/10479810) |
BP |
26/04/2022 |
185151.43 |
481626.38 |
159804 |
471587.4997 |
229 | |
DHARAKOTE |
BAHARAPUR |
RENOV OF CHARAGABAGADA NALA (2412008/WC/10545046) |
BP |
02/02/2023 |
339110.08 |
149194.69 |
137720 |
0 |
230 | |
DHARAKOTE |
BALARAMPUR |
RENOVATION OF GAON BANDHA AT KANHEIPUR (2412008/WC/10438782) |
BP |
20/11/2022 |
300038.9 |
180362.26 |
302645 |
175000 |
231 | |
DHARAKOTE |
BALARAMPUR |
RENOVATION OF PIASALA TANK AT PHATACHANCHARA (2412008/WC/10438784) |
BP |
20/11/2022 |
300038.9 |
180362.26 |
300160 |
175000 |
232 | |
DHARAKOTE |
BALARAMPUR |
RENOVATION OF KARI GHAI AT KENDUPADA (2412008/WC/10438788) |
BP |
20/11/2022 |
300038.9 |
180362.26 |
305570 |
175000 |
233 | |
DHARAKOTE |
BALARAMPUR |
RENOVATION OF BANA BANDHA AT JAGANNATHPUR (2412008/WC/10438791) |
BP |
20/11/2022 |
300038.9 |
180362.26 |
306120 |
180000 |
234 | |
DHARAKOTE |
BALARAMPUR |
RENOVATION OF GOUDUNI GHAI AT BALARAMPUR (2412008/WC/10438792) |
BP |
02/02/2023 |
422950.25 |
247253.98 |
75770 |
0 |
235 | |
DHARAKOTE |
DHARAKOTE |
Const of Checkdam at Kathulia nala Dharakote (2412008/WC/10426428) |
BP |
16/08/2022 |
320537.95 |
248313.43 |
327581 |
271792.4146 |
236 | |
DHARAKOTE |
DHARAKOTE |
RENOVATION OF KATHULIA NALA FROM KATHULIA TO SAPADHARA GHAI (2412008/WC/10483111) |
BP |
31/03/2023 |
415696.77 |
73861.57 |
232375 |
73294.87 |
237 | |
DHARAKOTE |
DHARAKOTE |
RENOVATION OF AGULA NALA FROM NH 59 TO MAHIPALA PADAR (2412008/WC/10483114) |
BP |
31/03/2023 |
307318.14 |
176548.5 |
296350 |
176385.59 |
238 | |
DHARAKOTE |
JHADABANDHA |
CONST. OF NEW TANK AT SUBARNAPUR (2412008/WC/10342320) |
BP |
03/11/2022 |
300000 |
200000 |
304201 |
158900 |
239 | |
DHARAKOTE |
JHADABANDHA |
IMP. OF GOAN BANDHA AT CHEMIDI HILL (2412008/WC/10342323) |
BP |
03/11/2022 |
300000 |
200000 |
292105 |
187000 |
240 | |
DHARAKOTE |
JHADABANDHA |
Renov.of Tulasi Bandha at Dujhabarapalli. (2412008/WC/10400393) |
BP |
03/11/2022 |
328977.14 |
152239.69 |
271610 |
0 |
241 | |
DHARAKOTE |
JHADABANDHA |
Renov.of Nua Ghai at Madanagandapalli. (2412008/WC/10400400) |
BP |
04/11/2022 |
328977.14 |
152239.69 |
302400 |
0 |
242 | |
DHARAKOTE |
JHADABANDHA |
Renov.of Gano Bandha at Kharipalli. (2412008/WC/10400402) |
BP |
27/05/2022 |
307756.34 |
172218.71 |
258290 |
0 |
243 | |
DHARAKOTE |
JHADABANDHA |
Renov.of Chanaghai at Padmapalli. (2412008/WC/10400403) |
BP |
03/09/2022 |
346338.68 |
135386.08 |
330669 |
46274 |
244 | |
DHARAKOTE |
JHADABANDHA |
Renov.of Pathara Ghai at Padmapalli. (2412008/WC/10400404) |
BP |
03/09/2022 |
316791.8 |
162390.13 |
312400 |
82981 |
245 | |
DHARAKOTE |
JHADABANDHA |
Renov.of Gano Bandha at Kalasuta (2412008/WC/10400409) |
BP |
03/09/2022 |
316619.1 |
162562.83 |
308958 |
0 |
246 | |
DHARAKOTE |
JHADABANDHA |
Renov.of Khari Khai Ghai at kalasuta. (2412008/WC/10400410) |
BP |
24/02/2023 |
310350.56 |
166733.2 |
59350 |
0 |
247 | |
DHARAKOTE |
JHADABANDHA |
Renov.of Nua Bandha at Panibandha. (2412008/WC/10401610) |
BP |
03/09/2022 |
313242.55 |
167057.26 |
330168 |
117937 |
248 | |
DHARAKOTE |
JHADABANDHA |
Renov.of Kankara Bandha at Jhadabandha. (2412008/WC/10401612) |
BP |
30/01/2023 |
312946.45 |
166772.28 |
219980 |
0 |
249 | |
DHARAKOTE |
JHADABANDHA |
Renov.of Belatapa Bandha at Kalasuta. (2412008/WC/10401628) |
BP |
03/09/2022 |
346338.68 |
135386.08 |
358076 |
135300 |
250 | |
DHARAKOTE |
JHADABANDHA |
Imp.of Babaji Tank With Guardwall at Kalasuta. (2412008/WC/10425514) |
BP |
27/05/2022 |
312683.34 |
167587.81 |
332222 |
0 |
251 | |
DHARAKOTE |
JHADABANDHA |
Imp.of Bhatapada New tank With Bathing step at Kalasuta. (2412008/WC/10425516) |
BP |
07/06/2022 |
301566.17 |
173387.71 |
300780 |
0 |
252 | |
DHARAKOTE |
JHADABANDHA |
Imp.of Dhana Ghara Ghai at Digi. (2412008/WC/10425524) |
BP |
30/01/2023 |
310975.54 |
163978.88 |
297330 |
163899.226 |
253 | |
DHARAKOTE |
JHADABANDHA |
Imp.of New tank at Bhaliapalli. (2412008/WC/10425527) |
BP |
03/09/2022 |
304347.44 |
172844.36 |
305190 |
0 |
254 | |
DHARAKOTE |
JHADABANDHA |
Imp.of kaitha Tank at Bhaliapalli (2412008/WC/10425529) |
BP |
04/11/2022 |
300876.05 |
174786.82 |
222270 |
0 |
255 | |
DHARAKOTE |
JHADABANDHA |
Imp.of New tank at Padma palli. (2412008/WC/10466879) |
BP |
07/06/2022 |
308360.92 |
175145.12 |
350250 |
0 |
256 | |
DHARAKOTE |
JHADABANDHA |
Imp.of Chana ghai at Padmapalli (2412008/WC/10466880) |
BP |
07/06/2022 |
308360.92 |
174316.99 |
265500 |
0 |
257 | |
DHARAKOTE |
JHADABANDHA |
Imp.of Pathara Ghai at Padmapalli. (2412008/WC/10466881) |
BP |
07/06/2022 |
308360.92 |
178095.12 |
334473 |
0 |
258 | |
DHARAKOTE |
JHADABANDHA |
Imp.of Kaitha tank at Jujhabarapalli. (2412008/WC/10468438) |
BP |
24/02/2023 |
308360.92 |
174429.7 |
80700 |
0 |
259 | |
DHARAKOTE |
MACHHAKOTE |
CONSTRUCTION OF CHECK DAM AT BAGANUNDA NALA (2412008/WC/10465726) |
BP |
26/08/2022 |
136465.85 |
327281.35 |
144480 |
326969.46 |
260 | |
DHARAKOTE |
MACHHAKOTE |
CONSTRUCTION OF CHEAK DAM AT BODA NALA (2412008/WC/10465727) |
BP |
26/08/2022 |
136465.85 |
327281.35 |
140135 |
327075.66 |
261 | |
DHARAKOTE |
MACHHAKOTE |
RENOVATION OF BADHI NALA AT MACHHAKOTE (2412008/WC/10482949) |
BP |
27/01/2023 |
329099.95 |
148748.21 |
329041 |
5124 |
262 | |
DHARAKOTE |
MACHHAKOTE |
RENOVATION OF DUNUDUBA NALA (2412008/WC/10482950) |
BP |
05/08/2022 |
327521.45 |
147326.64 |
360265 |
0 |
263 | |
DHARAKOTE |
MACHHAKOTE |
RENVATION OF BAGANUNDA NALA (2412008/WC/10482951) |
BP |
27/01/2023 |
329099.95 |
150748.21 |
329048 |
0 |
264 | |
DHARAKOTE |
MACHHAKOTE |
RENOVATION OF BODA NALA (2412008/WC/10482952) |
BP |
30/09/2022 |
327521.45 |
147326.64 |
321500 |
0 |
265 | |
DHARAKOTE |
MACHHAKOTE |
RENOVATION OF MENDHAKHAI NALA (2412008/WC/10482955) |
BP |
28/10/2022 |
338876.68 |
141075.36 |
323460 |
141005.965 |
266 | |
DHARAKOTE |
MANIKYAPUR |
CONST.OF CHECK DAM WITH DRAIN KARANJEI NALA (2412008/WC/10441014) |
BP |
27/04/2022 |
360354.03 |
212871.21 |
369600 |
212273.2 |
267 | |
DHARAKOTE |
RUGUMU |
RENOVATION OF ADIBANDHA HARIJANA SAHI TO KANIA NALA (2412008/WC/10422262) |
BP |
06/12/2022 |
320053.5 |
70393.64 |
300539 |
0 |
268 | |
DHARAKOTE |
RUGUMU |
BEAUTIFICATION OF BHALU DHIMBIRA GHAI (2412008/WC/10422561) |
BP |
03/11/2022 |
600756.74 |
365776.61 |
600124 |
364228.2402 |
269 | |
DHARAKOTE |
RUGUMU |
Renovation Bengei bandha (2412008/WC/10422584) |
BP |
03/11/2022 |
300217.77 |
174769.26 |
300030 |
174769 |
270 | |
DHARAKOTE |
RUGUMU |
Rrnov. of Bhalu dhimbira ghai to Sita amba nala (2412008/WC/10430162) |
BP |
05/03/2023 |
314149.85 |
76813.81 |
296373 |
76475.46 |
271 | |
DHARAKOTE |
RUGUMU |
CONSTRUCTION OF STAGGERED TRENCH AT DHAUKHAMAN DHIMBIRAMALA (2412008/WC/10443506) |
BP |
27/04/2022 |
108630.31 |
10142.07 |
114170 |
0 |
272 | |
DHARAKOTE |
RUGUMU |
Renovetation of Bethuar Dhaukhaman nala (2412008/WC/10447980) |
BP |
27/01/2023 |
320807.2 |
63364.39 |
241493 |
0 |
273 | |
DHARAKOTE |
RUGUMU |
Renovation of Bethuar jena nala (2412008/WC/10447981) |
BP |
04/09/2022 |
320807.2 |
66292.38 |
343069.84 |
0 |
274 | |
DHARAKOTE |
SARADHAPUR |
CONSTRUCTION OF PATANA BANDHA NEAR SMASAN HOUSE (2412008/WC/10483412) |
BP |
26/05/2022 |
311599.27 |
169591.6 |
335100 |
0 |
275 | |
DHARAKOTE |
SINGIPUR |
CONSTRUCTION OF CANAL FROM MAHABANDHA TO KAITHAPALLI. (2412008/WC/10483858) |
BP |
05/09/2022 |
300813.12 |
180534.1 |
306670 |
0 |
276 | |
DHARAKOTE |
SINGIPUR |
CONSTRUCTION OF CANAL FROM KAITHIRA SIMILI TO GOLA GHAI CANAL. (2412008/WC/10483859) |
BP |
05/09/2022 |
300813.12 |
180534.1 |
307110 |
0 |
277 | |
DHARAKOTE |
SINGIPUR |
CONSTRUCTION OF CANAL R.D. ROAD TO KHUKUNDIAPALLI. (2412008/WC/10483861) |
BP |
05/09/2022 |
300813.12 |
180534.1 |
229630 |
0 |
278 | |
DHARAKOTE |
OLAMBA |
CONST OF CHECKDAM AT KHAJURIBANDHA CENAL (2412008/WC/10486406) |
BP |
29/10/2022 |
101515.57 |
378341.86 |
133600 |
345647.5481 |
279 | |
DIGAPAHANDI |
B.TURUBUDI |
Excavation of canal from Kanheya nala to gochara padia (2412009/WC/10440407) |
BP |
06/09/2022 |
204454.61 |
268552.72 |
203067 |
268546 |
280 | |
DIGAPAHANDI |
B.TURUBUDI |
IMP & STRENGTHING OF MAHADEV BANDHA (2412009/WC/10446002) |
BP |
03/11/2022 |
230312.79 |
676521.13 |
229888 |
580078 |
281 | |
DIGAPAHANDI |
B.TURUBUDI |
Renovation of Pathara Bandha (2412009/WC/10457795) |
BP |
03/11/2022 |
421623.21 |
157944.83 |
413030 |
97961 |
282 | |
DIGAPAHANDI |
B.TURUBUDI |
Excavation of New Tank at Gudari (2412009/WC/10458909) |
BP |
03/11/2022 |
560374.31 |
213740.01 |
571300 |
189251 |
283 | |
DIGAPAHANDI |
B.TURUBUDI |
Renovation of Jhada Bandha (2412009/WC/10458910) |
BP |
23/08/2022 |
560374.31 |
213740.01 |
564090 |
228184 |
284 | |
DIGAPAHANDI |
B.TURUBUDI |
Construction of Canal from Bada Sagar to Jhutia Ghati (2412009/WC/10467752) |
BP |
03/11/2022 |
281528.73 |
382831.2 |
280830 |
416981 |
285 | |
DIGAPAHANDI |
B.TURUBUDI |
Renovation of Canal from Chatramandir to LN Pur (2412009/WC/10492015) |
BP |
17/12/2022 |
320559.37 |
441247.54 |
318790 |
467970 |
286 | |
DIGAPAHANDI |
B.TURUBUDI |
Excavation of Canal from Hera Bandha to Kumuti Bandha (2412009/WC/10492018) |
BP |
06/09/2022 |
320119.04 |
437498.15 |
319974 |
467381 |
287 | |
DIGAPAHANDI |
B.TURUBUDI |
Renovation of Canal from Mangarajpur to Chatramandir (2412009/WC/10492019) |
BP |
10/12/2022 |
320436.55 |
436573.13 |
268470 |
0 |
288 | |
DIGAPAHANDI |
B.TURUBUDI |
Renovation of Gaon Band at Ambapur (2412009/WC/10492599) |
BP |
17/12/2022 |
480287.16 |
109257.2 |
480180 |
79612.3715 |
289 | |
DIGAPAHANDI |
B.TURUBUDI |
Renovation of Khari Bandha at Kandasar (2412009/WC/10492602) |
BP |
17/12/2022 |
640219.38 |
147016.25 |
641150 |
105595 |
290 | |
DIGAPAHANDI |
B.TURUBUDI |
Renovation of Gaon Bandha near UP School at Kandasar (2412009/WC/10492604) |
BP |
21/11/2022 |
640075.2 |
147160.55 |
320480 |
15848 |
291 | |
DIGAPAHANDI |
BADADUMULA |
Renovation of Canal from Ustakiari to Ramachandra Pradhan Goroda (2412009/WC/10492021) |
BP |
17/12/2022 |
87928.34 |
102187.16 |
99400 |
83971.5577 |
292 | |
DIGAPAHANDI |
BAMAKEI |
Construction of Canal from Bada Bandha to Gaya Bandha (2412009/WC/10537574) |
BP |
06/09/2022 |
731125.53 |
151920.99 |
729492 |
140405 |
293 | |
DIGAPAHANDI |
BHISMAGIRI |
Irrigation Canal from Palli Chak to Karanji pahada (2412009/WC/10427229) |
BP |
16/11/2022 |
240521.5 |
322452.58 |
240590 |
290506 |
294 | |
DIGAPAHANDI |
BHISMAGIRI |
Irrigation Canal from Ramanavami Teli Pahada (2412009/WC/10427231) |
BP |
15/11/2022 |
163316.32 |
211853.45 |
173600 |
189875 |
295 | |
DIGAPAHANDI |
CHASANIMAKHANDI |
RENOV OF RAGHU BANDHA (2412009/WC/10537903) |
BP |
03/12/2022 |
828464.18 |
150636.93 |
764572 |
33466 |
296 | |
DIGAPAHANDI |
GOKARNAPUR |
Construction of field Channel from Smasan to Bada Bandha (2412009/WC/10492084) |
BP |
06/09/2022 |
406936.84 |
540520.46 |
288711 |
537213 |
297 | |
DIGAPAHANDI |
GOKARNAPUR |
Construction of Field Channeel from Badabandha to Nua Bandha at BPN Pur (2412009/WC/10492088) |
BP |
03/11/2022 |
402592.31 |
543098.56 |
230988 |
342768 |
298 | |
DIGAPAHANDI |
GOKARNAPUR |
Construction of Filed Channel from PWD Road to HArininala at Gokarnapur (2412009/WC/10492094) |
BP |
05/11/2022 |
401433.28 |
538584.02 |
292680 |
560639 |
299 | |
DIGAPAHANDI |
GOKARNAPUR |
Construction of Field Channel from Tuta Bandha to Bakada Bandha at Gokarnapur (2412009/WC/10492104) |
BP |
05/11/2022 |
406936.84 |
540520.46 |
299349 |
480213 |
300 | |
DIGAPAHANDI |
GOKARNAPUR |
Renovation of Outlet with Field Channel of Khari Bandha (2412009/WC/10492124) |
BP |
13/09/2022 |
409296.16 |
541813.47 |
414197 |
249588 |
301 | |
DIGAPAHANDI |
KAITHADA |
Construction of Check Dam at Nuabandha Nala (2412009/WC/10464448) |
BP |
30/11/2022 |
136415.88 |
434211.49 |
152040 |
290093 |
302 | |
DIGAPAHANDI |
KAITHADA |
Irrigation Channel from Bomokoi Distributor Canal to Nua Bandha (2412009/WC/10512659) |
BP |
28/12/2022 |
342563.83 |
411421.29 |
342315 |
373611.115 |
303 | |
DIGAPAHANDI |
KAITHAKHANDI |
Construction of Check Dam near Khajuri Bandha Nala (2412009/WC/10491357) |
BP |
17/12/2022 |
164642.12 |
613766.53 |
173792 |
622006.4855 |
304 | |
DIGAPAHANDI |
KAITHAKHANDI |
Renovation of Gramya Bandha (2412009/WC/10538798) |
BP |
15/11/2022 |
644605.5 |
137321.56 |
609200 |
147062 |
305 | |
DIGAPAHANDI |
KUSAPADA |
Construction of Irriggation Channel from Gaon Bandha to Sapua Nala at Patanda (2412009/WC/10492583) |
BP |
02/12/2022 |
280745.59 |
383445.44 |
194754 |
392558.2264 |
306 | |
DIGAPAHANDI |
NIMAKHANDIPENTHA |
Renovation of Beda Bandha (2412009/WC/10467383) |
BP |
26/05/2022 |
652375.76 |
223474.04 |
800520 |
0 |
307 | |
DIGAPAHANDI |
PHASIGUDA |
Beautification of Bata Bandha (2412009/WC/10449558) |
BP |
06/09/2022 |
209181.62 |
742851.38 |
206630 |
781772 |
308 | |
DIGAPAHANDI |
SIDHESWAR |
Construction of Irrigation Canal from Bisoyi sahi danda to Adikandapur road (2412009/WC/10435079) |
BP |
13/06/2022 |
211506.53 |
545127.99 |
220080 |
556063 |
309 | |
DIGAPAHANDI |
SIDHESWAR |
Improvement of Matia Bandha Canal from Adikandapur to Gopalpur (2412009/WC/10435080) |
BP |
06/09/2022 |
159693.34 |
447577.25 |
150658 |
460313 |
310 | |
DIGAPAHANDI |
SIDHESWAR |
Construction of Canal from BNRGSK side to Gaudabapa road (2412009/WC/10435081) |
BP |
26/05/2022 |
135434.58 |
337810.93 |
113778 |
360012 |
311 | |
DIGAPAHANDI |
SIDHESWAR |
Improvement & Strengthening of Nua Bandha (2412009/WC/10458376) |
BP |
13/06/2022 |
279026.65 |
651674.89 |
282092 |
689152 |
312 | |
DIGAPAHANDI |
SIDHESWAR |
Irrigation Canalfrom Masani Nala to Badasahi Ghai (2412009/WC/10460987) |
BP |
10/08/2022 |
280893.36 |
384905.57 |
263946 |
369179.795 |
313 | |
DIGAPAHANDI |
SIDHESWAR |
Irrigatin Canal from Teli BAti to Khuntu Khunta (2412009/WC/10460988) |
BP |
13/06/2022 |
280893.36 |
384705.57 |
279842 |
345053 |
314 | |
DIGAPAHANDI |
SIDHESWAR |
Irrigation Canal from Gudia Bandha to Madala Bandha (2412009/WC/10460989) |
BP |
28/01/2023 |
280893.36 |
385125.57 |
288953 |
393638 |
315 | |
DIGAPAHANDI |
SIDHESWAR |
Irrigation Canal from Shiba temple to Khaspa Nala (2412009/WC/10460990) |
BP |
06/09/2022 |
280893.36 |
384705.57 |
290615 |
375899.7597 |
316 | |
DIGAPAHANDI |
SIDHESWAR |
Construction of Canal from OAV Hostel to Electry Sub Station (2412009/WC/10460991) |
BP |
06/09/2022 |
280893.36 |
384405.57 |
281006 |
393559 |
317 | |
DIGAPAHANDI |
SIDHESWAR |
Construction of Irrigation Canal from Masani Nala to Haridas Ghai (2412009/WC/10492556) |
BP |
29/09/2022 |
403428.01 |
86030.09 |
402490 |
11144 |
318 | |
DIGAPAHANDI |
SIDHESWAR |
Construction of Irrigation Canal from Goudabapa to Khuntu Khunta (2412009/WC/10512669) |
BP |
06/09/2022 |
291334.58 |
366834.3 |
291130 |
374182 |
319 | |
DIGAPAHANDI |
SIDHESWAR |
Irrigation Canal from Electri Office to Kotinada GP Office (2412009/WC/10512673) |
BP |
06/09/2022 |
370023.64 |
475381.58 |
373254 |
496047.5247 |
320 | |
DIGAPAHANDI |
KOTINADA |
Irrigation Canal from Gordaghai to Village Ambatota (2412009/WC/10460559) |
BP |
06/09/2022 |
287230.51 |
384955.19 |
287267 |
379316 |
321 | |
DIGAPAHANDI |
KOTINADA |
Renovation and Construction of Irrigation Canal from Gordapadar to Villave Ambatota (2412009/WC/10492004) |
BP |
06/09/2022 |
281143.29 |
381858.16 |
281117 |
383619 |
322 | |
DIGAPAHANDI |
KOTINADA |
Irrigation Channel from Sidheswar Hud to Kaspanala (2412009/WC/10512660) |
BP |
23/08/2022 |
364784.07 |
483486.67 |
365120 |
539892 |
323 | |
DIGAPAHANDI |
KOTINADA |
Irrigation Channel from Village Ambatota to Ganju (2412009/WC/10512661) |
BP |
30/08/2022 |
362251.5 |
486019.35 |
360510 |
441586 |
324 | |
GANJAM |
PALANGA |
Palanga-Excav. and Const. of Model Tank at Udayanatha Mandira front at Kanakhai(18-19) (2412010/WC/10342582) |
BP |
02/11/2022 |
663000 |
337000 |
398504 |
8725.5 |
325 | |
GANJAM |
SANTOSHPUR |
Santoshpur-Const. of Check Dam at Puruna Mala Nala-01(18-19) (2412010/WC/10331825) |
BP |
27/04/2022 |
127000 |
373000 |
126681 |
263110 |
326 | |
GANJAM |
SANTOSHPUR |
Santoshpur / Const of Check Dam at Sabar Redika Nala / 1 at Kujidhipa 2019-20 (2412010/WC/10366299) |
BP |
06/06/2022 |
150012.91 |
320971.47 |
88389 |
319434 |
327 | |
HINJILICUT |
CHANDULI |
Renovation of Andhuni Nalla (2412011/WC/10475035) |
BP |
03/01/2023 |
781522 |
203991.03 |
594480 |
19140 |
328 | |
HINJILICUT |
GANDALA |
Renovation of Pania Pasara Bandha at Gandala (2412011/WC/10412668) |
BP |
20/03/2023 |
799447.87 |
173250.71 |
799416 |
10140 |
329 | |
HINJILICUT |
KANCHURU |
Renovation of Bauri Bandha at Sardhapur (2412011/WC/10408918) |
BP |
04/01/2023 |
701970.42 |
277517.41 |
621361 |
237217.2856 |
330 | |
JAGANNATHPRASAD |
ALLASUGUMA |
CONST OF CHECK DAM AT SANDHI NALA OF ALASUGUMA GP (2412012/WC/10454363) |
BP |
16/04/2022 |
209431.48 |
429120.78 |
218970 |
472129 |
331 | |
JAGANNATHPRASAD |
CHAMUNDA |
CONST OF CHECK DAM AT TELIKIARI NALLA AT CHOPRA (2412012/WC/10464579) |
BP |
01/04/2022 |
166261.58 |
275324.53 |
202907 |
293749 |
332 | |
JAGANNATHPRASAD |
GAYAGANDA |
CONST OF CHECK DAM AT ADIBASI COLONI GOURA MALIK NALLA OF GAYAGANDA GP (2412012/WC/10455790) |
BP |
28/04/2022 |
150289.5 |
288958.34 |
205047 |
287953 |
333 | |
JAGANNATHPRASAD |
KADUA |
CONST OF NEW TANK AT SINGIPUR OF KADUA GP (2412012/WC/10397413) |
BP |
19/04/2022 |
477386.72 |
22616.58 |
476640 |
15888 |
334 | |
JAGANNATHPRASAD |
KHAMARAPALLI |
IMP AND STRENGTHENING OF DURGADEBI BANDHA AT NIMAPADAR OF KHAMARPALLI GP (2412012/WC/10402385) |
BP |
24/11/2022 |
600046.56 |
362247.69 |
549430 |
195906 |
335 | |
JAGANNATHPRASAD |
RUDHAPADAR |
CONST OF CANAL AT SIULI NALA VILLAGE SIULI OF RUDHAPADAR GP (2412012/WC/10493305) |
BP |
05/09/2022 |
800226.41 |
179732.48 |
795680 |
193406 |
336 | |
JAGANNATHPRASAD |
TARASINGI |
CONST OF CHECK DAM AT GOUDA BHUMI NALLA AT TOLADI OF TARASINGI GP (2412012/WC/10449266) |
BP |
17/05/2022 |
300024.16 |
670783.74 |
312899 |
670618 |
337 | |
JAGANNATHPRASAD |
TARASINGI |
CONST OF CHECK DAM AT PAICHALIA NALL AT TOLADI OF TARASINGI GP (2412012/WC/10456746) |
BP |
18/02/2023 |
150289.5 |
288958.34 |
212500 |
114960.4524 |
338 | |
KABISURYANAGAR |
AMBAPUA |
KSN1920AMBAPUAGP-GOLAMUNDALA- RENO.&IMP OF BADABANDA AT GOLAMUNDALA (2412013/WC/10397020) |
BP |
26/04/2022 |
481524.65 |
111323.23 |
493050 |
108284.7395 |
339 | |
KABISURYANAGAR |
AMBAPUA |
201920-AMBAPUAGP-GOLAMUNDALA-MODEL TANK AT NUA BANDHA OF GOLAMUNDALA (2412013/WC/10400928) |
BP |
14/12/2022 |
370949 |
514264.32 |
286052 |
513750.7452 |
340 | |
KABISURYANAGAR |
ATHAGADA PATANA |
KSN2021athagadapatna-Reno of gauradei ghai to katha halia nallah . (2412013/WC/10421793) |
BP |
05/08/2022 |
809561.84 |
168378.67 |
859282 |
0 |
341 | |
KABISURYANAGAR |
ATHAGADA PATANA |
KSN2021 APATNA RENO OF KARNESWAR TO PASANA KHOLIA NALLAH (2412013/WC/10421880) |
BP |
05/08/2022 |
809561.84 |
168378.67 |
810320 |
0 |
342 | |
KABISURYANAGAR |
ATHAGADA PATANA |
Ksn2021/22-A.Patna Reno & Imp of Gundicha Ghai (2412013/WC/10476343) |
BP |
27/11/2022 |
804013.8 |
188891.45 |
800100 |
0 |
343 | |
KABISURYANAGAR |
ATHAGADA PATANA |
Ksn2021/22-A.Patna-Reno & Imp of Bhima das ghai A.Patna (2412013/WC/10480276) |
BP |
05/08/2022 |
800918.33 |
192916.19 |
809340 |
0 |
344 | |
KABISURYANAGAR |
ATHAGADA PATANA |
Ksn2021/22-A.Patna- Const of leading canel between Jambheswar Mahadeba to Jharana Nallah (2412013/WC/10480277) |
BP |
31/01/2023 |
801792.32 |
172598.82 |
801290 |
0 |
345 | |
KABISURYANAGAR |
ATHAGADA PATANA |
Ksn2021/22-A.Patna-Const of Leading canel ona nallah between Ejhara nala to PWD road nala (2412013/WC/10480279) |
BP |
28/10/2022 |
805371.47 |
187545.1 |
802390 |
0 |
346 | |
KABISURYANAGAR |
ATHAGADA PATANA |
Ksn2021/22-A.Patna-Const of leading canel on PWD road to Nua sahi Nallah (2412013/WC/10480282) |
BP |
05/08/2022 |
800811.7 |
179780.9 |
811910 |
0 |
347 | |
KABISURYANAGAR |
ATHAGADA PATANA |
Ksn2021/22-A.Patna-Reno & Imp of Patro bedha Bandha (2412013/WC/10529777) |
BP |
29/12/2022 |
487799.61 |
12197.27 |
480600 |
0 |
348 | |
KABISURYANAGAR |
ATHAGADA PATANA |
Ksn2021/22-A.Patna-Reno & Imp of Nalla from Pathara dhimira to Bhanjaharghai (2412013/WC/10551209) |
BP |
01/12/2022 |
485445.25 |
13551.64 |
484560 |
0 |
349 | |
KABISURYANAGAR |
BADAMAHURI |
Ksn2020/21-Badamahuri Reno & Imp of jharanallah Badamahuri (2412013/WC/10423413) |
BP |
02/11/2022 |
960885.92 |
39114.07 |
987430 |
0 |
350 | |
KABISURYANAGAR |
BADAMAHURI |
Ksn2020/21-Badamahuri- Reno & Imo of Bada nallah Badamahuri (2412013/WC/10423414) |
BP |
02/11/2022 |
960885.92 |
39114.07 |
983410 |
0 |
351 | |
KABISURYANAGAR |
BADAMAHURI |
Ksn2021/22-Badamahuri-Model tank of Badabandha at Badamahuri (2412013/WC/10471789) |
BP |
24/08/2022 |
356129.63 |
584374.56 |
357290 |
211396 |
352 | |
KABISURYANAGAR |
BADAMAHURI |
Ksn2021/22-Badamahuri Reno & Imp of Harijanasahi to Sola bandha Nallah (2412013/WC/10488804) |
BP |
24/08/2022 |
953838.9 |
41161.1 |
645260 |
0 |
353 | |
KABISURYANAGAR |
BALIASARA |
KSN2021 BALIASARA S NUAGAON RENO AND IMP OF NALLAH FROM SINGHA GHAI TO NUA GAON (2412013/WC/10421744) |
BP |
19/08/2022 |
805525.34 |
171056.52 |
806950 |
0 |
354 | |
KABISURYANAGAR |
BALIASARA |
ksn2021 baliasara RENO AND IMP OF DHOBA PADIA TO CHARCHI TOTA NALLAH (2412013/WC/10425972) |
BP |
19/08/2022 |
809561.84 |
168378.67 |
796795 |
0 |
355 | |
KABISURYANAGAR |
BALIASARA |
KSN2021 BALIASARA SANDHAMARA CONST OF CHECK DAM AT DHARSA NALLAH (2412013/WC/10448442) |
BP |
27/01/2023 |
308361.8 |
160564.36 |
43428 |
0 |
356 | |
KABISURYANAGAR |
BAUNSIA |
KSN1920 Baunsia Patharapalli Reno and imp of Andharia baradhimbira (2412013/WC/10394971) |
BP |
27/04/2022 |
555392.6 |
32994.35 |
554900 |
0 |
357 | |
KABISURYANAGAR |
BAUNSIA |
Ksn201920Baunsia Reno of Nalla between rajiba Gandhi AWc bulding (2412013/WC/10408960) |
BP |
27/04/2022 |
421529.26 |
169368.57 |
323930 |
95813 |
358 | |
KABISURYANAGAR |
BAUNSIA |
BAUNSIA EBBPUR RENO AND IMP OF TALA BANDHA (2412013/WC/10410757) |
BP |
27/04/2022 |
350160.81 |
134307.68 |
213150 |
56985.771 |
359 | |
KABISURYANAGAR |
BAUNSIA |
KSN2021 BAUNSIA ARJUNAPALLI CONST OF CANAL FROM KAKUDIA PAHADA TO JHARANALLH (2412013/WC/10442029) |
BP |
31/01/2023 |
402813.55 |
91674.25 |
392822 |
0 |
360 | |
KABISURYANAGAR |
BAUNSIA |
KSN2021 BAUNSIA RENO AND IMP OF SANA BANDHA (2412013/WC/10442803) |
BP |
05/09/2022 |
800353.27 |
188653.75 |
454940 |
0 |
361 | |
KABISURYANAGAR |
BAUNSIA |
KSN2021BAUNSIA ARJUNAPALLI CONST OF CANAL JHARANALLAH SWITCH GATE TO HADIA GAUDA GHAI (2412013/WC/10442804) |
BP |
03/09/2022 |
402813.55 |
91674.25 |
401870 |
0 |
362 | |
KABISURYANAGAR |
BAUNSIA |
KSN2021 BAUNSIA BNUAPALLICONST OF CANAL FROM HARIJANA SAHI TO NANI BANDHA (2412013/WC/10444069) |
BP |
27/04/2022 |
400350.61 |
96752.42 |
372361 |
84042 |
363 | |
KABISURYANAGAR |
BAUNSIA |
KSN2122 BAUNSIA RENO AND IMP OF JHARANA BANDHA (2412013/WC/10536916) |
BP |
05/09/2022 |
402297.9 |
91623.16 |
409720 |
0 |
364 | |
KABISURYANAGAR |
BAUNSIA |
KSN202122 BAUNSIA RENO AND IMP OF SUNADEI BANDHA (2412013/WC/10536918) |
BP |
31/01/2023 |
402297.9 |
91623.16 |
353058 |
0 |
365 | |
KABISURYANAGAR |
BOLASARA |
KSN1920BOLASRA MODEL TANK OF DEULA BANDHA (2412013/WC/10412451) |
BP |
29/03/2023 |
302978.08 |
564424.07 |
306268 |
562868.8965 |
366 | |
KABISURYANAGAR |
BOLASARA |
KSN2021 BOLASARA RENO NALA FROM KANI NALA TO GOJA NALA (2412013/WC/10449699) |
BP |
23/08/2022 |
812524.42 |
177042.95 |
794128 |
0 |
367 | |
KABISURYANAGAR |
BOLASARA |
KSN2021 BOLASARA RENO OF NALA FROM BIJAY BHOLA PADAR TO DALAKHAI (2412013/WC/10450652) |
BP |
27/09/2022 |
812524.42 |
178889.7 |
397000 |
0 |
368 | |
KABISURYANAGAR |
BOLASARA |
KSN2021 BOLASARA RENO OF NALA FROM KANHU NAHAK PADAR TO BIJAY BHOLA PADAR (2412013/WC/10455336) |
BP |
23/08/2022 |
812524.42 |
169501.61 |
504812 |
0 |
369 | |
KABISURYANAGAR |
BOLASARA |
KSN2021 BOLASARA RENO OF NALA FROM RATHA TOTA TO KANI PADARA (2412013/WC/10455337) |
BP |
23/08/2022 |
812524.42 |
169501.61 |
359840 |
0 |
370 | |
KABISURYANAGAR |
BOLASARA |
KSN2021 BOLASARA CONST OF CHECK DAM AT SOURI NAHAK JAMI AT PADIA NALLAH (2412013/WC/10456994) |
BP |
03/12/2022 |
308361.8 |
160568.16 |
269384 |
0 |
371 | |
KABISURYANAGAR |
BORASINGI |
KSN201920 BORASINGI IMP OF KHALA NALA FROM BADA TOTA TO SIBA MANDIRA (2412013/WC/10401782) |
BP |
02/11/2022 |
350756.1 |
126599.76 |
221400 |
126022 |
372 | |
KABISURYANAGAR |
BORASINGI |
KSN202021 BORASINGI EXCAVATION OF NEW TENK AT SINGI KANA (2412013/WC/10430399) |
BP |
26/04/2022 |
785206.53 |
196712.39 |
790595 |
86366.0804 |
373 | |
KABISURYANAGAR |
BORASINGI |
KSN202021 BORASINGI B CH PADA RENOAND IMP OF KHAMA NALLAH FROM TALA5AHI CHAURATO KAPA GHAI (2412013/WC/10458780) |
BP |
27/12/2022 |
800723.87 |
185034.61 |
784225 |
132363 |
374 | |
KABISURYANAGAR |
BORASINGI |
BORASINGI STAGGERED TRENCH AT THALI PAHADA L.NO 5327 DT-06/06/2022 (2412013/WC/10576073) |
BP |
27/12/2022 |
236335.78 |
7663.88 |
230075 |
0 |
375 | |
KABISURYANAGAR |
GANGAPUR |
KSNL1819-GANGAPUR-RENO. AND IMP. OF MADHUA PADAR BANDHA (2412013/WC/10331551) |
BP |
16/10/2022 |
368879 |
131121 |
343086 |
120899.1158 |
376 | |
KABISURYANAGAR |
GANGAPUR |
KSN1819-GANGAPUR-GANGAPUR-RENO. AND IMP. OF GAON BANDHA (2412013/WC/10342085) |
BP |
20/11/2022 |
346000 |
254000 |
352506 |
159164.875 |
377 | |
KABISURYANAGAR |
GANGAPUR |
KSN1920 GANGAPUR CONST OF CULVERT BETWEEN GANGAPUR GAHIRI MALA ROAD TO SANA NALA (2412013/WC/10400447) |
BP |
05/09/2022 |
206545.38 |
271876 |
179520 |
121410.246 |
378 | |
KABISURYANAGAR |
GANGAPUR |
KSN2021 GANGAPUR CULVERT AT KHAMANALA ROAD FROM HARIJANA SAHI TO BNRGSK BUILDING ROAD (2412013/WC/10421035) |
BP |
11/10/2022 |
301778.81 |
179531.81 |
241420 |
0 |
379 | |
KABISURYANAGAR |
GANGAPUR |
KSN2122GANGAPUR RENO & IMP. OF BADA NALLAH (2412013/WC/10480156) |
BP |
11/10/2022 |
804013.8 |
184308.03 |
822960 |
0 |
380 | |
KABISURYANAGAR |
GANGAPUR |
KSN2122 GANGAPUR RENO & IMP OF BADA BANDHA (2412013/WC/10480160) |
BP |
20/11/2022 |
804013.8 |
184308.03 |
787030 |
0 |
381 | |
KABISURYANAGAR |
GANGAPUR |
KSN2122 GANGAPUR RENO & IMP OF HARIJANA SAHI BANDHA (2412013/WC/10480161) |
BP |
02/11/2022 |
804013.8 |
184308.03 |
799300 |
0 |
382 | |
KABISURYANAGAR |
GUDIALI |
Ksn2021-Gudiali-Reno.& Imp. of Jhipirikholia Jena Ghai (2412013/WC/10465424) |
BP |
25/08/2022 |
922952.69 |
74178.31 |
965135 |
0 |
383 | |
KABISURYANAGAR |
GUDIALI |
Ksn2021-Gudiali-Reno. & Imp. of Pata Mahi Bandha (2412013/WC/10465429) |
BP |
25/08/2022 |
801650.92 |
168652.73 |
802980 |
0 |
384 | |
KABISURYANAGAR |
GUDIALI |
Ksn2021-Gudiali-Reno. of new tank at adarshabidyalaya (2412013/WC/10465430) |
BP |
27/04/2022 |
801453.32 |
184812.87 |
859090 |
0 |
385 | |
KABISURYANAGAR |
JARADA |
KSN2021 JARADA TALIAMAPALLI CONST OF CHECKDAM NEAR DUNGI NALLAH (2412013/WC/10425827) |
BP |
26/04/2022 |
308361.8 |
157956.02 |
294000 |
61858 |
386 | |
KABISURYANAGAR |
NANDIAGADA |
KSN1819-Nandiagada-Nandiagada-Reno. & imp. of Puraparida Nalla at Nandiagada (2412013/WC/10331023) |
BP |
27/01/2023 |
350000 |
150000 |
102888 |
0 |
387 | |
KABISURYANAGAR |
NANDIAGADA |
KSN1819-N.gada-Edengapadar-Imp. & Reno. of Dandasi gadia khama nala (2412013/WC/10342198) |
BP |
24/04/2022 |
630000 |
70000 |
568560 |
0 |
388 | |
KABISURYANAGAR |
NANDIAGADA |
KSN1819-Nandiagada-E.Dengapadar-Reno.& Imp. of Nua bandha with steps (2412013/WC/10342205) |
BP |
27/01/2023 |
320000 |
280000 |
3900 |
0 |
389 | |
KABISURYANAGAR |
NANDIAGADA |
Ksn1920-Ngada-Hindala-Imp. of Kenal between Kania Nallah to Jajhangia at Hindala (2412013/WC/10401201) |
BP |
26/04/2022 |
451618.94 |
146383.77 |
278080 |
0 |
390 | |
KABISURYANAGAR |
NANDIAGADA |
Ksn1920-Ngada-Hindala-Imp. of kenal between Nua agula to sialia anicut at hindala (2412013/WC/10401202) |
BP |
26/04/2022 |
451618.94 |
146383.77 |
343320 |
0 |
391 | |
KABISURYANAGAR |
NANDIAGADA |
Ksn1920-Ngada-Hindala-Imp. of Canal between Jhagada Bandha to Kunda khai pahada (2412013/WC/10412661) |
BP |
26/04/2022 |
456654.48 |
113260.79 |
472690 |
0 |
392 | |
KABISURYANAGAR |
NANDIAGADA |
Ksn1920-Ngada-Hindala-Imp. of kenal between Jajhangia to Chingudia at Hindala (2412013/WC/10412662) |
BP |
26/04/2022 |
466297.15 |
106919.4 |
466540 |
0 |
393 | |
KABISURYANAGAR |
PAIKAJAMUNA |
KSN1920 PAIKAJAMUNA RENO AND IMP OF BABAJI BANDHA (2412013/WC/10402684) |
BP |
27/04/2022 |
525252.24 |
159401.63 |
328000 |
0 |
394 | |
KABISURYANAGAR |
PAIKAJAMUNA |
KSN2021 PAIKAJAMUNA RENO AND IMP OF JANULI GADIA BANDHA (2412013/WC/10467183) |
BP |
30/01/2023 |
812524.42 |
178202.36 |
776751 |
0 |
395 | |
KABISURYANAGAR |
PAIKAJAMUNA |
KSN2122PAIKAJAMUNA BANAPALLI RENO OF TANK BRAMHANA KHALIA BANDHA WITH GUARDWALL (2412013/WC/10479898) |
BP |
02/11/2022 |
804013.8 |
184278.66 |
802290 |
0 |
396 | |
KABISURYANAGAR |
RISHIPUR |
Ksn1920-Rishipur-Reno. & Imp. of Fula Marila Nalah (2412013/WC/10408259) |
BP |
22/08/2022 |
960666.85 |
37340.4 |
879338 |
0 |
397 | |
KABISURYANAGAR |
RISHIPUR |
KSN2122-RISHIPUR- RENO OF CHOTA AMBA GHAI AT-RISHIPUR (2412013/WC/10481856) |
BP |
30/01/2023 |
970190.42 |
14701.71 |
110720 |
0 |
398 | |
KABISURYANAGAR |
SIALIA |
KSN2020-21SIALIA GP RAMPUDI IMP OF KANDALA DANDA NALLAH (2412013/WC/10425480) |
BP |
30/01/2023 |
810281.8 |
169153.15 |
782885 |
0 |
399 | |
KABISURYANAGAR |
SIALIA |
KSN2020-21SIALIA GP K KHARIDA RENOAND IMP OF SUANSIA NALLAH (2412013/WC/10425486) |
BP |
25/08/2022 |
800723.87 |
185034.61 |
845220 |
0 |
400 | |
KABISURYANAGAR |
SUBALAYA |
KSN202021 SUBALAYA M.DIHASAHI RENO & IMP OF PURUNA BANDHA AT M.DIHA SAHI (2412013/WC/10453273) |
BP |
27/12/2022 |
831377.59 |
145881.31 |
622990 |
0 |
401 | |
KABISURYANAGAR |
SUBALAYA |
SUBALAYA - RENOAND IMP OF AMBA BNADHA (2412013/WC/10460411) |
BP |
05/09/2022 |
800082.91 |
176590.93 |
793715 |
0 |
402 | |
KABISURYANAGAR |
SUNARIJHOLA |
KSN1920SUNARIJHOLA IMP OF TALA NALA BANDHA (2412013/WC/10400741) |
BP |
26/04/2022 |
421197.83 |
167706.62 |
267440 |
0 |
403 | |
KABISURYANAGAR |
SUNARIJHOLA |
Ksn2021-Sjhola-S.Pankalabadi-Beautification Streghthening of Gudi Bandha at Sanapankalabadi (2412013/WC/10465160) |
BP |
02/11/2022 |
918344.7 |
79655.3 |
532270 |
0 |
404 | |
KHALLIKOTE |
CHIKILI |
Const of Amrit Sarovar at Chikili (2412014/WC/10578984) |
BP |
24/02/2023 |
1921750.75 |
62740.96 |
1915071 |
0 |
405 | |
KHALLIKOTE |
DANAPUR |
Reno of Sadan padia bandha at Danapur (2412014/WC/10460581) |
BP |
27/05/2022 |
702124.17 |
272051 |
691274 |
0 |
406 | |
KHALLIKOTE |
DANAPUR |
RENO OF ADIA BANDHA AT PHASIPADA (2412014/WC/10460589) |
BP |
02/11/2022 |
493663.18 |
183250.27 |
468421 |
164044 |
407 | |
KHALLIKOTE |
DANAPUR |
RENO OF KHARAKHARI CANAL KHANAN AT DEULAPALLI (2412014/WC/10460593) |
BP |
22/09/2022 |
852274.31 |
133459.37 |
436319 |
0 |
408 | |
KHALLIKOTE |
KANHEIPUR |
Const of Check Dam on Kakudia Nala at Kandigaon (2412014/WC/10404194) |
BP |
02/11/2022 |
147273.29 |
329844.53 |
148236 |
344365 |
409 | |
KHALLIKOTE |
TALAPADA |
Field bunding at Talapada (2412014/WC/10468320) |
BP |
24/01/2023 |
419382 |
79629 |
390844 |
0 |
410 | |
KHALLIKOTE |
BHAKUTAGAM |
Const of Check Dam at Banabila ghai Nala of Bakutgaon Village (2412014/WC/10480751) |
BP |
05/12/2022 |
115935.76 |
361183.29 |
122640 |
369939.2664 |
411 | |
KUKUDAKHANDI |
ANANTEI |
KKD/ANA/PS(20-21): CONST OF DRAIN FROM KALYAN MANDAP TO NELIA BANDHA (2412015/WC/10457710) |
BP |
05/09/2022 |
150321.34 |
310050.76 |
160839 |
309946.6222 |
412 | |
KUKUDAKHANDI |
ANANTEI |
KKD/ANA/PS(20-21): CONST OF DRAIN FROM KASIA DEULA SAHI TO GOUDA SAHI CHHAKA (2412015/WC/10457713) |
BP |
05/09/2022 |
212957 |
402447.39 |
155871 |
335811.7801 |
413 | |
KUKUDAKHANDI |
ANANTEI |
KKD/ANA/PS(20-21): CONST OF DRAIN AT BHAGABATI NAGAR ROAD (2412015/WC/10457716) |
BP |
26/01/2023 |
317791.68 |
418660.2 |
317184 |
437727.9968 |
414 | |
KUKUDAKHANDI |
ANKUSAPUR |
KKD/ANK/PS(20-21) CONST. OF DRAIN AT BRUNDABAN NAGAR (2412015/WC/10440386) |
BP |
20/08/2022 |
212588.59 |
440877.16 |
169740 |
473288.4113 |
415 | |
KUKUDAKHANDI |
ANKUSAPUR |
KKD/ANK/PS(20-21) COSNT. OF DRAIN AT DUDIGHARA TO 10No CANAL (2412015/WC/10441137) |
BP |
27/04/2022 |
153225.2 |
309494.42 |
100512 |
324270.0447 |
416 | |
KUKUDAKHANDI |
ANKUSAPUR |
KKD/ANK/PS(20-21) RENO OF BADA BANDHA (2412015/WC/10476644) |
BP |
02/11/2022 |
658901.88 |
133133.53 |
614169 |
16733 |
417 | |
KUKUDAKHANDI |
BANTHAPALLI |
KKD/BAN/PS(20-21): CONST OF DRAIN (BOTH SIDE) AT NUA SAHI ROAD (2412015/WC/10464653) |
BP |
05/09/2022 |
280218.33 |
562662.24 |
308938 |
505438 |
418 | |
KUKUDAKHANDI |
BANTHAPALLI |
KKD/BAN/PS(21-22): CONST OF STORM WATER DIVERTION FROM NUA BANDHA TO KANHEIKHARI BANDHA (2412015/WC/10529486) |
BP |
17/11/2022 |
306300.1 |
626109.33 |
301000 |
668710 |
419 | |
KUKUDAKHANDI |
BAULOJHOLI |
KKD/BAU/PS RENOV OF GAON BANDHA (2412015/WC/10422611) |
BP |
02/11/2022 |
801582.09 |
183885.64 |
803181 |
0 |
420 | |
KUKUDAKHANDI |
BORIGAM |
KKD/BOR/PS(20-21): CONST OF DRAIN FROM PANI GODAM TO CANAL (2412015/WC/10457484) |
BP |
17/11/2022 |
301458.61 |
633809.05 |
303669 |
661654.3958 |
421 | |
KUKUDAKHANDI |
BORIGAM |
KKD/BOR/PS(20-21):CONST OF DRAIN FROM RAJIB GANDHI SEBA KENDRA TO SHIB MANDIRA (2412015/WC/10457487) |
BP |
17/11/2022 |
150173.78 |
323467.73 |
151096 |
329809 |
422 | |
KUKUDAKHANDI |
BORIGAM |
KKD/BOR/PS(20-21):CONST OF DRAIN FROM BADA BANDHA TO UP SCHOOL (2412015/WC/10457488) |
BP |
27/04/2022 |
301458.61 |
633809.05 |
300150 |
689762 |
423 | |
KUKUDAKHANDI |
BORIGAM |
KKD/BOR/PS(21-22): CONST OF CULVERT AT 11 NO CANAL TO SWASAN ROAD (2412015/WC/10482779) |
BP |
17/11/2022 |
94007.92 |
380663.85 |
75035 |
361667 |
424 | |
KUKUDAKHANDI |
DENGAPODAR |
KKD/DEN/GP(21-22): CONST OF CULVERT AT BADHEI BANDHA TO SWASAN GHAT ROAD (2412015/WC/10477592) |
BP |
05/06/2022 |
147899.14 |
500955.83 |
116604 |
238967 |
425 | |
KUKUDAKHANDI |
GURUNTHI |
KKD/PS/GUR RENOV OF SINGHA BANDHA (2412015/WC/10421043) |
BP |
24/08/2022 |
836305.92 |
46694.14 |
824145 |
29336 |
426 | |
KUKUDAKHANDI |
GURUNTHI |
KKD/PS/GUR RENOV OF PURUSA BANDHA (2412015/WC/10421044) |
BP |
24/08/2022 |
697535.4 |
84558.43 |
691650 |
17914 |
427 | |
KUKUDAKHANDI |
GURUNTHI |
KKD/GUR/PS(20-21) RENO. OF IRRIGATION CANAL L N PUR TO BADA BANDHA 11 NO RC CANAL (2412015/WC/10446125) |
BP |
24/08/2022 |
130788.85 |
236699.66 |
130765 |
263838 |
428 | |
KUKUDAKHANDI |
GURUNTHI |
KKD/GUR/PS(20-21): RENO OF KHAJURIA BANDHA PHASE-2 AT JOGIAPALLI (2412015/WC/10456742) |
BP |
24/08/2022 |
745468.03 |
134006.77 |
730800 |
28054 |
429 | |
KUKUDAKHANDI |
GURUNTHI |
KKD/GUR/PS(20-21): CONST OF DRAIN FROM KALUA TEMPLE TO PWD ROAD AT L N PUR (2412015/WC/10459064) |
BP |
27/01/2023 |
286360.61 |
531513.03 |
168372 |
534249.0118 |
430 | |
KUKUDAKHANDI |
GURUNTHI |
KKD/GUR/PS(20-21): CONST OF DRAIN FROM ALEKHA TUNGI TO RC CANAL AT L N PUR (2412015/WC/10459066) |
BP |
27/01/2023 |
286360.61 |
531513.03 |
210060 |
505817.2313 |
431 | |
KUKUDAKHANDI |
GURUNTHI |
KKD/GUR/PS(20-21): RENO OF SAHANTANI BANDHA (2412015/WC/10460202) |
BP |
27/01/2023 |
647511.26 |
133026.99 |
621300 |
14196 |
432 | |
KUKUDAKHANDI |
GURUNTHI |
KKD/GUR/PS(20-21): RENO OF SANANTARA BANDHA (2412015/WC/10465299) |
BP |
27/01/2023 |
774280.41 |
114612.42 |
731380 |
17914 |
433 | |
KUKUDAKHANDI |
GURUNTHI |
KKD/GUR/PS/(21-22) RENO OF NALA FROM 11 NO. CANAL TO BALI MALA (2412015/WC/10479279) |
BP |
24/08/2022 |
915685.34 |
64314.67 |
915680 |
11830 |
434 | |
KUKUDAKHANDI |
HUGULAPATA |
KKD/HUG/PS(21-22): COMPLETION OF INCOMPLETE MODEL TANK OF RALAB BANDHA AT MARTHAPALLI (2412015/WC/10477800) |
BP |
25/08/2022 |
406766.62 |
524992.93 |
401592 |
571764 |
435 | |
KUKUDAKHANDI |
LATHI |
KKD/LAT/PS(20-21) DESLATIING OF NELLIA FROM DEULA BARIDGE TO TARMALA UTTAR PHASE 1 (2412015/WC/10459611) |
BP |
02/09/2022 |
803828.04 |
171194.24 |
741370 |
0 |
436 | |
KUKUDAKHANDI |
MOHADA |
KKD/MOH/PS(20-21): CONST OF DRAIN WITH CULVERT FROM PWD ROAD TO MAJHIBATA (2412015/WC/10459326) |
BP |
02/11/2022 |
320960.54 |
425936.25 |
195333 |
384565 |
437 | |
KUKUDAKHANDI |
MOHADA |
KKD/MOH/PS(20-21): CONST OF DRAIN FROM BURAGAM TO 10 NO CANAL (2412015/WC/10459329) |
BP |
20/08/2022 |
301458.61 |
633809.05 |
258750 |
695829.75 |
438 | |
KUKUDAKHANDI |
MOHADA |
KKD/MOH/PS(20-21): CONST OF DRAIN FROM TALA BURAGAM TO BHARADYUJA ASHRAM (2412015/WC/10459330) |
BP |
20/08/2022 |
300232.23 |
635726.56 |
310707 |
635473.8742 |
439 | |
KUKUDAKHANDI |
MOHADA |
KKD/MOH/PS(20-21): RENO OF PANDA BANDHA (2412015/WC/10459332) |
BP |
27/01/2023 |
656527.48 |
127639.97 |
188308 |
0 |
440 | |
KUKUDAKHANDI |
ROHIGAM |
KKD/ROH/PS RENOV OF KUMBHARA SAHI BANDHA AT ROHIGAM (2412015/WC/10401812) |
BP |
27/01/2023 |
653491.89 |
258738.37 |
22800 |
0 |
441 | |
PATRAPUR |
AMBAPUR |
PTR AMB K.BIJYAPUR RENO OF VILLAGE TANK (2412016/WC/10408168) |
BP |
03/09/2022 |
796264.69 |
181167 |
643810 |
163672 |
442 | |
PATRAPUR |
ANKULI |
Construction of stone bonding at Raikhalo (2412016/WC/10440688) |
BP |
25/08/2022 |
430000 |
50000 |
547900 |
0 |
443 | |
PATRAPUR |
ANKULI |
Construction of stone bonding at Khalasahi (2412016/WC/10440693) |
BP |
02/11/2022 |
270000 |
30000 |
271026 |
0 |
444 | |
PATRAPUR |
ANKULI |
Construction of Stone bonding at Lengenasahi (2412016/WC/10440707) |
BP |
02/11/2022 |
160000 |
20000 |
160300 |
0 |
445 | |
PATRAPUR |
ANKULI |
LBCD at Raikhalo (2412016/WC/10444379) |
BP |
02/11/2022 |
360000 |
40000 |
353500 |
0 |
446 | |
PATRAPUR |
ANKULI |
LBCD at jaliara (2412016/WC/10444388) |
BP |
02/11/2022 |
216000 |
24000 |
218000 |
0 |
447 | |
PATRAPUR |
ANKULI |
Stone bonding at Gokhanasahi 2021 (2412016/WC/10481290) |
BP |
10/05/2022 |
216000 |
24000 |
284255.46 |
0 |
448 | |
PATRAPUR |
BURATALA |
Const of stone bonding at Kuruguda (2412016/WC/10440713) |
BP |
02/11/2022 |
160000 |
20000 |
161570 |
0 |
449 | |
PATRAPUR |
BURATALA |
Check dam at pani billa (2412016/WC/10444398) |
BP |
15/04/2022 |
100000 |
400000 |
112440 |
390000 |
450 | |
PATRAPUR |
KHAMARIGAM |
PTR KHAM KHAM RENO OF RAIGUNDAM BANDHA AT KHAMARIGAM (2412016/WC/10412083) |
BP |
02/11/2022 |
801103.45 |
186772.66 |
712400 |
0 |
451 | |
PATRAPUR |
KHARANIPADA |
PTR KHARANI GOTHAGAM RENO OF DHOBA BANDHA (2412016/WC/10408256) |
BP |
30/01/2023 |
810794.81 |
173886.55 |
807962 |
0 |
452 | |
PATRAPUR |
TANDIPUR |
TAN TAN CONST OF CHECK DAM AT KHAMARA NALA (2412016/WC/10426362) |
BP |
01/02/2023 |
122188.32 |
363156.07 |
76664 |
0 |
453 | |
PATRAPUR |
TANDIPUR |
TAN POL CONST OF CHECK DAM AT CHOUDHURY NALA L 7430 SL 110 (2412016/WC/10461706) |
BP |
02/11/2022 |
121104.54 |
363903.98 |
127106 |
263167.44 |
454 | |
PATRAPUR |
SURANGI |
SUR THA CONST OF CHECK DAM AT TALA GUDI PAHADA NALO L 7430 SL 107 (2412016/WC/10427181) |
BP |
04/09/2022 |
121203.9 |
363337.48 |
113121 |
328610 |
455 | |
PATRAPUR |
SURANGI |
SUR KES CONST OF CHECK DAM AT ALATA AMBA NALA L 7430 SL 84 (2412016/WC/10428219) |
BP |
04/09/2022 |
121715.04 |
360297.82 |
96669 |
249957 |
456 | |
PATRAPUR |
SURANGI |
SUR SB CONST OF CHECK DAM AT SASAN NALA L 7430 SL 91 (2412016/WC/10448362) |
BP |
04/09/2022 |
121203.9 |
363972.87 |
124939 |
327353 |
457 | |
POLOSARA |
BADAPANKALABADI |
PA-19/20-BPB-IMPVT OF NALA BETWEEN P NUA GAON GUDIBADIA TO NADI (2412017/WC/10412351) |
BP |
29/08/2022 |
445222.48 |
32000.85 |
452184 |
30140 |
458 | |
POLOSARA |
BADAPANKALABADI |
PS 20/21-LNO-7898 DT-05/06/2020 Const. ofChech dam goudajhola danda (2412017/WC/10426039) |
BP |
02/11/2022 |
171630.2 |
242240.69 |
159800 |
242185 |
459 | |
POLOSARA |
BANTHAPALLI |
PS-BAN/LN-7923/DT-05/06/2020 MODEL POND OF SCHOOL PAKHA BANDHA (2412017/WC/10427116) |
BP |
29/08/2022 |
246049.16 |
480436.94 |
247076 |
502884 |
460 | |
POLOSARA |
BANTHAPALLI |
PS/BAN-LN-7923DT/05/06/2020 MODEL POND OF KANSARI BANDHA (2412017/WC/10427117) |
BP |
02/11/2022 |
300346.4 |
474913.77 |
306060 |
474000 |
461 | |
POLOSARA |
BANTHAPALLI |
PS-Ban-Ltr no-888 slno-1 DT20/01 imp,ofsalap nallah (2412017/WC/10466008) |
BP |
02/11/2022 |
514979.82 |
259962.98 |
461253 |
272130 |
462 | |
POLOSARA |
BARTANI |
BARTANI 2021-7923/05.06.2020 MODEL POND OF PILI BANDHA AT JHITIKABADI (2412017/WC/10436453) |
BP |
01/07/2022 |
213957.56 |
411565.24 |
222198 |
501546 |
463 | |
POLOSARA |
BARTANI |
BARTANI 2021-7925/05.06.2020 RENO OF DALUA GHAI (2412017/WC/10436454) |
BP |
02/11/2022 |
410242.38 |
86309.55 |
409488 |
83916 |
464 | |
POLOSARA |
BARTANI |
BARTANI 2021-7925/05.06.2020 RENO OF BADA BANDHA TO PILI BANDHA CANAL FOR AGRICULTURE PURPOSE (2412017/WC/10436456) |
BP |
02/11/2022 |
405104.66 |
92967.96 |
406494 |
87506 |
465 | |
POLOSARA |
BARTANI |
PS BAR AP LNO 7925 DT 05 06 2020 SI NO 24 RENO OF KHAMA NALA (2412017/WC/10459819) |
BP |
02/11/2022 |
375821.93 |
118428.83 |
412965 |
83151 |
466 | |
POLOSARA |
BARTANI |
Ps bar lno 7997 dt 27/07/21 digging of contour trench at the base of sulia pahada si no 5 (2412017/WC/10503035) |
BP |
05/02/2023 |
885301.2 |
84698.8 |
622540 |
13272 |
467 | |
POLOSARA |
BARTANI |
Ps bar lno 7997 dt 27/07/21 digging of contour trench at the base of budhimala pahada si no 8 (2412017/WC/10503036) |
BP |
01/09/2022 |
885301.2 |
84698.8 |
838900 |
23226 |
468 | |
POLOSARA |
BELAGAM |
PS-2176-CD-BEL-2017-18/CONST. OF CHECK DAM AT KHAJURIA NALA (2412017/WC/10329409) |
BP |
08/07/2022 |
250000 |
200000 |
188638 |
154127 |
469 | |
POLOSARA |
BELAGAM |
CONST.OF FIELDCHANNEL AT DANDAGHAI NALA FOR AGRICULTUR PURPOSE1856/14/02/20 (2412017/WC/10410393) |
BP |
27/07/2022 |
324809.85 |
248534.69 |
333891 |
294202 |
470 | |
POLOSARA |
BELAGAM |
PS-BEL-LNO-7909,DT-05/06/2020,SLNO-17 IMP OF NALLAH FROM PANDUANI PAHARA TO THAKURANI MANDIRA (2412017/WC/10449606) |
BP |
27/04/2022 |
600345.77 |
272308.22 |
610273 |
279586 |
471 | |
POLOSARA |
BELAGAM |
PS-BEL-LNO-7898,DT-05/06/2020,SLNO-08 CONST OF CHECKDAM OF SUNARUPA NALA (2412017/WC/10454897) |
BP |
22/08/2022 |
131920.03 |
292113.31 |
146349 |
365588 |
472 | |
POLOSARA |
BELAGAM |
PS-BEL-LNO-7898,DT-05/06/2020,SLNO-09 CONST OF CHECKDAM AT BEDHA NALA (2412017/WC/10454898) |
BP |
27/07/2022 |
131042.23 |
292104.53 |
154008 |
341790 |
473 | |
POLOSARA |
BHABARADA |
PS-BH(LNo-6825 Dt-23.06.2021 SlNo-6)Digging of Contour Trench at the base of Bhalu Dimbiria Hill (2412017/WC/10490084) |
BP |
04/04/2022 |
935046.7 |
45603.31 |
721827 |
0 |
474 | |
POLOSARA |
BHABARADA |
PS-BH(LNo-6825 Dt-23.06.2021 SlNo-8)Digging of Contour Trench at the base of the Mahulia Pahad (2412017/WC/10490101) |
BP |
30/07/2022 |
935046.7 |
45603.31 |
825649 |
34335 |
475 | |
POLOSARA |
BHABARADA |
PS-Ren. of Khadala Chhaka Bandha at Luniapada (2412017/WC/1366057) |
BP |
27/04/2022 |
200000 |
50000 |
177798 |
1020 |
476 | |
POLOSARA |
BUDHEISUNI |
PS-(17-18-CD)Const.of Check dam with Guard Wall at Dhaudia Nala (2412017/WC/10328983) |
BP |
30/01/2023 |
100000 |
400000 |
7040 |
0 |
477 | |
POLOSARA |
BUDHEISUNI |
PS BUD LNO-6835 DT 23/06/21 SL NO-100 CONST &IMP OF NALLAH FROM DHOBA GHAI TO BALI TOTA OF BUDHEISUN (2412017/WC/10492867) |
BP |
22/08/2022 |
400318.95 |
86625.91 |
399118 |
98208 |
478 | |
POLOSARA |
CHIRIKIPADASASAN |
PS-CHS.BIRPUR(L.No-1896/14/02/2020) RENOV.AND GUARDWALL AT SANITOTA NALA (2412017/WC/10421768) |
BP |
15/12/2022 |
302767.4 |
152247.21 |
70560 |
146357.43 |
479 | |
POLOSARA |
DHUNKAPADA |
PS-DKP/CANAL LNO7925 DT.05.06.20-IMPROV. OF BAGHUA CANAL FROM DUAN GHAI TO KANIAPALLI (2412017/WC/10438315) |
BP |
25/08/2022 |
375821.93 |
120417.86 |
381912 |
4056 |
480 | |
POLOSARA |
DHUNKAPADA |
PS-DKP/TREN/LNO.6825,DT.23.06.21,SNO.10-DIGGING OF CONTOUR TRENCH AT THE BASE OF THE DUANA PAHADA (2412017/WC/10493263) |
BP |
05/01/2023 |
881085.48 |
93914.44 |
796900 |
0 |
481 | |
POLOSARA |
DHUNKAPADA |
PS-DKP/TREN/LNO.6825,DT.23.06.21,SNO.12-DIGGING OF CONTOUR TRENCH AT THE BASE OF THE MAJHI MUNDIA (2412017/WC/10493265) |
BP |
05/01/2023 |
881085.48 |
93914.44 |
782060 |
0 |
482 | |
POLOSARA |
GHODAPALANA |
PS-GHO-WB-20-21-7909-05/06/2020-IMPVT OF NALLAH AT TULASI KHAMA NALA (2412017/WC/10431049) |
BP |
03/09/2022 |
337645.98 |
149311.55 |
349080 |
136791 |
483 | |
POLOSARA |
GHODAPALANA |
PS-GHO-WB-20-21-7925-05-06-2020-RENOVATION OF RAMA SAGAR TANK AT GHODAPALAN (2412017/WC/10431055) |
BP |
02/11/2022 |
404299.62 |
89076.6 |
414168 |
92737 |
484 | |
POLOSARA |
GHODAPALANA |
PS-GHO-CD-20-21-7898-05-06-2020-CONST. OF CHEAK DAM AT KHAJURIA NALA NEAR BADA SANKSHA (2412017/WC/10431352) |
BP |
03/09/2022 |
167745.11 |
261382.51 |
163206 |
261382 |
485 | |
POLOSARA |
GHODAPALANA |
PS-GHO-CD-20-21-7898-05-06-2020-CONST. OF CHEAK DAM AT GUNDA MUHA NALA AT KARATALI (2412017/WC/10431353) |
BP |
03/09/2022 |
172701.25 |
256233.65 |
189606 |
256200 |
486 | |
POLOSARA |
GHODAPALANA |
PS-CD-GHO-20-21-L.NO-882-20-01-2021-CONST OF CHEAK DAM DIGALA NALA FOR AGRICULTURE PURPOSE (2412017/WC/10461841) |
BP |
11/11/2022 |
259987.9 |
509616.37 |
186156 |
508556 |
487 | |
POLOSARA |
GOCHABADI |
PS-CD-GHO(9221-10.10.2019) Construcction of Check Dam At-Bhaliamala Nala At-Bhaliamala (2412017/WC/10399400) |
BP |
15/05/2022 |
200896.53 |
275058.01 |
228321 |
265284 |
488 | |
POLOSARA |
GOCHABADI |
PS-CD-GOCH(1852/14.02.2020)Construction of Check Dam At-Chanchera Nalla (2412017/WC/10411594) |
BP |
25/08/2022 |
197037.81 |
267978.46 |
187359 |
278094 |
489 | |
POLOSARA |
HATIOTA |
PS-HAT-WC-20-21-7923-05-06-2020-MODEL TANK OF DIGOCHHIA TANK (2412017/WC/10427478) |
BP |
27/08/2022 |
239281.83 |
412219.41 |
241740 |
503060 |
490 | |
POLOSARA |
HATIOTA |
PS-HAT-WH-21-22-L.NO-6825-DT-23-06-2021-SL.NO-14-DIGGING OF CONTOUR TRENCH AT THE BASE OF THE SITABA (2412017/WC/10492780) |
BP |
27/08/2022 |
872654.04 |
107727.12 |
902680 |
6422 |
491 | |
POLOSARA |
HATIOTA |
PS-HAT-WH-21-22-L.NO-6825-DT-23-06-2021-SL.NO-16-DIGGING OF CONTOUR TRENCH AT THE BASE OF THE BAUTI (2412017/WC/10492784) |
BP |
27/08/2022 |
872654.04 |
98727.12 |
939110 |
6084 |
492 | |
POLOSARA |
J.DENGAPADAR |
PS-20-21-JDP-7919/05.06.20-const of inlet and outlet at bhuyan bandha (2412017/WC/10439388) |
BP |
29/03/2023 |
201352.71 |
270543.37 |
212400 |
286959 |
493 | |
POLOSARA |
J.DENGAPADAR |
PS-JDP-DCT-21-22( LN-6825 D 23.06.21 SLN-19) DIGGING OF CONTOUR TRENCH AT THE BASE OF THE MATIGADIA (2412017/WC/10493370) |
BP |
25/11/2022 |
881085.48 |
98811.44 |
869950 |
0 |
494 | |
POLOSARA |
J.DENGAPADAR |
PS-JDP-DCT-21-22( LN 6825 D 23.06.21 SN 22)DIGGING OF CONTOUR TRENCH AT THE BASE OF THE SAMANTARAKH (2412017/WC/10493374) |
BP |
01/11/2022 |
881085.48 |
98811.44 |
875110 |
12168 |
495 | |
POLOSARA |
JAKARA |
PS/WC/JAK Renov. of budhi maa bandha at jenapur (2412017/WC/10450828) |
BP |
30/01/2023 |
402343.57 |
91945.69 |
308488 |
23660 |
496 | |
POLOSARA |
JAKARA |
PS/WC/JAK Renov. of nala from benusagar to thakueani at jenapur (2412017/WC/10450829) |
BP |
21/06/2022 |
402343.57 |
91945.69 |
396240 |
23660 |
497 | |
POLOSARA |
JAKARA |
PS-JAK-WC/7925/05/06/2020/RENOV. OF DALEI AUGULA AT JAKAR (2412017/WC/10452312) |
BP |
21/06/2022 |
405940.21 |
85843.04 |
400040 |
0 |
498 | |
POLOSARA |
JAKARA |
PS-JAK-WC/7925/05/06/2020/RENOV. OF HARIHARA AUGULA AT JAKAR (2412017/WC/10452314) |
BP |
25/06/2022 |
407249.48 |
84334.41 |
439623 |
0 |
499 | |
POLOSARA |
JAKARA |
PS-JAK-(7925/05.06.2020) RENOV OF MANIA GHAI AT JAKARA (2412017/WC/10469059) |
BP |
04/09/2022 |
422250.54 |
73664.42 |
419400 |
6422 |
500 | |
POLOSARA |
JAKARA |
PS-JAK-LN-6825 Dt-23/06/2021 CONST.OF DIGGING OF CONTOUR TREANCH AT THE BASE OF SUNDURIAKANA PAHAD (2412017/WC/10493586) |
BP |
30/01/2023 |
881085.48 |
98811.44 |
846762 |
25012 |
501 | |
POLOSARA |
KALAMBA |
PS/2020-21/CD/7898/05-06-2020/CONST OF CHECK DAM AT BADA SAHI WEST SIDE NALA (2412017/WC/10426707) |
BP |
30/01/2023 |
126226.9 |
293540.21 |
94806 |
0 |
502 | |
POLOSARA |
KALAMBA |
PS/2020-21/CD/7898/05-06-2020/CONST OF CHECK DAM AT SAPNESWARA MANDIRA NALA (2412017/WC/10426708) |
BP |
30/01/2023 |
128025.22 |
299132.52 |
132687 |
0 |
503 | |
POLOSARA |
KALAMBA |
PS/2020-21/FC/7909/05-06-2020/IMP.OF NALLAH AT RANI BATI SAGAD CENAL (2412017/WC/10426714) |
BP |
24/07/2022 |
337645.98 |
140091.33 |
336582 |
0 |
504 | |
POLOSARA |
KALAMBA |
PS/2020-21/KAL/888.DT.20-01-21/SL12/IMP WITH GUARDWALL OF NALLAH FROM RD(RI) OFFICE TO HARIJAN SAHI (2412017/WC/10461428) |
BP |
25/04/2022 |
768318.9 |
27684.84 |
739540 |
4732 |
505 | |
POLOSARA |
KALAMBA |
PS/20-21/888(20-01-21SL.13/IMP.OF EARTHEN DRAIN RUKHAKANA JARIMALA SAHI CANALTO PATANA AWC BULDING (2412017/WC/10461429) |
BP |
25/04/2022 |
769708.53 |
27698.74 |
580080 |
0 |
506 | |
POLOSARA |
KENDUBADI |
PS-1854-14.02.20 CONST OF INLET & OUTLET LOHARA GHAI (2412017/WC/10411944) |
BP |
02/09/2022 |
281246.84 |
371060.72 |
303056 |
388890 |
507 | |
POLOSARA |
MADHUPALLI |
PS/MAD/LN NO-7925/DT-05/06/2020 SL NO-167(RENOVATION OF NALA FROM BHARAT AGULA NALA TO GUDI BANDHA) (2412017/WC/10454054) |
BP |
04/09/2022 |
401803.3 |
83202.56 |
407880 |
83202 |
508 | |
POLOSARA |
MADHUPALLI |
PS/MAD/LN NO-7898/DT/05/06/2020 SL NO-48(CONST OF CHECK DAM AT NADINIA NALA (2412017/WC/10454062) |
BP |
31/03/2023 |
102215.68 |
365209.28 |
94392 |
365200 |
509 | |
POLOSARA |
MADHUPALLI |
PS/MAD/LN NO-7898/DT-05/06/2020/SL NO-51(CONST OF CHECK DAM AT DUDHHI GHAI NALA) (2412017/WC/10454066) |
BP |
29/12/2022 |
122402.79 |
300672.36 |
114660 |
368952 |
510 | |
POLOSARA |
MADHUPALLI |
PS/MAD/LN NO-7898/DT-05/06/2020/SL NO-54(CONST OF CHECK DAM AT GADAGADIA NALA (2412017/WC/10454071) |
BP |
26/08/2022 |
122402.79 |
296200.01 |
111072 |
347228 |
511 | |
POLOSARA |
MADHUPALLI |
PS/MAD/LN-888/DT-20/01/2021/SL NO-15(IMP OF NALLAH BETWEEN BANADURGA TO TANGIRI NALLAH (2412017/WC/10466902) |
BP |
31/03/2023 |
490041.84 |
266057.53 |
490334 |
272110 |
512 | |
POLOSARA |
MALATENTULIA |
Ps mal L no7898 Dt05/06/2020 const. of check Dam at smasan bandha Nala (2412017/WC/10427400) |
BP |
26/08/2022 |
172225.15 |
256714.4 |
169389 |
317178 |
513 | |
POLOSARA |
MALATENTULIA |
ps mal-Lno 7898 Dt 05/06/2020 const. of check Dam at chancehera Nala (2412017/WC/10427402) |
BP |
01/01/2023 |
172701.25 |
250777.49 |
164522 |
262607 |
514 | |
POLOSARA |
MALATENTULIA |
ps mal L no 7898 Dt 05/06/2020 const. of check Dam at dhoba bagad Nala (2412017/WC/10427404) |
BP |
26/08/2022 |
172225.15 |
256714.4 |
177472 |
312739 |
515 | |
POLOSARA |
MALATENTULIA |
PS MAL LNO 7898 DT 05 06 2020 CONT OF CHECKDAM AT RAMABAGAD NALA SI NO 45 (2412017/WC/10446724) |
BP |
01/01/2023 |
188544.4 |
227282.29 |
204516 |
258017 |
516 | |
POLOSARA |
MALATENTULIA |
PS MAL APLNO 7898 DT 05 06 2020 CONT OF CHECKDAM AT RAMABAGADA NALA (2412017/WC/10451793) |
BP |
05/09/2022 |
174512.39 |
245038.34 |
176778 |
278124 |
517 | |
POLOSARA |
MALATENTULIA |
PS-888/20/01/21 S L NO 20 Renov. and Imp of Gambharia Nallah (2412017/WC/10467600) |
BP |
01/11/2022 |
357279.3 |
36468.92 |
279036 |
0 |
518 | |
POLOSARA |
MALATENTULIA |
PS-888/20/01/21 S L NO 31 Imp of Nallah between Gopia palli toGudidumaa Nallah (2412017/WC/10467606) |
BP |
26/08/2022 |
426206.71 |
66434.79 |
286695 |
4732 |
519 | |
POLOSARA |
MANDAR |
Latter no-7925 Date-05/06/2020 Renov of Baghuajhola ghai (2412017/WC/10427092) |
BP |
20/12/2022 |
463545.42 |
29636.44 |
458530 |
14196 |
520 | |
POLOSARA |
MANDAR |
PS-MAN-20-21(LN 6825 / 23.06.21 SLN 44 ) DIGGING OF CONTOR TRENCH AT FROM CHHAGHARIA TOTA TO GOUR (2412017/WC/10508820) |
BP |
02/01/2023 |
876869.76 |
105769.28 |
862247.4 |
0 |
521 | |
POLOSARA |
MANDAR |
PS-MAN-20-21(LN6825/23.06.21 SLN46) DIGGING OF CONTOUR TRENCH AT THE BASE OF THE OF KUSUMA BAGADA (2412017/WC/10508821) |
BP |
22/11/2022 |
876869.76 |
105769.28 |
873582.9 |
0 |
522 | |
POLOSARA |
MATHURA |
PS-Apl-868.dt-20/01/2021.sno-5.Const of inlet & oulet of marda nua bandha. (2412017/WC/10463701) |
BP |
20/01/2023 |
396926.55 |
383648.43 |
389436 |
399872 |
523 | |
POLOSARA |
MATHURA |
Ps-mat-apl-882.dt-20-01-2021.sno-27.Const of check dam at hatibadi nalah. (2412017/WC/10470033) |
BP |
04/09/2022 |
246071.8 |
427412.65 |
213768 |
447615 |
524 | |
POLOSARA |
MATHURA |
Ps-mat-lno-6825.dt-23-06-2021.sno-48.Const of Contour trench at the base of the hatibadi pahad (2412017/WC/10493720) |
BP |
20/01/2023 |
881085.48 |
98811.44 |
872727 |
19908 |
525 | |
POLOSARA |
MATHURA |
ps-mat-lno-6825.dt-23-06-2021.Digging of contour trench at the base of the tangini khola pahad (2412017/WC/10493721) |
BP |
20/01/2023 |
881085.48 |
98811.44 |
871846 |
0 |
526 | |
POLOSARA |
NIMINA |
PS-19-20-NIM-Const of checkdam at Bileijhuri ganga sagar nala (2412017/WC/10400370) |
BP |
01/02/2023 |
101345.39 |
342019.35 |
101520 |
376701 |
527 | |
POLOSARA |
NIMINA |
PS-19-20-NIM-Const of check dam at baripata nala (2412017/WC/10400373) |
BP |
26/08/2022 |
101345.39 |
342019.35 |
104904 |
368652 |
528 | |
POLOSARA |
PANDIRIPADA |
PS-PAN LN882/20.01.21SL32)CONS OF CHECKDAM ON VILLAGE NALLAH INFRONT OF DHANEI TOWER NEAR SINGHASANI (2412017/WC/10467507) |
BP |
16/06/2022 |
257769.68 |
509048.26 |
275103 |
499350 |
529 | |
POLOSARA |
RUMAGADA |
PS- RUM20/21 L-7886,05.06.20(FARMPOND OF PRAKASH MAHARANA S/O-LOKANATH (2412017/WC/10433452) |
BP |
25/05/2022 |
131370.79 |
33839.23 |
135200 |
0 |
530 | |
POLOSARA |
RUMAGADA |
PS-RUM20/21 L-7886,D-05.06.209(FARMPOND OF PURANACHANDRA KHATUA S/O-RADHAMOHAN (2412017/WC/10433454) |
BP |
27/04/2022 |
129330.9 |
35488.7 |
134200 |
0 |
531 | |
POLOSARA |
SODAKA |
PS-SOD-2020-021(7919/05/06//2020)CONST OF OUT LET AT GOUDA BANDHA (2412017/WC/10427856) |
BP |
02/11/2022 |
201652.58 |
263493.57 |
213540 |
279603 |
532 | |
PURUSHOTTAMPUR |
ACHULI |
RENOVATION OF CANAL FROM MENDHAPALLI TO GOTHIALLI (2412018/WC/10431737) |
BP |
25/05/2022 |
807188.78 |
174872.08 |
808454 |
16562 |
533 | |
PURUSHOTTAMPUR |
BAGHALA |
19-20/BAGHALA/BEAUTIFICATION TANK CHARIKANIA BANDHA STEPS AT ANGU VILLAGE. (2412018/WC/10403116) |
BP |
02/11/2022 |
800604.04 |
165549.16 |
431046 |
0 |
534 | |
PURUSHOTTAMPUR |
RAIPUR |
REOVATIO OF BERANDI BANDHA (2412018/WC/10471853) |
BP |
25/05/2022 |
808337.37 |
182841.61 |
705880 |
0 |
535 | |
PURUSHOTTAMPUR |
SIKULA |
BEAUTIFICATION OF BARA BANDH AT SIKULA (2412018/WC/10467403) |
BP |
02/11/2022 |
401916.09 |
544518.66 |
546495 |
348926 |
536 | |
RANGEILUNDA |
DURA |
Renovation of Badhi bandha at dura gp (2412019/WC/10427659) |
BP |
25/05/2022 |
601083.13 |
371240.13 |
606732 |
38024 |
537 | |
RANGEILUNDA |
DURA |
Model tank of muktaswara bandha dura gp (2412019/WC/10430652) |
BP |
25/05/2022 |
260062.47 |
645648.92 |
266500 |
616303.0119 |
538 | |
RANGEILUNDA |
INDRAKHI |
Renovation of Bali Bila Nala at Indrakhi (2412019/WC/10401182) |
BP |
31/03/2023 |
800640.35 |
185463.09 |
232320 |
23660 |
539 | |
RANGEILUNDA |
INDRAKHI |
Renovation of Baidyaraj Mandira Bandha Hantulu (2412019/WC/10407098) |
BP |
05/08/2022 |
707414.53 |
260962.03 |
286310 |
8960 |
540 | |
RANGEILUNDA |
INDRAKHI |
IMP $ STRENGTHING OF MASANI BANDHA AT R.TULU (2412019/WC/10425896) |
BP |
31/03/2023 |
230296.83 |
688460.71 |
138420 |
18928 |
541 | |
RANGEILUNDA |
INDRAKHI |
RENOVATION OF ONKA GODIYA BANDHA AT R.TULU (2412019/WC/10454141) |
BP |
31/03/2023 |
621140.99 |
309643.75 |
172180 |
18928 |
542 | |
RANGEILUNDA |
KARAPALLI |
Renovation of singari bandha at karapalli gp (2412019/WC/10427715) |
BP |
26/08/2022 |
601083.13 |
371240.13 |
604295 |
199399.6319 |
543 | |
RANGEILUNDA |
KOLATHIGAM |
Renovation of Paliasahi Ghai Bandha at Daspur (2412019/WC/10446093) |
BP |
16/04/2022 |
649481.05 |
303811.29 |
634200 |
176996.7816 |
544 | |
RANGEILUNDA |
KOLATHIGAM |
Renovation of Paliasahi Masani Bandha at Daspur (2412019/WC/10465485) |
BP |
16/04/2022 |
649868.56 |
308996.61 |
601650 |
211549.1572 |
545 | |
RANGEILUNDA |
LUHAJHAR |
Renovation of Gouda bandha. (2412019/WC/10446890) |
BP |
16/04/2022 |
600282.17 |
352406.4 |
577805 |
299925.3094 |
546 | |
RANGEILUNDA |
PADMAPUR |
RENO OF NUA BANDHA AT MAJHIGAON (2412019/WC/10428540) |
BP |
19/02/2023 |
745617.62 |
197030.5 |
542924 |
204029.3972 |
547 | |
RANGEILUNDA |
PADMAPUR |
RENO OF IAY COLONY TANK AT MAJHIGAON SL NO-46 (2412019/WC/10444011) |
BP |
27/04/2022 |
648079.13 |
323645.7 |
682134 |
42777 |
548 | |
RANGEILUNDA |
PADMAPUR |
Renovation of Pahadia Bandha at Kaithapalli SL NO-48 (2412019/WC/10444012) |
BP |
27/04/2022 |
581229.85 |
386209.47 |
603718 |
37968 |
549 | |
RANGEILUNDA |
RANDHA |
Construction of Canal from Dian to Mukteswar Mandir at Randha . (2412019/WC/10468237) |
BP |
27/08/2022 |
834830.13 |
156026.04 |
852203 |
80756 |
550 | |
RANGEILUNDA |
RANDHA |
Construction of Canal from Dian to Lunda Nala at Randha (2412019/WC/10468238) |
BP |
27/08/2022 |
834830.13 |
156026.04 |
777379 |
78615.7 |
551 | |
RANGEILUNDA |
RANDHA |
Construction of Canal from Chandapur Dian to Bada Sanka at Randha . (2412019/WC/10468239) |
BP |
27/08/2022 |
834830.13 |
156026.04 |
793187 |
29512 |
552 | |
RANGEILUNDA |
RANDHA |
Construction of Canal from Radha Hotel to Ambaghai at Randha . (2412019/WC/10468240) |
BP |
27/04/2022 |
834830.13 |
156026.04 |
506904 |
29512 |
553 | |
RANGEILUNDA |
RANDHA |
Renovation of Canal from Telo Dhimira to Nandi Mohanty Beda at Randha . (2412019/WC/10480968) |
BP |
27/08/2022 |
748409.34 |
230144.19 |
567785 |
16507 |
554 | |
RANGEILUNDA |
RANDHA |
Renovation of Kalinga Nala at Randha (2412019/WC/10480975) |
BP |
27/08/2022 |
748409.34 |
230144.19 |
597346 |
25823 |
555 | |
RANGEILUNDA |
SATAKUTUNI |
Renovation of sari bandha at satakutuni gp (2412019/WC/10427719) |
BP |
20/03/2023 |
601083.13 |
370158.07 |
615900 |
121008.9842 |
556 | |
RANGEILUNDA |
MENDRAJPUR |
Renovation of Chinta Bandha at Mendrajpur (2412019/WC/10395121) |
BP |
27/04/2022 |
710910.36 |
267794.02 |
604035 |
287114.2 |
557 | |
RANGEILUNDA |
MENDRAJPUR |
Beautification of ODRP Colony bali Bandha (2412019/WC/10450440) |
BP |
11/05/2022 |
370969.28 |
566565.62 |
167280 |
437234.74 |
558 | |
RANGEILUNDA |
LAUDIGAM |
DIGGING OF NEW BANDHA AT GARAMPETA (2412019/WC/10459717) |
BP |
27/04/2022 |
756417 |
172635.37 |
397102.34 |
0 |
559 | |
RANGEILUNDA |
MARKANDI |
Renovation of Nulia Sahi Smasan Tank (2412019/WC/10440378) |
BP |
16/04/2022 |
625366.21 |
361264.84 |
519230 |
9100 |
560 | |
RANGEILUNDA |
MARKANDI |
Renovation of Pokoladu Bandha (2412019/WC/10440379) |
BP |
16/04/2022 |
625366.21 |
361264.84 |
600860 |
0 |
561 | |
SANAKHEMUNDI |
CHUDANGAPUR |
BEAUTIFICATION TANK OF CHINTAKHALI SATI BANDHA MODEL TANK (2412020/WC/10399173) |
BP |
05/09/2022 |
300999.44 |
594399.44 |
287173 |
630601.8184 |
562 | |
SANAKHEMUNDI |
CHUDANGAPUR |
MODEL TANK OF HATAPADA (2412020/WC/10452974) |
BP |
05/09/2022 |
265209.96 |
641610.76 |
271144 |
656958.3941 |
563 | |
SANAKHEMUNDI |
GOUTAMI |
RENOVATION OF KUMIUTIGHAI S AMBATHA (2412020/WC/10424400) |
BP |
03/11/2022 |
350994.61 |
139065.36 |
324870 |
10140 |
564 | |
SANAKHEMUNDI |
PATAPUR |
MODEL TANK OF BADA BANDHA NEAR SANTOSHI MANDIRA (2412020/WC/10445226) |
BP |
05/09/2022 |
268359.1 |
637803.84 |
275540 |
527772.2523 |
565 | |
SANAKHEMUNDI |
PATAPUR |
RENOVATION OF KHARI NAL ALONG WITH GUARDWALL NEAR KEUTA GANDA (2412020/WC/10482451) |
BP |
15/12/2022 |
227288.19 |
535061.06 |
219520 |
509068.3188 |
566 | |
SANAKHEMUNDI |
PATTIGUDA |
CHECK DAM AT KESABA NALA-I (LOWER END), PATTIGUDA (2020-21) (2412020/WC/10438117) |
BP |
21/08/2022 |
119025 |
334975 |
118978 |
314912 |
567 | |
SANAKHEMUNDI |
PATTIGUDA |
CHECK DAM AT KESABA NALA-II (UPPER END), PATTIGUDA (2020-21) (2412020/WC/10438119) |
BP |
21/08/2022 |
119025 |
334975 |
118197 |
314912 |
568 | |
SANAKHEMUNDI |
PATTIGUDA |
CHECK DAM AT GHORANA CHANCHADA NALA, RATHAPUR (2020-21) (2412020/WC/10438120) |
BP |
21/08/2022 |
119025 |
334975 |
117783 |
314912 |
569 | |
SANAKHEMUNDI |
PATTIGUDA |
FEEDER CHANNEL FROM SUBSTATION TO SARDAR BILA, PATTIGUDA (2020-21) (2412020/WC/10449910) |
BP |
21/08/2022 |
189819 |
564181 |
188163 |
531954 |
570 | |
SANAKHEMUNDI |
PATTIGUDA |
FEEDER CHANNEL AT GUDIA BATA BANDHA TO GOUDA BILA, KESAPUR (2020-21) (2412020/WC/10453369) |
BP |
09/09/2022 |
246330 |
732670 |
241547 |
687753 |
571 | |
SANAKHEMUNDI |
PATTIGUDA |
LBCD AT GHORANA CHANCHADA NALA, RATHAPUR (20/2020-21) (2412020/WC/10466709) |
BP |
27/08/2022 |
19044 |
85956 |
19044 |
77396 |
572 | |
SANAKHEMUNDI |
PODAMARI |
MODEL TANK OF GOKANMERI VILLAGE TANK (2412020/WC/10441852) |
BP |
05/09/2022 |
245419.28 |
694896.66 |
250880 |
689445.797 |
573 | |
SANAKHEMUNDI |
PODAMARI |
MODEL TANK OF NANDIKISOR TANK (2412020/WC/10441854) |
BP |
05/09/2022 |
242039.84 |
707085.04 |
247779 |
664698.396 |
574 | |
SANAKHEMUNDI |
PODAMARI |
CHECK DAM AT RAJA GHAI NALA-I, BATAGADA (427/2020-21) (2412020/WC/10475488) |
BP |
01/11/2022 |
156906 |
430094 |
138890 |
417398 |
575 | |
SANAKHEMUNDI |
PODAMARI |
CHECK DAM AT RAJA GHAI NALA-II, BATAGADA (319/2020-21) (2412020/WC/10504843) |
BP |
01/09/2022 |
156906 |
430094 |
134375 |
364121 |
576 | |
SANAKHEMUNDI |
RAMACHANDRAPUR |
CONSTRUCTION OF MODEL TANK OF NELIA BANDHA (2412020/WC/10441212) |
BP |
05/09/2022 |
407241.13 |
978825.8 |
392330 |
1005877.3206 |
577 | |
SANAKHEMUNDI |
SAHASPUR |
MODEL TANK OF GHOSARA BANDHA (2412020/WC/10452973) |
BP |
05/09/2022 |
265209.96 |
641610.76 |
275158 |
626598.3592 |
578 | |
SANAKHEMUNDI |
T.GOBINDAPUR |
STONE BUNDING AT PALUKHOLA, PALUKHOLA (2020-21) (2412020/WC/10449944) |
BP |
03/11/2022 |
77625 |
386375 |
77426 |
342459 |
579 | |
SANAKHEMUNDI |
T.GOBINDAPUR |
STONE BUNDING AT GUDI BANI, KALIBUREI (2020-21) (2412020/WC/10449945) |
BP |
03/11/2022 |
72243 |
360757 |
71789 |
236291 |
580 | |
SANAKHEMUNDI |
T.GOBINDAPUR |
GABION STUCTURE AT KENDUPANI NALA, KALIBUREI (27/2020-21) (2412020/WC/10504842) |
BP |
01/11/2022 |
19044 |
129956 |
19135 |
117069 |
581 | |
SANAKHEMUNDI |
T.GOBINDAPUR |
LBCD AT TAPTAPANI NALA, PALUKHOLA (325/2020-21) (2412020/WC/10504845) |
BP |
05/09/2022 |
14490 |
96510 |
19350 |
88963 |
582 | |
SANAKHEMUNDI |
T.GOBINDAPUR |
STONE BUNDING AT GAON MUNDA, PALUKHOLA (324/2020-21) (2412020/WC/10506892) |
BP |
24/01/2023 |
77625 |
354375 |
70305 |
352044 |
583 | |
SANAKHEMUNDI |
PADMAPUR |
RMS AT CHAUDHARI NALA-I, PADMAPUR (326/2020-21) (2412020/WC/10504844) |
BP |
05/08/2022 |
311742 |
678258 |
307391 |
577148 |
584 | |
SHERAGADA |
ALARIGADA |
2020 21 Imp of Bandana nala at Alarigada (2412021/WC/10420322) |
BP |
01/04/2022 |
640842.32 |
310784.35 |
541886 |
0 |
585 | |
SHERAGADA |
ALARIGADA |
2020 21 Digging of Contour Trench at base of the Akada Hill at Laxmipur (2412021/WC/10429072) |
BP |
21/01/2023 |
907977.13 |
62077.85 |
413000 |
0 |
586 | |
SHERAGADA |
ALARIGADA |
2020 21 Digging of Staggered Trench at base of the Bada Sulia Hill at Alarigada (2412021/WC/10429073) |
BP |
21/01/2023 |
908494.63 |
62083.02 |
894000 |
0 |
587 | |
SHERAGADA |
ALARIGADA |
2020 21 Digging of Staggered Trench at base of the Badasulia Hill Phase 2 at Alarigada (2412021/WC/10445713) |
BP |
01/04/2022 |
851257.28 |
120087.25 |
803510 |
0 |
588 | |
SHERAGADA |
BARAMUNDULI |
2021 22 Digging of Staggered Trench At Barikote Pahad (2412021/WC/10490957) |
BP |
01/04/2022 |
929566.26 |
50433.88 |
951400 |
0 |
589 | |
SHERAGADA |
DENGAPADARA |
2021 22 Imp of Badakhama Nala from Panda chira to Sara nala at Bakilikana (2412021/WC/10481484) |
BP |
01/06/2022 |
456480.05 |
33564.71 |
325255 |
0 |
590 | |
SHERAGADA |
DENGAPADARA |
2021 22 Const of Checkdam at Nabharania Nala at Bakilikana (2412021/WC/10484211) |
BP |
06/09/2022 |
144808.1 |
331551.03 |
79410 |
203162.2 |
591 | |
SHERAGADA |
DHANANTARA |
2020 21 Digging of Contour trench at base of the Pakidi Hilla Phase 2 at lanjiapalli (2412021/WC/10457454) |
BP |
01/04/2022 |
905206.96 |
65993.15 |
888660 |
0 |
592 | |
SHERAGADA |
GOBINDAPUR |
2020 21 Digging of Contour trench at East side of the Pakidi Pahada at Gobindapur (2412021/WC/10457453) |
BP |
21/01/2023 |
908763.34 |
87689.6 |
974140 |
0 |
593 | |
SHERAGADA |
K.KARADAKANA |
2019 20 Digging of Counter Trench at base of the Arakhapada hill (2412021/WC/10406074) |
BP |
05/09/2022 |
927090.84 |
35607.88 |
926918 |
44240 |
594 | |
SHERAGADA |
K.KARADAKANA |
2019 20 Digging of Counter Trench at base of the Radheisa hill (2412021/WC/10406076) |
BP |
01/04/2022 |
938344.21 |
51206.44 |
641476 |
0 |
595 | |
SHERAGADA |
K.KARADAKANA |
2019 20 Digging of Counter Trench at base of the Garbaganda hill (2412021/WC/10406077) |
BP |
05/09/2022 |
932921.6 |
48776.2 |
930515 |
52960 |
596 | |
SHERAGADA |
K.KARADAKANA |
2019 20 Digging of Counter Trench at base of the Baduapalli hill (2412021/WC/10406078) |
BP |
05/09/2022 |
918344.7 |
41655.4 |
917926 |
50780 |
597 | |
SHERAGADA |
K.KARADAKANA |
2020 21 Digging of Contour Trench at base of the Arakhapada Hill Phase 2 at Arakhapada (2412021/WC/10445716) |
BP |
01/04/2022 |
901066.92 |
69932.76 |
897605 |
0 |
598 | |
SHERAGADA |
KHIRIDA |
2019 20 Const of Checkdam at Athia nala (2412021/WC/10409376) |
BP |
01/04/2022 |
116956.53 |
359337.95 |
122544 |
349609 |
599 | |
SHERAGADA |
KHIRIDA |
2020 21 Const of Check Dam at Lunda Bandha (2412021/WC/10422676) |
BP |
10/10/2022 |
116956.53 |
359337.95 |
106398 |
351245 |
600 | |
SHERAGADA |
KULAGADA |
2019 20 Digging of Counter tranch at Badagada Hill (2412021/WC/10406079) |
BP |
21/01/2023 |
913648.02 |
61352.42 |
962400 |
0 |
601 | |
SHERAGADA |
KULAGADA |
2019 20 Digging of Counter tranch at Ambada Hill (2412021/WC/10406080) |
BP |
21/01/2023 |
913648.02 |
61352.42 |
918600 |
0 |
602 | |
SHERAGADA |
KULAGADA |
2020 21 Digging of Contour Trench Phase 2 at the base of Ambada Hill at Kulagada (2412021/WC/10442829) |
BP |
21/01/2023 |
917302.36 |
64698.08 |
908800 |
0 |
603 | |
SHERAGADA |
NARENDRAPUR |
2019 20 Digging of Counter Counter Trench at base of the Pakidi hill Kirtipur (2412021/WC/10406082) |
BP |
23/01/2023 |
902690.46 |
74749.99 |
882000 |
0 |
604 | |
SHERAGADA |
NARENDRAPUR |
2019 20 Digging of Counter Counter Trench at base of the Pakidi hill Narendrapur (2412021/WC/10406083) |
BP |
23/01/2023 |
902690.46 |
74749.99 |
938800 |
0 |
605 | |
SHERAGADA |
NARENDRAPUR |
2020 21 Digging of Contour trench at base of the pakidi hill Phase 2 at narendrapur (2412021/WC/10439566) |
BP |
23/01/2023 |
900255.15 |
69744.85 |
894400 |
0 |
606 | |
SHERAGADA |
NARENDRAPUR |
2021 22 Digging of Staggered Trench at the base of Pakidi Hill at Narendrapur (2412021/WC/10487239) |
BP |
23/01/2023 |
948537 |
41463 |
894020 |
0 |
607 | |
SHERAGADA |
PITALA |
2020 21 Digging of Contour Trench at base of the Bhalia Khai Hill at Pakidi (2412021/WC/10448016) |
BP |
01/04/2022 |
900255.15 |
69744.64 |
902027 |
0 |
608 | |
SHERAGADA |
PITALA |
2021 22 Digging of Staggered Trench at the base of Maa Karanjei Hill at Pakidi (2412021/WC/10487236) |
BP |
01/04/2022 |
916919.1 |
53080.8 |
903930 |
0 |
609 | |
SHERAGADA |
PITALA |
2021 22 Digging of Staggered Trench at the base of Bhaliakhai Hill at Pakidi (2412021/WC/10487237) |
BP |
01/06/2022 |
916919.1 |
23080.8 |
843677 |
0 |
610 | |
SHERAGADA |
TAKARADA |
2019 20 Digging of Counter Trench at base of the Taratarini pahada Bhusunda (2412021/WC/10406084) |
BP |
21/01/2023 |
925420.08 |
50380.24 |
956400 |
0 |
611 | |
SHERAGADA |
TAKARADA |
2019 20 Digging of Counter Trench at base of the Pakidi pahada near Phulabani padhia Chikili (2412021/WC/10406085) |
BP |
21/01/2023 |
908372.87 |
61426.8 |
927600 |
0 |
612 | |
SHERAGADA |
TAKARADA |
2020 21 Digging of Contour Trench at base of the Taratarini Pahada Phase 2 at Bhusunda (2412021/WC/10445717) |
BP |
21/01/2023 |
905937.55 |
74142.46 |
905600 |
0 |
613 | |
SHERAGADA |
TAKARADA |
2020 21 Digging of Contour Trench at base of the Pakidi Pahada near Phulabani Padia Phase2 atChikili (2412021/WC/10445719) |
BP |
21/01/2023 |
906911.68 |
73322.2 |
906200 |
0 |
614 | |
SHERAGADA |
TAKARADA |
2021 22 Digging of Staggered Trench at the base of Sobhaschandrapur Hill at Bhusunda (2412021/WC/10487240) |
BP |
20/03/2023 |
954850.46 |
26549.14 |
952100 |
0 |
615 | |
SHERAGADA |
TAKARADA |
2021 22 Digging of Staggered Trench at the base of Bada Pahada at Bhusunda (2412021/WC/10487242) |
BP |
21/01/2023 |
936834.37 |
44565.63 |
933600 |
0 |
616 | |
SURADA |
ASURABANDHA |
Const of Staggered Trench at Talakupa pahada V-Taladantalingi Slno-12 22-23 (2412022/WC/10569916) |
BP |
27/01/2023 |
43335.23 |
5664.49 |
43125 |
0 |
617 | |
SURADA |
BADAGADA |
Const of Check Dam at Ghusiridanga nala (2412022/WC/10404368) |
BP |
23/08/2022 |
164807.77 |
467028.29 |
180711 |
493123 |
618 | |
SURADA |
BADAGADA |
Const. Of Check Dam at Tala Pump House nala Badagada 21-22 (2412022/WC/10530122) |
BP |
27/01/2023 |
240262.36 |
609789.81 |
240155 |
600384.9258 |
619 | |
SURADA |
BADAGADA |
Const. Of Check Dam Over Jaraunadi to Harijana Sahi nala 21-22 (2412022/WC/10530123) |
BP |
27/01/2023 |
235964.67 |
616842.9 |
224890 |
615215.5948 |
620 | |
SURADA |
BORADA |
Const of Staggered Trench at Rangamatia Pahada Slno-09 22-23 (2412022/WC/10586937) |
BP |
27/01/2023 |
90047.23 |
7952.19 |
88865 |
0 |
621 | |
SURADA |
BORADA |
Const of Staggered Trench at Uparapada Pahada Slno-11 22-23 (2412022/WC/10586939) |
BP |
27/01/2023 |
43335.23 |
4664.49 |
42175 |
0 |
622 | |
SURADA |
BORADA |
Const of Staggered Trench at KandhuKhai Pahada Slno-13 22-23 (2412022/WC/10586943) |
BP |
27/01/2023 |
43335.23 |
4664.49 |
43280 |
0 |
623 | |
SURADA |
BORASINGI |
Const. Of Recharge Pit of Sri Nanda Gouda S/o-Gobinda & 29 others at Bhaghalingi village 91-120 (2412022/WC/10484570) |
BP |
14/06/2022 |
45923.22 |
116620.08 |
26250 |
119330 |
624 | |
SURADA |
BORASINGI |
Const of Staggered Trench at Baghalingi Badua pahada V-Baghalingi Slno-70 22-23 (2412022/WC/10570087) |
BP |
27/01/2023 |
43335.23 |
5664.49 |
42350 |
0 |
625 | |
SURADA |
EKALAPUR |
Renovation of Mandia Bandha 20-21 (2412022/WC/10448685) |
BP |
26/05/2022 |
561495.54 |
228710.68 |
376250 |
0 |
626 | |
SURADA |
EKALAPUR |
Improvement and strenghtening Chandrapur village tank 20-21 (2412022/WC/10454764) |
BP |
16/09/2022 |
275604.36 |
598498.79 |
202446 |
466518 |
627 | |
SURADA |
EKALAPUR |
Renovation of Kuadei Bandha at Nuagan,20-21 (2412022/WC/10467235) |
BP |
26/05/2022 |
561495.54 |
228710.65 |
591745 |
0 |
628 | |
SURADA |
GAJALBADI |
Construction of Loose boulder Check dam at Dalakhai (2412022/WC/10401881) |
BP |
27/04/2022 |
157560.84 |
18229.54 |
147177 |
0 |
629 | |
SURADA |
GAJALBADI |
Const of staggered trench at Gurendi pahad tala padia V-Baomela Slno-87 22-23 (2412022/WC/10570133) |
BP |
30/12/2022 |
43335.23 |
5664.49 |
32130 |
0 |
630 | |
SURADA |
GAJALBADI |
Const of staggered trench at Budaguda Pahada Tala Padia V-Budaguda Slno-90 22-23 (2412022/WC/10570139) |
BP |
28/11/2022 |
43335.23 |
5664.49 |
42490 |
0 |
631 | |
SURADA |
GAJALBADI |
Const of staggered trench at Dimbabadi pahad talapadia V-Kendupali Slno-97 22-23 (2412022/WC/10570153) |
BP |
30/10/2022 |
43335.23 |
5664.49 |
41620 |
0 |
632 | |
SURADA |
GAJALBADI |
Const of staggered trench at Umagudi pahad tala padia V-Nahganda Slno-100 22-23 (2412022/WC/10570161) |
BP |
10/10/2022 |
43335.23 |
5664.49 |
43250 |
0 |
633 | |
SURADA |
GAJALBADI |
Const of staggered trench at Kandhuni Devi phad tala padia V-Rubangi Slno-102 22-23 (2412022/WC/10570167) |
BP |
30/10/2022 |
43335.23 |
5664.49 |
40597 |
0 |
634 | |
SURADA |
GAJALBADI |
Const. of Staggered Trench at Tuladi pahada Slno-18 22-23 (2412022/WC/10586954) |
BP |
18/12/2022 |
43335.23 |
5664.49 |
41386 |
0 |
635 | |
SURADA |
GAJALBADI |
Const of staggered trench at Bhutapankal pahada Slno-19 22-23 (2412022/WC/10586956) |
BP |
20/03/2023 |
43335.23 |
5664.49 |
43290 |
0 |
636 | |
SURADA |
GENJA |
Const of Modal Tank near kadeswari temple tank 20-21 (2412022/WC/10449687) |
BP |
16/09/2022 |
270784.85 |
605265.31 |
305536 |
402860 |
637 | |
SURADA |
GENJA |
Const of Staggered Trench at Kempadhepa pahada Slno-24 22-23 (2412022/WC/10586965) |
BP |
27/01/2023 |
43335.23 |
5664.49 |
42200 |
0 |
638 | |
SURADA |
GOCHHA |
Construction of Loose Boulder Check Dam at UPS Gochha (2412022/WC/10401950) |
BP |
26/05/2022 |
157560.84 |
18229.54 |
33327 |
16229 |
639 | |
SURADA |
GOCHHA |
Model tank Near Kandhuni Devi Temple at Dabiki (2412022/WC/10412038) |
BP |
14/09/2022 |
302967.29 |
618240.67 |
356454 |
273071 |
640 | |
SURADA |
GOCHHA |
Const of Staggered Trench at Kendujhara Pahada V-Dhagain Slno-114 22-23 (2412022/WC/10570194) |
BP |
30/11/2022 |
43335.23 |
5664.49 |
41785 |
0 |
641 | |
SURADA |
GOCHHA |
Const. of Staggered Trench at Dhonki pahada Slno-26 22-23 (2412022/WC/10586968) |
BP |
27/01/2023 |
43335.23 |
5664.49 |
42805 |
0 |
642 | |
SURADA |
GOCHHA |
Const. of Staggered Trench at Teeni chakia pahada Slno-27 22-23 (2412022/WC/10586969) |
BP |
28/01/2023 |
43335.23 |
5664.49 |
41495 |
0 |
643 | |
SURADA |
GOPALPURSASAN |
Const of Staggered Trench at Nila Pahada V-Bagadi Slno-123 22-23 (2412022/WC/10570216) |
BP |
27/01/2023 |
43335.23 |
5664.26 |
42750 |
0 |
644 | |
SURADA |
GOPALPURSASAN |
Const of Staggered Trench at Bata Pahada V-Bagadi Slno-124 22-23 (2412022/WC/10570219) |
BP |
28/01/2023 |
43335.23 |
5664.26 |
41454 |
0 |
645 | |
SURADA |
GOPALPURSASAN |
Const of Staggered Trench at Bahana Pahada V-Sorisabili Slno-129 22-23 (2412022/WC/10570233) |
BP |
28/01/2023 |
43335.23 |
5664.26 |
41020 |
0 |
646 | |
SURADA |
GOUDAGOTHA |
Construction of Staggered Trench at Sagadabasa Ramagudi (2412022/WC/10402329) |
BP |
12/04/2022 |
174913.67 |
4249.27 |
169326 |
0 |
647 | |
SURADA |
GOUDAGOTHA |
Const of Model tank at Goudagotha Masani bandha 20-21 (2412022/WC/10423159) |
BP |
26/05/2022 |
298090.88 |
553690.48 |
330786 |
0 |
648 | |
SURADA |
GOUDAGOTHA |
Const. Of Check Dam at Dumudumi Nala 20-21 (2412022/WC/10442746) |
BP |
29/01/2023 |
144414.6 |
523323.94 |
159390 |
0 |
649 | |
SURADA |
GOUDAGOTHA |
Const. Of Check Dam at Sarapadi nala 20-21 (2412022/WC/10442747) |
BP |
29/01/2023 |
144444.33 |
523294.21 |
43470 |
0 |
650 | |
SURADA |
GOUDAGOTHA |
Const of Check Dam at Bali Nala 20-21 (2412022/WC/10444864) |
BP |
29/01/2023 |
144482.3 |
523250.36 |
152766 |
0 |
651 | |
SURADA |
HINJALAKUDA |
Const of Modal Tank at Village tank 20-21 (2412022/WC/10446343) |
BP |
02/11/2022 |
270136.45 |
526343.65 |
169119 |
386813 |
652 | |
SURADA |
KULLANGI |
Const. of Staggered Trench at Ratnei Pahada V-Kulangi Slno-154 22-23 (2412022/WC/10570266) |
BP |
08/10/2022 |
43335.23 |
5664.26 |
43155 |
0 |
653 | |
SURADA |
KULLANGI |
Const. of Staggered Trench at Tangerei Pahada V-Kulangi Slno-155 22-23 (2412022/WC/10570269) |
BP |
08/10/2022 |
43335.23 |
5664.26 |
43155 |
0 |
654 | |
SURADA |
KULLANGI |
Const. of Staggered Trench at Boda Pahada V-Makarapalli Slno-157 22-23 (2412022/WC/10570272) |
BP |
27/01/2023 |
43335.23 |
5664.26 |
43215 |
0 |
655 | |
SURADA |
KULLANGI |
Const. of Staggered Trench at Sujana Pahada V-Makarapalli Slno-158 22-23 (2412022/WC/10570273) |
BP |
27/01/2023 |
43335.23 |
5664.26 |
43215 |
0 |
656 | |
SURADA |
KULLANGI |
Const. of Staggered Trench at Dudukhai Pahada V-Makarapalli Slno-159 22-23 (2412022/WC/10570276) |
BP |
03/12/2022 |
86670.46 |
11328.98 |
86240 |
0 |
657 | |
SURADA |
KULLANGI |
Const. of Staggered Trench at Badaghai Pahada V-Siarimala Slno-165 22-23 (2412022/WC/10570278) |
BP |
27/01/2023 |
43335.23 |
5664.26 |
43225 |
0 |
658 | |
SURADA |
KULLANGI |
Const. of Staggered Trench at Jamakhalia Pahada V-Makarapalli Slno-156 22-23 (2412022/WC/10570282) |
BP |
03/12/2022 |
86670.46 |
11329.03 |
86590 |
0 |
659 | |
SURADA |
KULLANGI |
Const of Staggered Trench at Bausadiha Pahada Slno-67 22-23 (2412022/WC/10586689) |
BP |
27/01/2023 |
86670.46 |
11328.99 |
84280 |
0 |
660 | |
SURADA |
KULLANGI |
Const of Staggered Trench at Saura Pahada Slno-68 22-23 (2412022/WC/10586690) |
BP |
27/01/2023 |
86670.46 |
11328.99 |
84210 |
0 |
661 | |
SURADA |
KULLANGI |
Const of Staggered Trench at Nili Mara Pahada Slno-64 22-23 (2412022/WC/10586692) |
BP |
28/01/2023 |
86670.46 |
11328.53 |
83028 |
0 |
662 | |
SURADA |
KULLANGI |
Const of Staggered Trench at Bhalu Dhimira Pahada Slno-47 22-23 (2412022/WC/10587062) |
BP |
27/01/2023 |
86670.46 |
11328.99 |
86640 |
0 |
663 | |
SURADA |
KULLANGI |
Const of Staggered Trench at Mali Pahada Slno-55 22-23 (2412022/WC/10587142) |
BP |
28/01/2023 |
43335.23 |
5664.26 |
40880 |
0 |
664 | |
SURADA |
KULLANGI |
Const of Staggered Trench at Majhia Pahada Slno-56 22-23 (2412022/WC/10587143) |
BP |
28/01/2023 |
86670.46 |
11328.53 |
83240 |
0 |
665 | |
SURADA |
KULLANGI |
Const of Staggered Trench at Hatipathara Pahada Slno-57 22-23 (2412022/WC/10587144) |
BP |
27/01/2023 |
43335.23 |
5664.26 |
43080 |
0 |
666 | |
SURADA |
KULLANGI |
Const of Staggered Trench at Tusurakendhu Pahada Slno-58 22-23 (2412022/WC/10587145) |
BP |
25/11/2022 |
86670.46 |
11328.53 |
84560 |
0 |
667 | |
SURADA |
KULLANGI |
Const of Staggered Trench at Similidiha Pahada Slno-59 22-23 (2412022/WC/10587146) |
BP |
27/01/2023 |
86670.46 |
11328.53 |
86250 |
0 |
668 | |
SURADA |
KULLANGI |
Const of Staggered Trench at Bhuiya Pahada Slno-60 22-23 (2412022/WC/10587147) |
BP |
27/01/2023 |
43335.23 |
5664.26 |
42715 |
0 |
669 | |
SURADA |
KULLANGI |
Const of Staggered Trench at Kandha Pahada Slno-61 22-23 (2412022/WC/10587148) |
BP |
27/01/2023 |
43335.23 |
5664.26 |
42700 |
0 |
670 | |
SURADA |
LATHIPADA |
Construction of Loose boulder Check Dam at Jyotinagar Nala (2412022/WC/10402265) |
BP |
12/04/2022 |
225794.65 |
51555.72 |
229200 |
0 |
671 | |
SURADA |
LATHIPADA |
Construction of Loose Boulder Check Dam at Bibhutia Nala (2412022/WC/10402713) |
BP |
12/04/2022 |
225794.65 |
51555.72 |
225009 |
0 |
672 | |
SURADA |
MERIKOTE |
Const of New Check Dam at Jamajoli Ghai Nala 20-21 (2412022/WC/10428973) |
BP |
26/05/2022 |
239842.89 |
507927.44 |
217143 |
260706 |
673 | |
SURADA |
MERIKOTE |
Const of Staggered Trench at Rangamatia Pahada V-Kumbharjhili Slno-171 22-23 (2412022/WC/10570377) |
BP |
15/11/2022 |
43335.23 |
5664.49 |
42700 |
0 |
674 | |
SURADA |
MERIKOTE |
Const of Staggered Trench at Bandaghati Pahada V-Mahisikhata Slno-176 22-23 (2412022/WC/10570387) |
BP |
27/01/2023 |
43335.23 |
5664.49 |
42560 |
0 |
675 | |
SURADA |
MERIKOTE |
Const of Staggered Trench at Bangiri Pahada V-Santinagar Slno-180 22-23 (2412022/WC/10570399) |
BP |
27/01/2023 |
43335.23 |
5664.49 |
43100 |
0 |
676 | |
SURADA |
NUAGADA |
Const of staggered trench at Nilakanthapur Village Pahada V-Kesara Slno-191 22-23 (2412022/WC/10570417) |
BP |
10/10/2022 |
43335.23 |
5664.49 |
42000 |
0 |
677 | |
SURADA |
PALAKATU |
Const of Model Tank at Kalimandira Tank,20-21 (2412022/WC/10459209) |
BP |
12/04/2022 |
270224.88 |
602191.47 |
271618 |
615804 |
678 | |
SURADA |
PALAKATU |
Const of Model Tank at Thakurani mandira Tank 20-21 (2412022/WC/10471405) |
BP |
12/04/2022 |
270148.17 |
606346.16 |
272496 |
614992 |
679 | |
SURADA |
PALAKATU |
Const. of Staggered Trench at Barakhala pahada Slno-75 22-23 (2412022/WC/10586681) |
BP |
27/01/2023 |
90891.42 |
7108 |
90754 |
0 |
680 | |
SURADA |
PALAKATU |
Const. of Staggered Trench at Sanatota pahada Slno-78 22-23 (2412022/WC/10586684) |
BP |
27/01/2023 |
90891.42 |
7108 |
89244 |
0 |
681 | |
SURADA |
PALAKATU |
Const. of Staggered Trench at Banahana pahada Slno-79 22-23 (2412022/WC/10586685) |
BP |
27/01/2023 |
90891.42 |
7108 |
89766 |
0 |
682 | |
SURADA |
PALAKATU |
Const. of Staggered Trench at Khuntakhala pahada Slno-80 22-23 (2412022/WC/10586686) |
BP |
27/01/2023 |
90891.42 |
7108 |
90833 |
0 |
683 | |
SURADA |
PALAKATU |
Const. of Staggered Trench at Batakhala pahada Slno-81 22-23 (2412022/WC/10586687) |
BP |
28/01/2023 |
90891.42 |
7108 |
83028 |
0 |
684 | |
SURADA |
PALAKATU |
Const. of Staggered Trench at Karunapoi pahada Slno-82 22-23 (2412022/WC/10586688) |
BP |
27/01/2023 |
90891.42 |
7108 |
89998 |
0 |
685 | |
SURADA |
SARABADI |
Const of Staggered Trench at Banjara pahada Slno-85 22-23 (2412022/WC/10587160) |
BP |
28/01/2023 |
43335.23 |
5664.49 |
41470 |
0 |
686 | |
SURADA |
SARABADI |
Const of Staggered Trench at Khariguda pahada Slno-88 22-23 (2412022/WC/10587164) |
BP |
28/01/2023 |
86389.06 |
9863.71 |
83144 |
0 |
687 | |
SURADA |
SARABADI |
Const of Staggered Trench at Kandhunidevi pahada Slno-91 22-23 (2412022/WC/10587170) |
BP |
28/01/2023 |
86389.06 |
9863.71 |
82418 |
0 |
688 | |
SURADA |
SIDHAPUR |
Construction of Checkdam at Sitaamba Ghai 20-21 (2412022/WC/10469817) |
BP |
28/07/2022 |
168583.96 |
605283.12 |
170982 |
614427 |
689 | |
SURADA |
SIDHAPUR |
Const of Staggered Trench at Masani Pahada Slno-92 22-23 (2412022/WC/10587068) |
BP |
27/01/2023 |
43335.23 |
5664.49 |
43120 |
0 |
690 | |
SURADA |
SIDHAPUR |
Const of Staggered Trench at Saguani Pahada Slno-94 22-23 (2412022/WC/10587172) |
BP |
27/01/2023 |
43335.23 |
5664.49 |
42860 |
0 |
691 | |
SURADA |
SIDHAPUR |
Const of Staggered Trench at Chakundi Pahada Slno-96 22-23 (2412022/WC/10587173) |
BP |
27/01/2023 |
43335.23 |
5664.49 |
42945 |
0 |
692 | |
SURADA |
SIDHAPUR |
Const of Staggered Trench at Kalanji Bagada Pahada Slno-97 22-23 (2412022/WC/10587175) |
BP |
27/01/2023 |
43335.23 |
5664.49 |
43000 |
0 |
693 | |
SURADA |
SIDHAPUR |
Const of Staggered Trench at Sitaamba Pahada Slno-98 22-23 (2412022/WC/10587176) |
BP |
27/01/2023 |
43335.23 |
5664.49 |
42140 |
0 |
694 | |
SURADA |
SIDHAPUR |
Const of Staggered Trench at Bali Dhepa Pahada Slno-99 22-23 (2412022/WC/10587177) |
BP |
27/01/2023 |
43335.23 |
5664.49 |
43215 |
0 |
695 | |
SURADA |
BHAGABANPUR |
Const of Model tank Maniakathi village tank 20-21 (2412022/WC/10422123) |
BP |
13/03/2023 |
270084.36 |
570152.42 |
228942 |
441757 |
696 | |
SURADA |
BHAGABANPUR |
Const. Of rain water harvestings structure at Bhagabanapur GP Office 20-21 (2412022/WC/10438305) |
BP |
23/08/2022 |
15389.63 |
43058.53 |
18216 |
41184 |
697 | |
SURADA |
BHAGABANPUR |
Const. of Staggered Trench at Jhagadai Pahada V-Gunduribadi Slno-50 22-23 (2412022/WC/10570032) |
BP |
28/01/2023 |
43335.23 |
5664.49 |
40950 |
0 |
698 | |
SURADA |
BHAGABANPUR |
Const. of Staggered Trench at Domuhani pahada V-Padaraisuni Slno-60 22-23 (2412022/WC/10570071) |
BP |
29/11/2022 |
43335.23 |
5664.49 |
40250 |
0 |
699 | |
SURADA |
BHAGABANPUR |
Const. of Staggered Trench at Madana pahada V-Padaraisuni Slno-62 22-23 (2412022/WC/10570077) |
BP |
28/01/2023 |
43335.23 |
5664.49 |
41300 |
0 |