Work Category:Water Conservation And Water Harversting
State : ODISHA
District : NABARANGAPUR
Block : PAPADAHANDI
Panchayat : PONDIKOTE .
S.No Work Name
(Work Code)
Water Body Name Location Water Area in Hact. Executing Agency
Work Status
Work Type
Estimated cost As per Tech. Dtl(In Lakhs)
Financial Sanction Amount
Name Type Villages Khata No. Plot No. Present Status End Status Labour Material
1 Const of Protection Wall on Bamandei Nallah at Chandili Nuaguda near Lobo Gouda Land(MLA LR NO-289) (2430007/WC/10900735)
(2023-2024)
Bamandei Nallah Talab/Nadi CHANDILI     5 Panchayat samiti/PS/Block Non-existent Constr of Flood/ Diversion Channel for Community Constr of Flood/ Diversion Channel for Community/Approved 0.9780946  3.8419801  5 
2 Const of Flood Protection Wall with Check Dam at Laibanpadar Phase-1(MLA LR NO-50) (2430007018/WC/10901220)
(2023-2024)
Const of Flood Protection Wall with Check Dam at Laibanpadar Phase-1(MLA LR NO-50) Check Dam PRADHNIGUDA     4500 Gram Panchayat Non-existent Construction of Community Water Harvesting Ponds Construction of Community Water Harvesting Ponds/Approved 1.7924755  6.9641052  9 
Report Completed