Activity | Activity Unit | Activity Quantity | Unit Cost | Total Cost(In Rs.) |
Earth work exavation in hard soil & gravelly soil with all lead and lift including rough dressing and breaking of clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth as per direction of engineer in charge. |
Cum |
141.5 |
101.06 |
14299.99 |
Spreading of Gravel |
Cum |
70.02 |
65.35 |
4575.81 |
| | | | |