Activity | Activity Unit | Activity Quantity | Unit Cost | Total Cost(In Rs.) |
Cement concrete with 4 cm size H.G. metal in (1:4:8) |
cum |
16.88 |
739.19 |
12473.83 |
Earth work in hard soil or gravelly soil within all lead and lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth and as per the direction of engineer-in-charge. |
Cum |
185.45 |
90.83 |
16844.54 |
Earth work in ordinary soil all lead and lift including rough dressing and breaking of clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth as per direction of engineer in charge. |
cum |
12.15 |
65.4 |
794.61 |
Filling in foundation and plinth with sand watered and rammed |
cum |
4.05 |
1.24 |
5.01 |
RCC M20 Grade concrete with 20 mm downgraded HG Chips |
Cum |
4.5 |
866.06 |
3897.28 |
| | | | |