Activity | Activity Unit | Activity Quantity | Unit Cost | Total Cost(In Rs.) |
Cost of MS Rod |
Qtl. |
7.4 |
100.8 |
746.08 |
Earth work in hard soil or gravelly soil within all lead and lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth and as per the direction of engineer-in-charge. |
Cum |
312.1 |
90.18 |
28145.08 |
RCC M20 Grade concrete with 20 mm downgraded HG Chips |
Cum |
32.39 |
158.35 |
5128.93 |
| | | | |