Activity | Activity Unit | Activity Quantity | Unit Cost | Total Cost(In Rs.) |
Cement concrete [1:4:8] using 40mm sizeB.H.G. metal including all cost conveyancetaxes,royalit,watering curring, etc. complete |
Cum |
52.43 |
501.62 |
26298.33 |
Earth work in excavation in foundation including all leads and lifts including rough dressing and breaking clods deposited the excavated materials away from work site. |
cum |
45.63 |
65.79 |
3002 |
Earth work in excavation in Hard soil including all leads and lifts including rough dressing and breaking clods deposited the excavated materials away from work site. |
cum |
283.73 |
72.59 |
20595.69 |
| | | | |