Activity | Activity Unit | Activity Quantity | Unit Cost | Total Cost(In Rs.) |
Cement concrete [1:2:4] using 12mm size H.G. Chips including all cost conveyancetaxes,royalit,watering curring, etc. complete |
Cum |
0.16 |
579.6 |
91.55 |
Cement concrete [1:4:8] using 40mm sizeB.H.G. metal including all cost conveyancetaxes,royalit,watering curring, etc. complete |
Cum |
27.52 |
491.4 |
13525.64 |
Earth work exavation in hard soil & gravelly soil with all lead and lift including rough dressing and breaking of clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth as per direction of engineer in charge. |
Cum |
41.08 |
89.04 |
3657.81 |
Filling foundation and plinth with sandincluding all leads and lift watering, rammingcost, conveyance, taxes and royalty etc. |
Cum |
2.22 |
15.57 |
34.54 |
R.C.C [1:1.5:3] using 12mm size B.H.G.chips including all cost conveyance hoisting laying taxes,royalit,watering curring, & centering shuttering etc.excluding costof iron rod . |
Cum |
5.35 |
580.12 |
3105.87 |
| | | | |