Activity | Activity Unit | Activity Quantity | Unit Cost | Total Cost(In Rs.) |
Cement concrete M15 with hard granite crusher broken course aggregate of maximum nominal size of 40mm and down grade in foundation concrete as directed by the EIC |
cum |
41.98 |
20 |
839.6 |
Earth work in excavation in foundation in hard soil including all leads and lifts including rough dressing and breaking clods deposited the excavated materials away from work site. |
cum |
114.67 |
95 |
10893.43 |
Filling foundation and plinth with sandincluding all leads and lift watering, rammingcost, conveyance, taxes and royalty etc. |
Cum |
2.08 |
2.08 |
4.33 |
R.C.C M 20 using 20 mm downgraded C.B.H.G Chips including all cost etc |
Cum |
5.27 |
25 |
131.81 |
| | | | |