Activity | Activity Unit | Activity Quantity | Unit Cost | Total Cost(In Rs.) |
Earth work in excavation in foundation in hard soil including all leads and lifts including rough dressing and breaking clods deposited the excavated materials away from work site. |
cum |
9.28 |
88.33 |
819.39 |
Labour for conveying stacks from work site and spreading moorum over the road surface to the required gread, thickness & camber for sub-base including watering ,rolling with P.R.R, including Cost & Conveyance of Material , all labour and T&P required for the work including running & hire charges of P.R.R. etc. complete. |
Cum |
19.87 |
491.4 |
9765.1 |
| | | | |