Activity | Activity Unit | Activity Quantity | Unit Cost | Total Cost(In Rs.) |
CC (1.2.4) using 12 mm Size HG Chips |
cum |
41.98 |
20 |
839.6 |
Earth work in excavation in Hard soil including all leads and lifts including rough dressing and breaking clods deposited the excavated materials away from work site. |
cum |
114.67 |
95 |
10893.56 |
Filling foundation and plinth with sandincluding all leads and lift watering, rammingcost, conveyance, taxes and royalty etc. |
Cum |
2.08 |
2 |
4.16 |
RCC M20 Grade concrete with 20 mm downgraded HG Chips |
Cum |
5.27 |
25 |
131.81 |
| | | | |