Activity | Activity Unit | Activity Quantity | Unit Cost | Total Cost(In Rs.) |
Cement concrete [1:3:6] using 40mm sizeB.H.G. metal including all cost conveyancetaxes,royalit,watering curring, etc. complete |
Cum |
13.64 |
491.4 |
6703.48 |
Earth work exavation in ordinary soil with all lead and lift including rough dressing and breaking of clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth as per direction of engineer in charge. |
Cum |
101.06 |
65.23 |
6592.31 |
Filling foundation and plinth with sandincluding all leads and lift watering, rammingcost, conveyance, taxes and royalty etc. |
Cum |
20.14 |
15.57 |
313.56 |
| | | | |