Activity | Activity Unit | Activity Quantity | Unit Cost | Total Cost(In Rs.) |
Earth work in hard soil or gravelly soil within all lead and lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth and as per the direction of engineer-in-charge. |
Cum |
48.02 |
83.04 |
3987.24 |
RCC M20 Grade concrete with 20 mm downgraded HG Chips |
Cum |
44.85 |
733.71 |
32909.88 |
| | | | |