Activity | Activity Unit | Activity Quantity | Unit Cost | Total Cost(In Rs.) |
Cement concrete with 4 cm size H.G. metal in (1:4:8) |
cum |
14.23 |
491.4 |
6994.98 |
Earth work in hard soil or gravelly soil within all lead and lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth and as per the direction of engineer-in-charge. |
Cum |
65.17 |
89.04 |
5802.51 |
Filling in foundation and plinth with sand watered and rammed |
cum |
3.77 |
15.12 |
56.97 |
| | | | |