Activity | Activity Unit | Activity Quantity | Unit Cost | Total Cost(In Rs.) |
Cement concrete [1:2:4] using 12mm size H.G. Chips including all cost conveyancetaxes,royalit,watering curring, etc. complete |
Cum |
0.75 |
579.6 |
434.7 |
Cement concrete [1:3:6] using 40mm sizeB.H.G. metal including all cost conveyancetaxes,royalit,watering curring, etc. complete |
Cum |
37.71 |
491.4 |
18530.69 |
Cement concrete [1:4:8] using 40mm sizeB.H.G. metal including all cost conveyancetaxes,royalit,watering curring, etc. complete |
Cum |
7.87 |
491.4 |
3867.32 |
Earth work in excavation in foundation including all leads and lifts including rough dressing and breaking clods deposited the excavated materials away from work site. |
cum |
62.49 |
108.99 |
6810.79 |
Earth work in excavation in Ordinary soil including all leads and lifts including rough dressing and breaking clods deposited the excavated materials away from work site. |
cum |
64.15 |
73.17 |
4693.86 |
Filling foundation and plinth with sandincluding all leads and lift watering, rammingcost, conveyance, taxes and royalty etc. |
Cum |
85.77 |
68.47 |
5872.67 |
R.C.C [1:1.5:3] using 12mm size B.H.G.chips including all cost conveyance hoisting laying taxes,royalit,watering curring, & centering shuttering etc.excluding costof iron rod . |
Cum |
3.66 |
579.6 |
2121.34 |
| | | | |