Activity | Activity Unit | Activity Quantity | Unit Cost | Total Cost(In Rs.) |
16mm thick c.p. in cement mental(1.6) |
sqm |
4.5 |
1309.11 |
5891 |
B.m.in Cement mortar(1.6) |
cum |
4.38 |
100.8 |
441.5 |
Earth work exavation in ordinary soil with all lead and lift including rough dressing and breaking of clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth as per direction of engineer in charge. |
Cum |
55.13 |
90.83 |
5007.49 |
| | | | |