Activity | Activity Unit | Activity Quantity | Unit Cost | Total Cost(In Rs.) |
Earth work exavation in hard soil & gravelly soil with all lead and lift including rough dressing and breaking of clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth as per direction of engineer in charge. |
Cum |
82.25 |
101.05 |
8311.26 |
Fine dressing and turfing with initial lead of 50m and 1.5m initial lift |
Sqm |
202.5 |
9.8 |
1984.5 |
| | | | |