Activity | Activity Unit | Activity Quantity | Unit Cost | Total Cost(In Rs.) |
Cement concrete with 12 mm size H.G. chips in (1:2:4) |
cum |
0.36 |
4066.67 |
1464 |
Cement concrete with 4 cm size H.G. metal in (1:4:8) |
cum |
0.36 |
2919.44 |
1051 |
Earth work in ordinary soil all lead and lift including rough dressing and breaking of clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth as per direction of engineer in charge. |
cum |
12.78 |
49.3 |
630 |
Filling in foundation and plinth with sand watered and rammed |
cum |
6.21 |
335.43 |
2083 |
K.B.Brick masonary with [1:6] C.M. in Foundation & Plinth including watering,curring ,cost, conveyance, taxes and royalty etc. complete |
cum |
7.93 |
103.4 |
820 |
| | | | |