Activity | Activity Unit | Activity Quantity | Unit Cost | Total Cost(In Rs.) |
Cement concrete [1:2:4] using 12mm size H.G. Chips including all cost conveyancetaxes,royalit,watering curring, etc. complete |
Cum |
1.19 |
579.6 |
691.06 |
Cement concrete [1:4:8] using 40mm sizeB.H.G. metal including all cost conveyancetaxes,royalit,watering curring, etc. complete |
Cum |
29.68 |
491.4 |
14586.1 |
Earth work exavation in hard soil & gravelly soil with all lead and lift including rough dressing and breaking of clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth as per direction of engineer in charge. |
Cum |
15 |
89.04 |
1335.39 |
Filling foundation and plinth with sandincluding all leads and lift watering, rammingcost, conveyance, taxes and royalty etc. |
Cum |
1.37 |
15.57 |
21.41 |
| | | | |