Activity | Activity Unit | Activity Quantity | Unit Cost | Total Cost(In Rs.) |
Cement concrete M20 grade with crushed granite coarse aggregate of size 20mm and down graded mixed in batching and mixing plant including cost of all materials, machineries and labour and transportation of mixed concrete within initial lead of 1km by mechanical means and laying in dams, barrages, power house and pen stock with all lifts/delifts upto 1.5m height above average ground level in respective blocks as per direction of Engineer-incharge. |
Cum |
4.5 |
1369.34 |
6162.02 |
Earth work in excavation in foundation in hard soil including all leads and lifts including rough dressing and breaking clods deposited the excavated materials away from work site. |
cum |
177 |
90.11 |
15949.47 |
Labour for cutting,bending, binding,straightening and tying the rails and placingin position excluding cost of binding wire, M.S. / T.S. rod etc. complete. |
Qntl |
4.14 |
100.8 |
417.31 |
Labour for spreading moorum and consolidation with HRR including watering including cost and conveyance of moorum |
Cum |
360 |
57.12 |
20563.2 |
| | | | |