Bill No. |
Bill Date (DD/MM/YYYY |
Material |
Total Amount (In Rupees) |
Amount Paid (In Rupees) |
15 |
21/03/2022 |
0002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper |
1230.28 |
1230.28 |
15 |
21/03/2022 |
0295-Stone Aggregate(single size):20 mm nominal size |
6264.6 |
6264.6 |
15 |
21/03/2022 |
0297-Stone Aggregate(single size): 10 mm nominal size |
4412.8 |
4412.8 |
15 |
21/03/2022 |
0982-Coarse sand (zone III) |
696.2512 |
696.2512 |
15 |
21/03/2022 |
2202-Stone aggregate below 40 mm nominal size |
10276.2095 |
10276.2095 |
15 |
21/03/2022 |
2203-Coarse sand |
5201.7782 |
5201.7782 |
15 |
21/03/2022 |
2205-Steel |
13780 |
13780 |
15 |
21/03/2022 |
7335-Binding wire |
672.3 |
672.3 |
15 |
21/03/2022 |
7801-Ceramic Glazed Tiles Ist quality 300 x 300 mm in all shades and designs of White, Ivory, grey, Fume Red brown etc. |
8330.148 |
8330.148 |
15 |
21/03/2022 |
7896-Vitrified tile |
22460.1285 |
22460.1285 |
15 |
21/03/2022 |
MR8001-Mason (special) |
13485 |
13485 |
15 |
21/03/2022 |
MR8026-Fly ash bricks of 25 Cm. x 12 Cm. x 8 Cm. size having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance ± 2 % |
22500 |
22500 |
15 |
21/03/2022 |
MR8060-Sal bullahs 75mm. to 120mm. mean dia up to 5.5m. long. |
4182.72 |
4182.72 |
15 |
21/03/2022 |
MR8070-Non-sal bullahs 125mm. mean dia of any length. |
435.68 |
435.68 |
15 |
21/03/2022 |
MR8110-Cement |
44113.72 |
44113.72 |
15 |
21/03/2022 |
MR8124-Black glass (I.S.I.) 5mm |
1500 |
1500 |
15 |
21/03/2022 |
MR8186-GENERATOR 33KVA |
834.8 |
834.8 |
15 |
21/03/2022 |
MR8187-SCAFFOLDING CHARGES FOR BRICK MASONRY WORK |
596.31 |
596.31 |
16 |
21/03/2022 |
10-Miscellaneous /Contingencies charges |
1890 |
1890 |
16 |
21/03/2022 |
1198-Second class kail wood in planks |
7725.4335 |
7725.4335 |
16 |
21/03/2022 |
2201-Bricks |
5900 |
5900 |
16 |
21/03/2022 |
2205-Steel |
322.5633 |
322.5633 |
16 |
21/03/2022 |
2209-Cement |
2316.872 |
2316.872 |
16 |
21/03/2022 |
3-Display Board |
1500 |
1500 |
16 |
21/03/2022 |
MR8111-HYSD bar (Reinforcement) |
113997.79 |
113997.79 |
16 |
21/03/2022 |
MR8190-CARRIAGE OF WOOD FOR CENTRING & SHUTTERING WORK |
144.9 |
144.9 |
|
|
Total Cash payment(In Rupees) |
294770.2842 |
294770.2842 |