Bill No. |
Bill Date (DD/MM/YYYY |
Material |
Total Amount (In Rupees) |
Amount Paid (In Rupees) |
353 |
05/04/2022 |
0002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper |
26.55 |
26.55 |
353 |
05/04/2022 |
0084-Hire charges of Diesel truck - 9 tonne (without POL) |
112.1 |
112.1 |
353 |
05/04/2022 |
0297-Stone Aggregate(single size): 10 mm nominal size |
6.3 |
6.3 |
353 |
05/04/2022 |
0367-Portland Cement |
881.76 |
881.76 |
353 |
05/04/2022 |
0983-Fine sand (zone IV) |
505.8375 |
505.8375 |
353 |
05/04/2022 |
1174-Red sand stone slab 45 mm to 50 mm thick (un-dressed) |
994.73 |
994.73 |
353 |
05/04/2022 |
1235-Diesel oil |
31.96 |
31.96 |
353 |
05/04/2022 |
5001-Mobil oil |
1.829 |
1.829 |
353 |
05/04/2022 |
7900-Modular common burnt clay bricks of class designation 7.5 |
2108.9432 |
2108.9432 |
353 |
05/04/2022 |
MR11640-uPVC Pipe (Working Pressure 4kg/cm square) single socketed pipe 110mm dia |
800 |
800 |
353 |
05/04/2022 |
MR11641-uPVC Pipe (Working Pressure 4kg/cm square) rubber (seal) ring 100mm dia |
20.75 |
20.75 |
353 |
05/04/2022 |
MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT |
57.75 |
57.75 |
353 |
05/04/2022 |
MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry) |
27.28 |
27.28 |
|
|
Total Cash payment(In Rupees) |
5575.7897 |
5575.7897 |