Expenditure on Material

[ Work Code- 1527001009/IF/93393042894015913]
Bill No. Bill Date
(DD/MM/YYYY
Material Total Amount
(In Rupees)
Amount Paid
(In Rupees)
9 05/04/2023 0367-Portland Cement 767.8 767.8
9 05/04/2023 0982-Coarse sand (zone III) 1122.7592 1122.7592
9 05/04/2023 3-Display Board / CIB 500 500
9 05/04/2023 5-GST 943.15 943.15
9 05/04/2023 7318-Plasticizer / super plasticizer 36.7784 36.7784
9 05/04/2023 MR9431-Broken stone aggregate 12 mm to 10 mm size 77.1426 77.1426
9 05/04/2023 MR9432-Broken stone aggregate 20 mm size 141.4281 141.4281
9 05/04/2023 MR9433-Broken stone aggregate 40 mm size 35.7144 35.7144
9 05/04/2023 MR9609-Add 64 64
9 05/04/2023 MR9675-HOM of Vibrator 0.71 days 1.69 1.69
9 05/04/2023 MR9677-Mixer (concrete small used in culvert) 5.04 5.04
9 05/04/2023 MR9678-Mixer (concrete) - 1 cum Capacity 27.12 27.12
9 05/04/2023 MR9724-Mason Class II (with tools) 75.816 75.816
9 05/04/2023 MR9725-Mason Class I (with tools) 56.706 56.706
9 05/04/2023 MR9752-Add Handling , loading and unloading at 1% on Material 7.5 7.5
9 05/04/2023 MR9757-Transportation/loading and unloading of material/lifting of material /Wastage/Unforeseen charges/Miscellaneous which are necessary during execution. 528.03 528.03
9 05/04/2023 MR9759-Add providing and removing scaffolding at 3% on Labour 8.72 8.72
9 05/04/2023 MR9762-Add sundries charges at 1 % on Material 20.83 20.83
9 05/04/2023 MR9773-Add watering charges at 1 % on Material 16.45 16.45
9 05/04/2023 MR9804-Stone Chistler Class II 63.18 63.18
9 05/04/2023 MR9862-RCC Cap 1000 mm dia, 100 mm thick 750 750
9 05/04/2023 MR9867-Charcoal 150 150
9 05/04/2023 MR9868-Aqua Nylon mesh 281.25 281.25
9 05/04/2023 MR9929-Latrite 440.45 440.45
9 05/04/2023 MR9961-Cost of 6.5mm M.S. Coil 559.185 559.185
9 05/04/2023 MR9962-Fabrication charges. 181.5 181.5
9 05/04/2023 MR9963-Transportation charges of materials beyond 5 KM @ 10% 175.41 175.41
9 05/04/2023 MR9977-PVC pipe of 6kg\cum,90 mm 838.52 838.52
Total Cash payment(In Rupees) 7876.1697 7876.1697